Position Applied for: Carder-Piping
Supplementary Qualification:
Piping/Mech Supv, Piping Checker, Piping Designer, Insulation Supervisor
Experienced:
Has 10 years work experience in construction for the expansion, revamp, rejuvenation and shutdown works in the field of oil & gas, pharmaceutical, petrochemical and power plant industry. Also, with 20 years experience in design (Offshore/Onshore) in oil & gas refinery, power plant, petrochemical, fertilizer plant, pharmaceutical plant, rubber plant, deep water oil, flow-lines, greenfield & brownfield.
Duties and Responsibilities (Construction)
Responsible for the supervision of fabrication, erection and installation of piping spools, valves and pipe support
according to isometric drawing and general piping arrangement. Coordinate and communicate with other discipline civil, scaffolding and welding supervisor for the completion of installation of lines at site. Responsible for planned progress schedule without compromising quality and safety. Perform and execute visual and random checking of lines for initial punch list report. Coordinate to client representative for the schedule of hydro test, leak test, air test and visual test for final acceptance of lines. Coordinate and communicate to QC department for painting and insulation purposes. Responsible for safety related to workplace and workers/contractor. Attend daily toolbox meeting at site and carry out reporting progress in order to achieve planned schedule. Ensure site housekeeping are well maintained and strictly follow proper work sequence and work flow. To ensure quality assurance on works completed and to achieve delivery deadline, target with no safety incident. Constantly seek improvement in productivity and processes in the course of work. Ensure work daily assigned job are carryout effectively and productively in order to meet client specification and project requirements. Responsible for day to day on site project supervision and monitoring the actual project accomplishment. Ensure and enforce safety regulation and requirements are complied with.
Duties and Responsibilities (Design)
Has been involved in greenfield, brownfield, revamp, expansion and rejuvenation project for oil & gas industry including pharmaceutical plant, petrochemical plant, rubber plant, power plant, deep water oil and flow line (offshore/onshore) for local and abroad. Interpretation of vendor drawings/other discipline drawings for civil & structural deliverable requirement. Ensuring all deliverable comply with quality as per company/client specification and standard. Interface and coordinate to other discipline regarding the documents need to complete the piping layout in the model. Perform and execute piping checking in the model using (SPR) software for critical and non-critical lines around process/utility and pipe rack area. Responsible for checking vendor drawing, check/back check isometric drawing and instruct designers to incorporate all changes, internal comments, client comments made during/after modeling and resolve different clashes in the model. Perform checking of (SPE) pipe support detail and coordinate to (PFA) group for the information drawing that need to incorporate in the model.
Summary of Experience:
Design Work (Offshore) 3 years Name of Company
Position: Piping Checker
Project Involved:
1) MALIKAI EPC TLP (Deep Water Oil) : Technip (Malaysia)
2) Flowlines, Greenfield & Brownfield (OXY Occidental Petroleum) : Technip (Qatar)
3) Sabah Shell F23 Facilities Rejuvenation : Ranhill Worley (Malaysia)
Design Work (Onshore) 17 years
Position: Piping Checker/Snr Piping Designer
Project Involved:
1) Al Razi AR-3&4 C02 Injection KSA : (MHIAP) Asia Pacific PTE Ltd
2) (GPUFP) Ghorasal Polash Urea Fertilizer Project Bangladesh : (MHIAP) Asia Pacific PTE Ltd 3) MISUMI Thermal Power Station (FGD) Project Japan : (MHIAP) Asia Pacific PTE Ltd 4) Quail Run Energy Center Carbon Capture Project Feed Study : (MHIAP) Asia Pacific PTE Ltd 5) Prairie State Energy Campus Carbon Capture Project Feed Study : (MHIAP) Asia Pacific PTE Ltd 6) UNF (Fertilizer) Project (Republic of Uzbekistan) : (MHIAP) Asia Pacific PTE Ltd. 7) TGF Fertilizer Project (Turkmenistan Republic) : MHPS Technical Services Corp. 8) PK 0ffgas Project Methanol Plant (KSA) : (MIES) Asia Pacific PTE Ltd. 9) ZCS-SBR2 Project Synthetic Rubber Plant (Singapore) : (MIES) Asia Pacific PTE Ltd. 10) NSRP Complex Project (Vietnam) : Technip (Malaysia) 11) (TAF) Ammonia Fertilizer Project (Tatarstan) : J & S Consultancy (Phils.) 12) Thailand Propylene Oxide : Foster Wheeler (Thailand) 13) ELEFSIS Refinery Upgrade Project (GREECE) : Tecnicas Reunidas (Spain) 14) Phenolic Facilities (KSA) : Tecnicas Reunidas (Spain) 15) Bukom Refinery Modification (Singapore) : Foster Wheeler (Thailand) 16) Crude Distillation Unit 3 Revamp (Thailand) : Foster Wheeler (Thailand) 17) (Melut Basin) Oil Development Project (Sudan) : Ranhill Worley (Malaysia) 18) (SMPO) Nanhai Petrochemical Project (China) : Technip (Malaysia) 19) Beecham Tea Effluent Neutralization Project (Singapore) : Foster Wheeler (Singapore) 20) R & D Facility Project (Singapore) : Foster Wheeler (Singapore) 21) Hamaca Upgrader Project (Venezuela) : Fluor Daniel, Inc. (Phils) 22) Refinery Upgrader Project (Canada) : Fluor Daniel, Inc. (Phils) 23) LHC-2 Ethane Cracker Project (Argentina) : Fluor Daniel, Inc. (Phils) 24) Polyethylene and Polypropylene (Taiwan) : J & S Consultancy (Phils.) 25) Caltex Diesel Shipping Facilities (Philippines) : C.M.I. Contractor (Phils)
Construction Work (Onshore) 10 years
Position: Piping Supervisor
Project Involved:
1) Dismantling of Caltex Refinery (Philippines) : Ventech International (Phils)
2) GSK PB3 Expansion Project (Singapore) : Foster Wheeler (Singapore)
3) Shurtan Gas Chemical Complex (Uzbekistan) : ABB Soimi SPA (Uzbekistan)
4) Ethylene and Polyethylene Project (Philippines) : MHI LTD. (Phils)
5) Caltex Debottle Necking Project (Philippines) : C.M.I. Contractor (Phils)
6) 1 x 1000 MW Qurrayah Power (KSA) : MHI Ltd. (KSA)
7) National Power Corporation Phils (Complex Expansion) : MHI LTD. (Phils)
8) 7th Arak Refinery (Arak, Iran) : Saipem Ltd. Iran
Training and Seminars attended:
1)Hydrogen Sulfide & Breathing Apparatus Training - OXY in house training Qatar ( 2011)
2)ISSOW Course - OXY in house training Qatar (2011)
3)HUET & SEA SURVIVAL - Enertech Qatar Qatar (2011)
4)PDS) Piping Modeling - Fluor Daniel Phils (1998)
5)(DRV) Design Review - Fluor Daniel Phils (1998)
6)(PDS) Equipment Modeling - Fluor Daniel Phils (1998)
7)Isometric Checking (Phase III) - Flour Daniel Phils (2000)
8)PDMS Design Review - Ranhill Worley Malaysia (2004)
9)SPR/Navisworks - Technip Malaysia (2014)
10)SP3D Piping/Equipment/Structural Modelling - MHI LTD. Phils (2014)
Computers Skills:
1)Intergraph PDS – 3D Piping Modeling (Plant Design System)
2)Smart Plant Review (SPR)
3)SP3D Basic Piping/Equipment Modelling - MHI Ltd. Phils (2014)
(MHIAP) Mitsubishi Heavy Industries Asia Pacific Manila Branch (Formerly MIES)
27th Floor Robinsons Equitable Tower, ADB Ave. Corner Poveda St. Ortigas Center, Pasig City Philippines
Position: Piping Checker
Sept 29, 2014 to Oct 29, 2021
Project Involved:
1)Al Razi C02 Injection proj (KSA)
2)GPUFP Ghorasal Polash Urea Fertilizer Project (Bangladesh)
3)MISUMI Thermal Power Station FGD (Japan)
4)Quail Run Energy Center Carbon Capture Project Feed Study (USA)
5)Prairie State Energy Campus Carbon Capture Project Feed Study (Italy)
6)UNF (Fertilizer) Project (Republic of Uzbekistan)
7)TGF Fertilizer Project (Republic of Turkmenistan)
8)PK 0ffgas Project Methanol Plant (KSA)
9)ZCS-SBR2 Project Synthetic Rubber Plant (Singapore)
Reason for Leaving: Finished Contract
Technip Malaysia
2nd Floor, Wisma Technip 241 Jalan Tun Rasak, KL Malaysia
Position: Piping Checker
April 22, 2013 to August 21, 2014
Project Involve:
1)NSRP Complex Project (Vietnam)
2)MALIKAI EPC TLP Project Deep Water Oil (Sabah, Malaysia)
Reason for Living: Finished Contract
J & S Consultancy Services Co. Inc. Phils.
6/F MGF Champaca Bldg., 156 Amorsolo St. Legaspi Village, Makati City
March 19, 2012 to April 19, 2013
Position: Piping Checker
Project Involve: TAF Tatarstan Ammonia Fertilizer Project (Tatarstan)
Reason for Living: Working in Abroad
Technip Qatar
5th Flr. HBK Tower, Doha Qatar P. O. Box 2119
Position: Piping Checker
Jan. 29/11 to Feb.23/12
Project Involved: Flowlines Greenfield & Brownfield at Almorjan Facility and PS-1 (Oxy, Petroleum Qatar)
1.Remote Wellhead Platform Modification
2.Multi-Phase Flowmeter (MPFM) Design
3.Installation of New Wellhead System
4.Conversion of Existing Wellhead System
5.Slot Recovery Wellhead System
6.Minimum Facility Platform (MFP Greenfield & Brownfield Phase)
7.PS1 Upstream Complex System Modification
Reason for Living: Finished Contract
Ventech International Services Phils. Inc.
Position: Construction Piping Supervisor
23rd Floor Insular Life Corporate Center, Filinvest Corporate City, Alabang Muntinlupa City Phils.
Project Involved: Dismantling of Caltex Refinery San Pascual, Batangas
April 05, 2010 to Jan 05, 2011
Reason for leaving: Working in Abroad
Foster Wheeler Thailand
Position: Piping Checker/Designer
1st Floor, Talaythong Tower 53 Moo 9,Sukhumvit Road, Thungsukla, Sriracha, Chonburi 20230, Thailand
April 06, 2009 to March 31 2010
Project Involve: Thailand Propylene Oxide
Reason for leaving: Finished Contract
Tecnicas Reunidas
Edifacio Bami 4th floor Madrid, Spain
Position: PDS Piping Designer
Jan 15 2008 to Dec. 19, 2008
Project Involve:
1)Elefsis Refinery Upgrade Project (Athens, Greece)
2)Phenolics Facilities (Jubail, KSA)
Reason for leaving: Finished Contract
Foster Wheeler Thailand
Position: Snr Piping Designer
1st Floor, Talaythong Tower 53 Moo 9,Sukhumvit Road, Thungsukla, Sriracha, Chonburi 20230, Thailand
Jan 15, 2006 to Jan. 14, 2008
Project Involve:
1)Shell Bukom Refinery Modification Project (Singapore)
2)Crude Distillation Unit 3 Revamp Project (Sriracha, Chonburi Thailand)
Reason for leaving: Finished Contract
Ranhill Worley SDN BHD. KL, Malaysia
Position: Piping Checker
Oct. 04, 2004 to Dec. 07, 2005
Project Involve:
1)F23 Facilities Rejuvenation Project (Sabah, Malaysia)
2)Melut Basin Oil Development Project (Sudan)
Reason for Leaving: Finished Project
Technip Malaysia
Position: PDS Piping Designer (Seconded)
Project Involve: SMPO Nanhai Petrochemical Project (Huizhou, PRC)
March 01, 2004 to Sept 18, 2004
Reason for Leaving: Finished Project
J & S Consultancy Services Co. Inc. Phils.
6/F MGF Champaca Bldg., 156 Amorsolo St. Legaspi Village, Makati City
Position: Piping Designer
June 19, 2003 to Feb. 27, 2004
Project Involve:
1) Dubai Electricity & Water Authority (Dubai)
2) SRT Sakai LNG Receiving (Japan)
Foster Wheeler UK
Tuas Pioneer Sector 3, Singapore
Position: Piping Supervisor/Piping Inspector
Feb. 27 2002 to June 01, 2003
Project Involve: PB3 Expansion Project GlaxoSmithKline (Singapore)
Reason for Leaving: Finished Project
Foster Wheeler Singapore
Position: PDS Piping Designer
Project Involved: R & D Facility Project (Tuas, Singapore)
August 26, 2001 to Feb 26 2002
Reason for Leaving: Finished Contract, transfer to Construction
Fluor Daniel Inc. Phils
Position: PDS Piping Designer
Project Title: Hamaca Upgrader Project (Jose Venezuela)
Feb. 26, 2001 to August 24, 2001
Reason for Leaving: Finished Contract
ABB Soimi SPA
Qarshi, Republic of Uzbekistan
Position: Piping Supervisor
June 15, 2000 to Feb 15, 2001
Project Involve: Ethylene/Polyethylene Project Uzbekneftigas (Shurtan Gas Chemical Complex)
Reason for Leaving: Finished Project
Fluor Daniel Inc. Phils
Position: PDS Piping Designer
Nov. 09, 1998 to June 04, 2000
Project Involve:
1)Refinery Upgrader Project (Saint John N.B. Canada)
2)LHC-2 Ethane Cracker (Bajia Blanca Argentina)
Reason for Leaving: Finished Project
J & S Consultancy Services Co. Inc. Phils.
6/F MGF Champaca Bldg., 156 Amorsolo St. Legaspi Village, Makati City
Position: Piping Designer
Project Involve: Polyethylene and Polypropylene (Buli, Taiwan)
June 05, 1998 to Oct. 05, 1998
Reason for Leaving: Transfer to Fluor
Mitsubishi Heavy Industries Ltd. Phils
Position: Insulation Supervisor
Project Involve: Polyethylene and Polypropylene Facilities J.G. Summit Petrochemical Corp. (Batangas)
Dec. 07, 1997 to April 07, 1998
Reason for Leaving: Finished Project
CMI General Contractor Phils
Position: Piping Supervisor (Fabrication/Erection/Installation)
Client: Caltex Refinery Phils. Inc.
Project Involve: Debottle Necking Project & Shutdown Works (Caltex Refinery, San Pascual Batangas)
Oct. 02, 1994 to Dec. 02, 1997
Reason for Leaving: Transfer to MHI
Mitsubishi Heavy Industries Ltd. Phils
Position: Piping Supervisor (Fabrication/Erection/Installation)
Project Involve: Batangas Coal Fired Thermal Plant (National Power Corporation Calaca, Batangas)
Dec. 09, 1993 to Sept. 09, 1994
Reason for Leaving: Finished Project
CMI General Contractor Phils
Position: Piping Designer
Project Involve: Diesel Shipping Facilities (Caltex Refinery, San Pascual Batangas)
Oct. 26, 1992 to Nov. 07, 1993
Reason for Leaving: Transfer to MHI
Saipem Company Ltd. Iran
Position: Piping Supervisor (Fabrication/Erection/Installation)
Client: Iran Oil Company
Project Title: 7th Arak Refinery (Arak, Iran)
Oct. 19, 1991 to Oct. 19, 1992
Mitsubishi Heavy Industries Ltd KSA
Position: Draftsman /Piping Supervisor (Seconded)
Project Title: 1 x 1000 MW Qurrayah Power Plant (KSA)
May 09, 1989 to June 09, 1991
Michrel Eng’g
Batangas City, Philippines
Piping/Mechanical Draftsman
Feb 1986 to April 1989
CMI General Contractor Phils
Pipefitter/Fabricator
Jan 1984 to Jan 1986
PERSONAL DETAILS:
NAME: DELFIN M. ROSALES
EDUCATION: (Formerly, Western Philippine Colleges) University of
Batangas, Bachelor of Science in Mechanical Engineering
(3rd year, Undergraduate) Oct 1988
(Formerly, Western Philippine Colleges) University of
Batangas, Drafting Technology (Graduate)
June 1983 - Oct 1985
High School, (Formerly, Western Philippine Colleges)
University of Batangas, Batangas City, Philippines
June 1978 - Mar 1983
BIRTH PLACE: N. Lat Subd. Sta. Rita Karsada Batangas City. Phils.
BIRTH DATE: September 05, 1966
CIVIL STATUS: Married
PASSPORT NO.: P1637470B
ADDRESS: N. Lat Subd. Sta Rita Karsada Batangas City, Philippines
EMAIL ADDRESS: ************@*****.***
Mobile No. (Philippines) +63-945*******
Land line (Philippines) +63-043-*******
TIN No: 177-620-253
SSS: 04-05909544
Phil Health: 09-025028185-3
DELFIN M. ROSALES