Post Job Free

Resume

Sign in

Environmental Specialist Hse

Location:
Abu Dhabi, United Arab Emirates
Posted:
April 06, 2022

Contact this candidate

Resume:

Fadi Hafiz

Address Abu Dhabi

Contact 054*******

adqpil@r.postjobfree.com adqpil@r.postjobfree.com

Professional Summary

A dedicated, Mature, highly Qualified, Multilingual, and Pro-Active Occupational Health, Safety and Risk Manager / Consultant (HSE Dept. Head Manager) with 20 Years of managerial and technical work experience with exposure to various projects involving civil, process, architectural, erection, infrastructural, heavy machinery, operations, plumbing, electro-mechanical, chemical, landscaping and irrigations works in building construction and plants in combination with housing and catering contractors at projects’ camps with numerous residents. Outstanding leadership, interpersonal, presentation, and training skills with proven ability to interact effectively with technicians and management at all levels. Ability to develop and issue HSE Manual and Procedures according to the scope of project.

Ensure to lead the way with a safety mindset, always to think safe, work safe, be safe. Work Experience

07/2002 - 09/2020

Al Jaber Group - Abu Dhabi

Head of HSE Dept. Construction

• Influence safety culture and drive accountability at assigned sites and facilities to achieve and maintain a high performing internal HSE rating.

• Evaluate operational practices to determine methods to eliminate or control workplace hazards.

• Lead the investigation of all safety process events, including documentation, root cause analysis, improvement recommendations, and agreed action implementation.

• Ensure job safety and environmental analyses/job hazard analysis are conducted as required.

• In charge of onsite supervision to insure all Safety procedure are well implemented.

• Identify risk, to ensure all preventive actions are available and prepare a sufficient precautions action to avoid any accident.

• Prepare Dept. Yearly Budget.

• Incharge of updating all new local & int’l standards to sync with all projects.

• Prepare quarterly reports for CEO.

• Fully incharge of the procurement purchase of all safety materials required, by searching for the best quality and price.

• Maintaining good relation & coordination with other Dept’s.

• Provide weekly basis training to ensure Safety awareness of all staff available on work sites.

• In charge of interviewing new staff required for the Dept.

• In charge of preparing HSE plan & safe work procedures to all in charge work sites.

• Develop a Zero Accident strategy in all staff minds and monitor it on weekly basis.

• Prepare accident / incident property damage reports (PDR) and forward it to management.

• Conducting Safety meeting with task performers and providing Safety guidelines in their day-to day operations.

• Establish HSE management system.

• Ensure that the HSE management system in properly implemented and performing to requirements in all locations and spheres of operation within the organization.

• Ensuring that reports on the performance of the HSE management system are presented to top management for review a basis for improvement.

• Ensure that the HSE policy Objective is communicated to all concerned.

• Establishment & maintenance of process for communication regarding effectiveness of HSE system.

• Responsible of Management of HSE Audits.

• To anticipate, identify and evaluate hazardous safety conditions and environmental risks.

• Develop complex hazard control designs, methods, procedures and programs.

• Implement, administers and advises others on hazard and risk control programs.

• Ensure incident reporting, investigation and corrective actions processes are implemented and followed at all times.

• Maintain current level of knowledge on applicable government, industry and corporate guidelines.

• Assist Engineering with or by completing safety evaluations of new or relocated machinery.

• Lead interaction with Engineering groups for the evaluation and improvement of new or modified equipment, processes and installations for the division. April 2001 — May 2002

Metro Real Estate Management. Bahrain

Senior Manager, Operations.

• In charge of controlling and running Mall & Hotels in Bahrain.

• Manage all administrative tasks related to Shopping mall coordinating with retailers, tenants, suppliers, various internal teams such as operations, leasing, finance and legal.

• Handle all queries and complaints from Tenants when received in the Mall and through customer service.

• Insure forwarding the same to the concerned department, including follow up for timely resolution as per established Mall policies and procedures.

• Handle all tenants requests concerning to NOCs, permits etc., and ensure that it is processed on a timely basis for issuance.

• Prepare and issue tenant notices, circulars, warning and penalty notice as advised by mall manager.

• Follow-up on tenant communications till completion.

• Prepare PR / LPOs for various operational requirements and ensure its tracking and follow up with the concerned department for timely procurement.

• Provide all necessary data / reports on a periodic basis pertaining to Centre operations to the Senior / Manager Operations for review, resolution of issues and prompt decision making.

• Manage office supplies and all other inventory related to mall offices to ensure smooth functioning of the mall operations and management offices.

• Ensure compliance with the company Code of Conduct, Departmental policies and HR Policies and Procedures at all times.

• Planning and arranging all skills and projects according to what needs to be finished throughout the day

July 1992 — Jan 2001

Isnad / ADNOC Group - Abu Dhabi

• Jetty Supervisor. (Safety Dept)

• In charge of safe departing and arrivals of the vessels.

• Loading and offloading materials from supply ships to the oil rigs according to Manifest.

• Inspection of lifting gears on daily bases.

• Conducting training and tool box according to the Matrix and when required.

• Weekly Jetty Inspection to insure all Int’l Standards and company polices are complied.

• Assist Third Party companies and Tenants on the base incase of emergencies.

• Proactively support and its commitment to safety, ensuring that all operations are risk assessed, adequately resourced and all appropriate procedures as defined, permits and licenses are in place.

• Ensure compliance with all health safety environmental and regulatory demands.

• Manage and be accountable for the deployment of the requirements of the HMS system in the port.

• Ensure that in liaison with Marine Standards all accidents are fully investigated and incident reports prepared.

• Work with Marine standards to promote safe operations, quality assurance and security of the business

Education

Corllins University

Master of Science (M.Sc)

Environmental Health and Safety Management HSE Certifications

• NEBOSH (UK) – IGC (Level 3) – Occupational Safety & Health (Distinction)

• Environmental, Health and Safety Management Certificate. (London, UK)

• ISO 9001 Quality Management System (QMS) Auditor.

• IOSH Certificate – Managing Safely in Construction (UK)

• IOSH Certificate – Working Safely (UK)

• NASP Diploma – Workplace Health and Safety (USA)

• OSHA 30 – General/Construction Health and Safety Standards (USA)

• EPA Campus – Environmental Specialist certification.

• Safe Erection and Dismantling of Scaffolds.

• Accident Investigations and Reporting Course.

• Safety Manual Organization.

• Safety Course.

• Fire Fighting and Emergency Response.

• Advanced First Aid.

• Spill Response and Chemical handling.

• Material Handling and Jetty Safety Awareness Course.

• Fire Risk Assessment and Safe System.

• The Principle of Health & Safety / Behavioral Safety / Accident Investigation.

• Advance Risk Assessment Course.

• Supervisor Skills.

• Heavy Duty Equipment’s Safety.

• Workplace Awareness.

Languages

Arabic — Native

English — Proficient

Additional Skills

• Certified in risk management and health/safety management.

• Ability to prioritize tasks especially when handling an accident or incident.

• Excellent communication and interpersonal skills.

• Ability to recognize when safety conditions need improvement.

• Thorough knowledge of health and safety laws and guidelines.

• Extensive attention to detail to distinguish safety hazards.

• Ability to provide detailed reports and develop safety procedures.

• Excellent understanding of data analysis and risk assessment.

• Excellent organizational, leadership and motivational skills.

• Training Skills

References

Available upon request

Powered by TCPDF (www.tcpdf.org)

(Project/s Delivered) (Client) (Consultant) (Scope of Work - Construction)

(Contract

Value)

(Milestones/Achievements)

Al Raha Gardens Villas Development, Abu

Dhabi

ALDAR GHD

1380 Villas (Phase-1)

28 Villas (Phase-2)

AED 2.5

Billion

25 Million LTI Free Manhours

(Cumulative).

ALDAR Certificate for the HSE

Manager (Mr. Fadi Hafiz) for valuable

commitment towards HSE.

ALDAR Certificate for Al Jaber

Buildings for valuable commitment

towards HSE.

Al Jaber Tower - Fujairah (high-end private

project) and numerous owner’s

developments and one-off buildings

Al Jaber Group

DEWAN/AL

TORATH

3 Basements + 44 Storey

Tower

Mid-rise Buildings and

Villas at various UAE

regions.

AED 1.9

Billion

15 Million LTI Free Manhours in

various projects (Cumulative).

Victory Heights Main Gold Residential Villas,

Dubai Sports City, Dubai

Victory Heights

Development

MACE

583 Villas and Infrastructure

Works

AED 1.25

Billion

37 Million LTI Free Manhours

(Cumulative).

Achieved 2nd Place in the Safety

Survey conducted by PMC (MACE

International) among overall projects

running in GCC

Waterfront Veneto Villas/Townhouses, Dubai NAKHEEL CHSS 109 Villas (Construction and

Handover)

AED 1

Billion

1 Million LTI Free Manhours

(Cumulative).

Saadiyat Beach Development (Phase-1 &2

and Jawaher), Abu Dhabi

TDIC Parsons

355 Villas/77 Villas/83 Villas

(Construction and Handover)

AED 2.1

Billion

20 Million LTI Free Manhours

(Cumulative)

Al Falah Community Villas Development ALDAR FLUOR

2080 Villas, 48 Substations, 15

Mosques and Infrastructure

Works (Construction and

Handover)

AED 2.7

Billion

50 Million LTI Free Manhours

(Cumulative)

ALDAR Villas Contractor of the Month

numerous times.

Petroleum Institute Research Centre (PIRC) ADNOC Hill International 1 Basement+3 Floors (Building

and Handover)

AED 800

Million

8.5 Million LTI Free Manhours

(Cumulative)

Petroleum Institute Staff Accommodation

(PISA)

ADNOC SKEC

5 Buildings (G+11) & 20 Villas

(Special Recovery)

AED 465

Million

6 Million LTI Free Manhours

(Cumulative)

Hidd Al Saadiyat Villas Development (Eco-

Point)

SDIC Katib & Alami

486 Villas (Construction &

Handover)

AED 2

Billion

20 Million LTI Free Manhours

(Cumulative)

Ruwais Housing Complex Expansion (Phase-

4)

ADNOC Dorsch Gruppe DC

40 Buildings (G+5) / 1920 Units +

Infrastructure

AED 2.67

Billion

73 Million LTI Free Manhours

(Cumulative).

Special Appreciation for

commencement of HSE Campaigns.

ADNOC Married Staff Accommodation,

Ruwais

ADNOC Dorsch Gruppe DC

5 Buildings (G+12) + Amenities +

External works

AED 380

Million

2.9 Million LTI Free Manhours

(Cumulative).

ENEC Apartment Complex, Western Region ENEC Al Torath 5-Star Hotel, 640 Rooms, 460

Car Parking, Hard/Soft

Landscape, Guest House, Visitor

Centre and Asphalt Road

AED 600

Million

6 Million LTI Free Manhours

(Cumulative).

Sea Palace Development Project, Abu Dhabi Royal Group Al Torath Dolphin House, Trellis Link and

Entertainment Pavilion

AED 240

Million

Over 264 Thousand LTI Free

Manhours (Cumulative).

ADNOC HQ Complex Development Works

(Phase-3)

ADNOC Hill International

Underground tunnel, Oil rig

area, Roof helipad, Welcome

Centre, South lobby building, VIP

car parking, Road-18 asphalt

work.

AED 112

Million

1.78 Million LTI Free Manhours

(Cumulative).

ADNOC Best HSE Performance in the

Year-2018.

Emirati Housing Neighborhoods – Al Saad

and Sweihan, Al Ain

MUSANADA Al Suweidi

306 Villas, 204 Villas, Support

Facilities, Substations, Mosques,

Community Centres, Retails

Buildings, Pump Stations,

Infrastructure work and asphalt

roads +

AED 1.4

Billion

36 Million LTI Free Manhours

(Cumulative).

Appreciation Letter from

MUSANADA for HSE Performance.

Appreciation from Al Ain

Municipality for compliance with

Best Practice.



Contact this candidate