RESUME
ALBERT.S
RC Street,
Kanur (po),
Srimushnam (Tk),
Cuddalore (Dt),
Tamilnadu. - 608701
E-Mail ID:*********@**********.***
Mobile No: +91-909*******,909-***-****
CAREER OBJECTIVE
To work in a firm with a professional work driven environment where I can utilize and apply my knowledge, skills which would enable me as a graduate to grow while fulfilling organizational goals. BASIC ACEDEMIC CREDENTIALS
Completed ITI (ELECTRICIAN)
Completed SSLC
ELECTRICAL LICENCE DETAILS
B.license Regonised by tamilnadu government
License no: B.137676
EB License regonised by tamilnadu government
License no: 21837(EB Grade)
WORK EXPERINCE:0
Still worked in IK ENTERPRISES Project Work HYUNDAI MOTOR INDIA Chennai.
• Power distribution board And Lighting distribution board, ELDB and UPDB existing DB removal and new DB instillation.
• To check the amps rating in DB the rating is not even to share the load in R,Y,B in DB side
• To discuss the maintenance Electrical clearance is ok to taken the document sign in load sharing sheet
• Finally hand over in maintenance
• All types of power point box existing one removal and new one installation and connected to the load
• Three phase and single phase fan existing removal and new one installation to connect the power point
• Tempera plug and socket three phase and single phase existing removal and new installation
• All types of LED light fitting removal in existing and new one installation and to route the power cable in light fitting to DB panel
• SSB panel side all types of power cable removal and breaker modification and existing breaker removal and new breaker install and finally power cable crimping the lug and termination in breaker
• Tightness checking the bus bar and all size of cable in all SSB panel and DB
• All types of cable tray and lighting raceway existing is removal and new tray laying and fixing
• All types of enclosure box and circuit breaker old one removal and new one installation and power cable should be connected in DB
• All types of MCB,ELCB,MCCB,RCCB existing removal and new one installation
• MS support measuring and plan the DB installation
• 25mm and 32mm and 50mm dia GI conduit pipe old removal and new pipe laying and fixing the work spot
• LT cable on 3core 1.5,2.5,4,6 Cuflex cable laying and crimping the lug’s and end termination
• LT cable on 4core 10,16,25,50,70,95 CuAr and AluAr cable laying and crimping the lug’s and end termination
• The all types cable laying in office area and shop floor area and trench hidden area and landscape area by using the cable tray and raceway and GI conduit pipe
• To check the cable resistance value and continuity checking by using the megger meter and clamp meter note the value in document to sign the end user and maintenance
• To check the lighting arrester physically and cable continuity checking
• New earth pit installation
• Street pole installation and cable termination
WORK EXPERINCE:1
One year act Apprentice Training Hyundai Motor india (p) ltd,Chennai, CNC m/c Eletrical maintance
MCB,contractor,relay, Replacement work
Bush button selected switch replacement work
3 phase,1 phase motor replacement work
5S
750KVA 1000KVA DG power maintenance work
PERSONAL DETAILS
Father’s Name : SINGARAYAR
Date of Birth : 31.05.1985
Language Known : Tamil & English
Marital Status : Married
Nationality/Religion : Indian / Christian
Interest & Hobbies
: cricket, volleyball, internet browsing
DECLARATION
I do hereby declare that the above information is true to the best of my knowledge. Place: ALBERT.S
Date: (Signature)