Post Job Free

Resume

Sign in

Foster Wheeler Energy Center

Location:
Santa Rita Karsada, Batangas, Philippines
Posted:
April 04, 2022

Contact this candidate

Resume:

Position Applied for: Carder-Piping

Supplementary Qualification:

Piping/Mech Supv, Piping Checker, Piping Designer, Insulation Supervisor

Experienced:

Has 10 years work experience in construction for the expansion, revamp, rejuvenation and shutdown works in the field of oil & gas, pharmaceutical, petrochemical and power plant industry. Also, with 20 years experience in design (Offshore/Onshore) in oil & gas refinery, power plant, petrochemical, fertilizer plant, pharmaceutical plant, rubber plant, deep water oil, flow-lines, greenfield & brownfield.

Duties and Responsibilities (Construction)

Responsible for the supervision of fabrication, erection and installation of piping spools, valves and pipe support

according to isometric drawing and general piping arrangement. Coordinate and communicate with other discipline civil, scaffolding and welding supervisor for the completion of installation of lines at site. Responsible for planned progress schedule without compromising quality and safety. Perform and execute visual and random checking of lines for initial punch list report. Coordinate to client representative for the schedule of hydro test, leak test, air test and visual test for final acceptance of lines. Coordinate and communicate to QC department for painting and insulation purposes. Responsible for safety related to workplace and workers/contractor. Attend daily toolbox meeting at site and carry out reporting progress in order to achieve planned schedule. Ensure site housekeeping are well maintained and strictly follow proper work sequence and work flow. To ensure quality assurance on works completed and to achieve delivery deadline, target with no safety incident. Constantly seek improvement in productivity and processes in the course of work. Ensure work daily assigned job are carryout effectively and productively in order to meet client specification and project requirements. Responsible for day to day on site project supervision and monitoring the actual project accomplishment. Ensure and enforce safety regulation and requirements are complied with.

Duties and Responsibilities (Design)

Has been involved in greenfield, brownfield, revamp, expansion and rejuvenation project for oil & gas industry including pharmaceutical plant, petrochemical plant, rubber plant, power plant, deep water oil and flow line (offshore/onshore) for local and abroad. Interpretation of vendor drawings/other discipline drawings for civil & structural deliverable requirement. Ensuring all deliverable comply with quality as per company/client specification and standard. Interface and coordinate to other discipline regarding the documents need to complete the piping layout in the model. Perform and execute piping checking in the model using (SPR) software for critical and non-critical lines around process/utility and pipe rack area. Responsible for checking vendor drawing, check/back check isometric drawing and instruct designers to incorporate all changes, internal comments, client comments made during/after modeling and resolve different clashes in the model. Perform checking of (SPE) pipe support detail and coordinate to (PFA) group for the information drawing that need to incorporate in the model.

Summary of Experience:

Design Work (Offshore) 3 years Name of Company

Position: Piping Checker

Project Involved:

1) MALIKAI EPC TLP (Deep Water Oil) : Technip (Malaysia)

2) Flowlines, Greenfield & Brownfield (OXY Occidental Petroleum) : Technip (Qatar)

3) Sabah Shell F23 Facilities Rejuvenation : Ranhill Worley (Malaysia)

Design Work (Onshore) 17 years

Position: Piping Checker/Snr Piping Designer

Project Involved:

1) Al Razi AR-3&4 C02 Injection KSA : (MHIAP) Asia Pacific PTE Ltd

2) (GPUFP) Ghorasal Polash Urea Fertilizer Project Bangladesh : (MHIAP) Asia Pacific PTE Ltd 3) MISUMI Thermal Power Station (FGD) Project Japan : (MHIAP) Asia Pacific PTE Ltd 4) Quail Run Energy Center Carbon Capture Project Feed Study : (MHIAP) Asia Pacific PTE Ltd 5) Prairie State Energy Campus Carbon Capture Project Feed Study : (MHIAP) Asia Pacific PTE Ltd 6) UNF (Fertilizer) Project (Republic of Uzbekistan) : (MHIAP) Asia Pacific PTE Ltd. 7) TGF Fertilizer Project (Turkmenistan Republic) : MHPS Technical Services Corp. 8) PK 0ffgas Project Methanol Plant (KSA) : (MIES) Asia Pacific PTE Ltd. 9) ZCS-SBR2 Project Synthetic Rubber Plant (Singapore) : (MIES) Asia Pacific PTE Ltd. 10) NSRP Complex Project (Vietnam) : Technip (Malaysia) 11) (TAF) Ammonia Fertilizer Project (Tatarstan) : J & S Consultancy (Phils.) 12) Thailand Propylene Oxide : Foster Wheeler (Thailand) 13) ELEFSIS Refinery Upgrade Project (GREECE) : Tecnicas Reunidas (Spain) 14) Phenolic Facilities (KSA) : Tecnicas Reunidas (Spain) 15) Bukom Refinery Modification (Singapore) : Foster Wheeler (Thailand) 16) Crude Distillation Unit 3 Revamp (Thailand) : Foster Wheeler (Thailand) 17) (Melut Basin) Oil Development Project (Sudan) : Ranhill Worley (Malaysia) 18) (SMPO) Nanhai Petrochemical Project (China) : Technip (Malaysia) 19) Beecham Tea Effluent Neutralization Project (Singapore) : Foster Wheeler (Singapore) 20) R & D Facility Project (Singapore) : Foster Wheeler (Singapore) 21) Hamaca Upgrader Project (Venezuela) : Fluor Daniel, Inc. (Phils) 22) Refinery Upgrader Project (Canada) : Fluor Daniel, Inc. (Phils) 23) LHC-2 Ethane Cracker Project (Argentina) : Fluor Daniel, Inc. (Phils) 24) Polyethylene and Polypropylene (Taiwan) : J & S Consultancy (Phils.) 25) Caltex Diesel Shipping Facilities (Philippines) : C.M.I. Contractor (Phils)

Construction Work (Onshore) 10 years

Position: Piping Supervisor

Project Involved:

1) Dismantling of Caltex Refinery (Philippines) : Ventech International (Phils)

2) GSK PB3 Expansion Project (Singapore) : Foster Wheeler (Singapore)

3) Shurtan Gas Chemical Complex (Uzbekistan) : ABB Soimi SPA (Uzbekistan)

4) Ethylene and Polyethylene Project (Philippines) : MHI LTD. (Phils)

5) Caltex Debottle Necking Project (Philippines) : C.M.I. Contractor (Phils)

6) 1 x 1000 MW Qurrayah Power (KSA) : MHI Ltd. (KSA)

7) National Power Corporation Phils (Complex Expansion) : MHI LTD. (Phils)

8) 7th Arak Refinery (Arak, Iran) : Saipem Ltd. Iran

Training and Seminars attended:

1)Hydrogen Sulfide & Breathing Apparatus Training - OXY in house training Qatar ( 2011)

2)ISSOW Course - OXY in house training Qatar (2011)

3)HUET & SEA SURVIVAL - Enertech Qatar Qatar (2011)

4)PDS) Piping Modeling - Fluor Daniel Phils (1998)

5)(DRV) Design Review - Fluor Daniel Phils (1998)

6)(PDS) Equipment Modeling - Fluor Daniel Phils (1998)

7)Isometric Checking (Phase III) - Flour Daniel Phils (2000)

8)PDMS Design Review - Ranhill Worley Malaysia (2004)

9)SPR/Navisworks - Technip Malaysia (2014)

10)SP3D Piping/Equipment/Structural Modelling - MHI LTD. Phils (2014)

Computers Skills:

1)Intergraph PDS – 3D Piping Modeling (Plant Design System)

2)Smart Plant Review (SPR)

3)SP3D Basic Piping/Equipment Modelling - MHI Ltd. Phils (2014)

(MHIAP) Mitsubishi Heavy Industries Asia Pacific Manila Branch (Formerly MIES)

27th Floor Robinsons Equitable Tower, ADB Ave. Corner Poveda St. Ortigas Center, Pasig City Philippines

Position: Piping Checker

Sept 29, 2014 to Oct 29, 2021

Project Involved:

1)Al Razi C02 Injection proj (KSA)

2)GPUFP Ghorasal Polash Urea Fertilizer Project (Bangladesh)

3)MISUMI Thermal Power Station FGD (Japan)

4)Quail Run Energy Center Carbon Capture Project Feed Study (USA)

5)Prairie State Energy Campus Carbon Capture Project Feed Study (Italy)

6)UNF (Fertilizer) Project (Republic of Uzbekistan)

7)TGF Fertilizer Project (Republic of Turkmenistan)

8)PK 0ffgas Project Methanol Plant (KSA)

9)ZCS-SBR2 Project Synthetic Rubber Plant (Singapore)

Reason for Leaving: Finished Contract

Technip Malaysia

2nd Floor, Wisma Technip 241 Jalan Tun Rasak, KL Malaysia

Position: Piping Checker

April 22, 2013 to August 21, 2014

Project Involve:

1)NSRP Complex Project (Vietnam)

2)MALIKAI EPC TLP Project Deep Water Oil (Sabah, Malaysia)

Reason for Living: Finished Contract

J & S Consultancy Services Co. Inc. Phils.

6/F MGF Champaca Bldg., 156 Amorsolo St. Legaspi Village, Makati City

March 19, 2012 to April 19, 2013

Position: Piping Checker

Project Involve: TAF Tatarstan Ammonia Fertilizer Project (Tatarstan)

Reason for Living: Working in Abroad

Technip Qatar

5th Flr. HBK Tower, Doha Qatar P. O. Box 2119

Position: Piping Checker

Jan. 29/11 to Feb.23/12

Project Involved: Flowlines Greenfield & Brownfield at Almorjan Facility and PS-1 (Oxy, Petroleum Qatar)

1.Remote Wellhead Platform Modification

2.Multi-Phase Flowmeter (MPFM) Design

3.Installation of New Wellhead System

4.Conversion of Existing Wellhead System

5.Slot Recovery Wellhead System

6.Minimum Facility Platform (MFP Greenfield & Brownfield Phase)

7.PS1 Upstream Complex System Modification

Reason for Living: Finished Contract

Ventech International Services Phils. Inc.

Position: Construction Piping Supervisor

23rd Floor Insular Life Corporate Center, Filinvest Corporate City, Alabang Muntinlupa City Phils.

Project Involved: Dismantling of Caltex Refinery San Pascual, Batangas

April 05, 2010 to Jan 05, 2011

Reason for leaving: Working in Abroad

Foster Wheeler Thailand

Position: Piping Checker/Designer

1st Floor, Talaythong Tower 53 Moo 9,Sukhumvit Road, Thungsukla, Sriracha, Chonburi 20230, Thailand

April 06, 2009 to March 31 2010

Project Involve: Thailand Propylene Oxide

Reason for leaving: Finished Contract

Tecnicas Reunidas

Edifacio Bami 4th floor Madrid, Spain

Position: PDS Piping Designer

Jan 15 2008 to Dec. 19, 2008

Project Involve:

1)Elefsis Refinery Upgrade Project (Athens, Greece)

2)Phenolics Facilities (Jubail, KSA)

Reason for leaving: Finished Contract

Foster Wheeler Thailand

Position: Snr Piping Designer

1st Floor, Talaythong Tower 53 Moo 9,Sukhumvit Road, Thungsukla, Sriracha, Chonburi 20230, Thailand

Jan 15, 2006 to Jan. 14, 2008

Project Involve:

1)Shell Bukom Refinery Modification Project (Singapore)

2)Crude Distillation Unit 3 Revamp Project (Sriracha, Chonburi Thailand)

Reason for leaving: Finished Contract

Ranhill Worley SDN BHD. KL, Malaysia

Position: Piping Checker

Oct. 04, 2004 to Dec. 07, 2005

Project Involve:

1)F23 Facilities Rejuvenation Project (Sabah, Malaysia)

2)Melut Basin Oil Development Project (Sudan)

Reason for Leaving: Finished Project

Technip Malaysia

Position: PDS Piping Designer (Seconded)

Project Involve: SMPO Nanhai Petrochemical Project (Huizhou, PRC)

March 01, 2004 to Sept 18, 2004

Reason for Leaving: Finished Project

J & S Consultancy Services Co. Inc. Phils.

6/F MGF Champaca Bldg., 156 Amorsolo St. Legaspi Village, Makati City

Position: Piping Designer

June 19, 2003 to Feb. 27, 2004

Project Involve:

1) Dubai Electricity & Water Authority (Dubai)

2) SRT Sakai LNG Receiving (Japan)

Foster Wheeler UK

Tuas Pioneer Sector 3, Singapore

Position: Piping Supervisor/Piping Inspector

Feb. 27 2002 to June 01, 2003

Project Involve: PB3 Expansion Project GlaxoSmithKline (Singapore)

Reason for Leaving: Finished Project

Foster Wheeler Singapore

Position: PDS Piping Designer

Project Involved: R & D Facility Project (Tuas, Singapore)

August 26, 2001 to Feb 26 2002

Reason for Leaving: Finished Contract, transfer to Construction

Fluor Daniel Inc. Phils

Position: PDS Piping Designer

Project Title: Hamaca Upgrader Project (Jose Venezuela)

Feb. 26, 2001 to August 24, 2001

Reason for Leaving: Finished Contract

ABB Soimi SPA

Qarshi, Republic of Uzbekistan

Position: Piping Supervisor

June 15, 2000 to Feb 15, 2001

Project Involve: Ethylene/Polyethylene Project Uzbekneftigas (Shurtan Gas Chemical Complex)

Reason for Leaving: Finished Project

Fluor Daniel Inc. Phils

Position: PDS Piping Designer

Nov. 09, 1998 to June 04, 2000

Project Involve:

1)Refinery Upgrader Project (Saint John N.B. Canada)

2)LHC-2 Ethane Cracker (Bajia Blanca Argentina)

Reason for Leaving: Finished Project

J & S Consultancy Services Co. Inc. Phils.

6/F MGF Champaca Bldg., 156 Amorsolo St. Legaspi Village, Makati City

Position: Piping Designer

Project Involve: Polyethylene and Polypropylene (Buli, Taiwan)

June 05, 1998 to Oct. 05, 1998

Reason for Leaving: Transfer to Fluor

Mitsubishi Heavy Industries Ltd. Phils

Position: Insulation Supervisor

Project Involve: Polyethylene and Polypropylene Facilities J.G. Summit Petrochemical Corp. (Batangas)

Dec. 07, 1997 to April 07, 1998

Reason for Leaving: Finished Project

CMI General Contractor Phils

Position: Piping Supervisor (Fabrication/Erection/Installation)

Client: Caltex Refinery Phils. Inc.

Project Involve: Debottle Necking Project & Shutdown Works (Caltex Refinery, San Pascual Batangas)

Oct. 02, 1994 to Dec. 02, 1997

Reason for Leaving: Transfer to MHI

Mitsubishi Heavy Industries Ltd. Phils

Position: Piping Supervisor (Fabrication/Erection/Installation)

Project Involve: Batangas Coal Fired Thermal Plant (National Power Corporation Calaca, Batangas)

Dec. 09, 1993 to Sept. 09, 1994

Reason for Leaving: Finished Project

CMI General Contractor Phils

Position: Piping Designer

Project Involve: Diesel Shipping Facilities (Caltex Refinery, San Pascual Batangas)

Oct. 26, 1992 to Nov. 07, 1993

Reason for Leaving: Transfer to MHI

Saipem Company Ltd. Iran

Position: Piping Supervisor (Fabrication/Erection/Installation)

Client: Iran Oil Company

Project Title: 7th Arak Refinery (Arak, Iran)

Oct. 19, 1991 to Oct. 19, 1992

Mitsubishi Heavy Industries Ltd KSA

Position: Draftsman /Piping Supervisor (Seconded)

Project Title: 1 x 1000 MW Qurrayah Power Plant (KSA)

May 09, 1989 to June 09, 1991

Michrel Eng’g

Batangas City, Philippines

Piping/Mechanical Draftsman

Feb 1986 to April 1989

CMI General Contractor Phils

Pipefitter/Fabricator

Jan 1984 to Jan 1986

PERSONAL DETAILS:

NAME: DELFIN M. ROSALES

EDUCATION: (Formerly, Western Philippine Colleges) University of

Batangas, Bachelor of Science in Mechanical Engineering

(3rd year, Undergraduate) Oct 1988

(Formerly, Western Philippine Colleges) University of

Batangas, Drafting Technology (Graduate)

June 1983 - Oct 1985

High School, (Formerly, Western Philippine Colleges)

University of Batangas, Batangas City, Philippines

June 1978 - Mar 1983

BIRTH PLACE: N. Lat Subd. Sta. Rita Karsada Batangas City. Phils.

BIRTH DATE: September 05, 1966

CIVIL STATUS: Married

PASSPORT NO.: P1637470B

ADDRESS: N. Lat Subd. Sta Rita Karsada Batangas City, Philippines

EMAIL ADDRESS: adqop4@r.postjobfree.com

Mobile No. (Philippines) +63-945*******

Land line (Philippines) +63-043-*******

TIN No: 177-620-253

SSS: 04-05909544

Phil Health: 09-025028185-3

DELFIN M. ROSALES



Contact this candidate