PERSONAL DATA
N a m e : SUKNO Pridjaja
Address : Jl. Kalimantan 102 GKB
Gresik 61151
Indonesia.
Phone : +62.82135674769
Email : adqo7v@r.postjobfree.com
Place and Date of Birth : Surabaya 27 02 1967
Nationality : Indonesia
Language : Indonesia and English
Passport number : S551692
EDUCATION
Bachelor degree in Marine Engineering of Institut Teknologi Sepuluh Nopember (ITS) Surabaya Indonnesia
Certitications.
7 – 11 February 2022 IRCA ISO 9001- 2015 Lead Auditor.by EAS.
Welding Inspector CSWIP 3.1 - CSWIP 3.1 register no 440784
Ultrasonic technician - ASNT Level II (ASNT) certificate no. 1994406
Radiography Intepreter - ASNT Level II (ASNT) certificate no. 1963715
Pipeline Inspector MIGAS – certificate no 990861
Basic Fire Fighting, Sea Survival, Fir st Aids – certificate no 0201415
QHSE - ISO 450***-**** – certificate no. 2021.05.45001.2116
Training Courses
Pipeline Inspector – by MIGAS Indonesia.
CQI and IRCA ISO 9001- 2015 Lead Auditor by EAS`
Welding Inspector – by the Welding Institute (TWI)
Radiographic Testing - by dB Scholl NDT Batam
•Ultrasonic Testing . by dB Scholl NDT Batam
•Attended Phased Array workshop 40 hours - Set Up and Interpret – by PERTAMINA
•Basic Fire Fighting, Sea Survival, Fir st Aids – by global Safetindo
•QHSE ISO 450***-**** – by ECI bisnis Manajemen
Client Approval
•EN Angola s.p.a, Pertamina Hulu Mahakam (PHM), RWE, Pertagas, DNV Italy, Premier Oil, DNV, Petronas, Mobil Cepu Ltd (Exxon Mobil-Pertamina), TOTAL E.P, Germanischer Lloyds, Lloyd Register, Spie Capac s.a, ABB, Nippon Steel,, Hyundai Heavy Industry Co ltd, Swiber Offshore PTE Ltd, Horizonn Offshore Contractor Inc, Meindo Elang Indah, Jaya Sumpiles Indonesia.
Professional Profile, Skills and Technical Competences
Serve 20 years in oil & gas offshore and onshore pipeline, piping, jacket and top side installation, fabricate pipe mill, pressure vessel, tank, mechanical installation as Construction Engineer, pipemill Inspector and QA / QC.
Scope of work included review and execute work package, material take off (MTO), bill of quantity( BOQ ) rigging plan, welding inspection, painting inspection, rotating and static equipment installation, FAT, NDT inspection, dimensional, updated drawing for construction, scheduling, recovery plan, line check, killing punch list, mechanical completion, set up dossier and maintain all activity compliance to safety.
The welding process involved are SMAW, GTAW, FCAW, GMAW, SAW, ERW, PAW.
The material involve are carbon steel. alloy steel, austenite stainless steel (304,316, 321), duplex stainless steel (2205 2507), inconel alloy 625, inconel alloy 825, corrosion resistance alloy (CRA) cladding. creep resistance steel T24 (7CrMoVTiB10-10)
Code / standard, specification during installation and fabrication are AWS D11, ASME II, ASME B31.3, ASME V, ASME VIII, ASME IX, API 1104, API 5L, API RP 686, API 650, BS EN ISO 50045, BS EN ISO 156764, BS EN ISO 2553, BS EN ISO 17637, BS EN ISO 2560, ISO 10893-5, ISO 10893-8 ISO 10893-11, TOTAL specification, Emshaven / RWE specification, Petronas specification, Shell specification, Chevron specification, Conoco specification, Pertamina specification.
Employment History
Dates
:
June – October 2021
Project name
:
Agogo Early Production phase 2 – Supervise set up WPS and manufacturing Mechanically CRA Line Pipes 10 inch diameter API 5L X65 by Saipem S.A / Cladtek,
Final Client
:
ENI Angola
Place of work
Position
:
:
Cladtek Bi-Metal, Batam Indonesia
Inspection Leader on behalf ENI Angola
Description of the activities, responsibilities, main interfaces:
Set-up new WPS-PQR and continued inspection early production for mechanical line pipe and full overlay line pipe.
•Managed inspection team.
•Liasised Eni management, contractor and subcontractor.
•Welding process : Plasma arc welding, Gas tungsten arc welding autogenous, Gas tungsten arc welding, Laser arc welding.
•NDT involved : Radiography, Manual ultrasonis test, Eddy current, Penetran test, Magnetic particle inspection,
Dates
:
October 2020 – January 2021
Project name
:
10 inch diameter length 6,5 KM Offshore Pipeline from Jampang Metulang-1 (JM1) platform to Sepinggan (SPGP) platform, Gas Supply South Mahakam Kalimantan (SMK) to Refinery Unit-V (RU-V), EPCIC-2.
Final client
:
Pertamina Hulu Mahakam (PHM)
Place of work
:
Tunu Field East Kalimantan
Position
:
QA QC and Construction Supervisor Pertamina Hulu Mahakam ex Total Indonesie
Description of the activities, responsibilities, main interfaces:
Set-up new Welding Procedure Qualification (WPS).
Inspected production weld for pipeline, piping and structure.
Inspected pre commissioning pipeline and piping.
•Managed inspection team.
•Liaised PHM management, contractor and subcontractor.
•Welding process : Gas metal arc welding surface tension transfer, Gas tungsten arc welding, Shield metal arc welding.
•NDT involved : Radiography, Manual ultrasonis test, Penetrant test, Magnetic particle inspection
Dates
:
June – August 2020
Project name
:
PLTGU Jawa-I 7600 MW Power Plant Pertamina Power.
Final client
:
Pertamina
Place of work
:
Cilamaya West Jawa
Position
:
QA QC and Construction Supervisor for Meindo Elang Indah
Description of the activities, responsibilities, main interfaces:
•Supervised production welds for piping and structure to follow specification and gain good progress.
•Conducted pre commissioning piping system.
•Manage welding team and consumables,
•Liaised Meindo management and subcontractor.
•Welding process : Gas metal arc welding surface tension transfer, Gas tungsten arc welding, Shield metal arc welding.
•NDT involved : Radiography, Manual ultrasonis test, Penetrant test, Magnetic particle inspection
Dates
:
February – April 2020
Project name
:
Free Span Correction Offshore East Java Gas Pipeline (EJGP) Ø 28 inch Pagerungan to Porong
Final client
:
PT. Pertamina Gas / PERTAGAS
Place of work
:
Pagerungan - Porong Jawa
Position
:
QA QC and construction Supervisor for Pertagas
Description of the activities, responsibilities, main interfaces:
•Manage to contractor to make sure all procedures and drawing status for construction.
•Reviewed Inspection and Test Plan complied to the specification and approved for construction.
•Verified all equipment ROV, equipment survey are tested and calibrated.
•Make sure every point proposed contractor position support / sand bag of pipeline to actual position by survey and ROV is complied construction drawing
•Verified sand bag type are complied to drawing for construction and specification.
•Make sure gap pipeline to sea bed are enough for arrangement to set up support / sand bag and type sand complied to specification,
•Verified cement grouting mixing is complied to specification.
•Verified hammer test to sample cement grouting mixing before discharge to cement bag in sea bed.
•Manage to contractor to prepare and client’s verified test of strength of sample grouting for seven days, fourteen days, twenty one days and twenty eight days.
•Liaised contractor’s engineer, ROV team and survey
Dates
:
November 2019 – January 2020
Project name
:
Pipe Mill diameter 6 inch and 8 inch API 5L X65 PERTAMINA HULU MAHAKAM ex TOTAL INDONESIE (PHM) at PT Indal Steel Pipe
Final client
:
PERTAMINA HULU MAHAKAM (PHM)
Place of work
:
Indal Steel Pipe Manyar Gresik East Jawa
Position
:
Pipemill Inspector
Description of the activities, responsibilities, main interfaces:
•Witnessed production weld and mechanical test
•Liaised PHM management and pipemill manufactured
•Welding process : Electric resistance welding, Shield metal arc welding.
•NDT involved : Phaseray, Ultrasonic offline, Manual ultrasonis test, Penetrant test, Magnetic particle inspection
Dates
:
January 2017 – February 2017
Project name
:
Pipe Mill 10 inch diameter Bison, Iguana And Gajah Putri Development Project
Final client
:
Premier Oil
Place of work
:
Indal Steel Pipe Manyar Gresik East Jawa
Position
:
Pipemill Inspector for GL-DNV
Description of the activities, responsibilities, main interfaces
•Witnessed production weld and mechanical test
•Liaised Premier Oil management and pipemill manufactured
•Welding process : Electric resistance welding, Shield metal arc welding.
•NDT involved : Radiography, Ultrasonic offline, Manual ultrasonis test, Penetrant test, Magnetic particle inspection
Dates
:
September 2012 – Nov 2015
Project name
:
EPC-1 Greenfield Banyu Urip Project at Bojonegoro, East Jawa.
Final client
:
Exxon Mobil – Pertamina ( Mobil Cepu ltd)
Place of work
:
Kalitidu Bojonegoro
Position
:
QA QC and Construction supervisor for Mobil Cepu Ltd
Description of the activities, responsibilities, main interfaces.
•Set up Welding Procedure Qualification.
Inspected fabrication on site of tank, vessel, piping spools and structures.
Inspected mechanical installation, static equipment, HVAC and rotating equipment.
Inspected pre commissioning of piping system.
•Liaised Exxon Mobil management and contractor
•Welding process :, Shield metal arc welding., Gas tungsten arc welding
NDT involved : Radiography, Manual ultrasonis test, Penetrant test, Magnetic particle inspection
Dates
:
August 2010 - June 2012
Project name
:
Manufacture water tube boiler welding process by SAW and GTAW Steam Power Generation
Final client
:
RWE / Rheinisch Westfälische Elektrizitätswerke
Place of work
:
PT ALSTOM POWER ENERGY SYSTEM INDONESIA in Surabaya
Position
:
QA QC and Construction supervisor for RWE
Description of the activities, responsibilities, main interfaces.
•Inspected and supervised progress weld fin-tube of boiler and vessel.
•Liaised RWE representative management and boiler manufactured
•Welding process :, Submerged metal arc welding, Gas tungsten arc welding
NDT involved : Radiography, Manual ultrasonis test, Penetrant test, Magnetic particle inspection
Dates
:
March – May 2010
Project name
:
Pipeline, Piping and Jacket Installation in Bongkot Field Development Project – Phase 3H & 4A
Final client
:
PTTEP
Place of work
:
PTTEP Thailand
Position
:
QA QC Inspector for Nippon steel
Description of the activities, responsibilities, main interfaces
Inspection of welding activity welding process SMAW and GTAW.
Reviewed drawing, prepared material and fit up
Requested RT, UT manual, MPI and PT.
Pre commissioning piping and pipeline system.
Prepared and reviewed all certificates for QC tools
Prepared daily inspection documents for dossier
Dates
:
May 2007 – December 2009
Project name
:
On board MCdermott lay barge for 20” CRA Pipelines from Platform F13EDR – A to Platform F13WDR– A, 28” CRA Pipelines from Platform F13WDRA TO Platform E11P-B, 10” CRA Pipelines from Platform M3DRA to Platform M3S, 10” CRA Pipeline from Platform M3DR-A to sub sea wellhead G7, 14” CRA Pipeline from Platform M1DR-A to sub sea wellhead G7
Final client
:
Shell Sarawak Sdn Bhd Malaysia
Place of work
:
Sarawak Malaysia
Position
:
Certifying Authority for Lloyd Register
Description of the activities, responsibilities, main interface
Inspected production weld for piping spools and pipelines..
Inspected pre commissioning of piping system.
•Liaised Shell sdn bhd management and contractor
•Welding process : Gas metal arc welding., Gas tungsten arc welding, Shielded metal arc welding.
NDT involved : Radiography, Auto- ultrasonis test, Manual ultrasonis test, Penetrant test, Magnetic particle inspection.
Dates
:
July - December 2006
Project name
:
Offshore pipeline, piping and jacket installation ABU CLUSTER “A” – ABU CLUSTER field development project of
Final client
:
PETRONAS CARIGALI in Malaysia.
Place of work
:
Offshore in Malaysia
Position
:
Senior inspector Swiber offshore PTE ltd Singapore
Description of the activities, responsibilities, main interface
Inspection of welding activity welding process SMAW.
Reviewed drawing, prepared material and fit up
Requested RT, UT manual, MPI and PT.
Pre commissioning piping and pipeline system
Prepared and reviewed all certificates for QC tools
Prepared daily inspection documents for dossier
Liaised with engineer contractor.
Prepared and maintained welding & material trace ability system
Dates
:
December 2005 – June 2006
Project name
:
On board the DLB Sea Horizon under contract with the West Africa Gas Pipeline WAGP-CHEVRON for Pipe-lay Installation of sub sea offshore 20” – 560 Km Sub-Sea Gas Pipeline and piping installation Project.
Final client
:
Chevron
Place of work
:
The offshore pipeline passed some countries Nigeria-Benin-Togo-Ghana.
Position
:
Senior inspector and QC Horizon Offshore
Description of the activities, responsibilities, main interface
Inspection of welding activity welding process GMAW, SMAW and GTAW.
Reviewed drawing, prepared material and fit up
Requested RT, UT manual, Auto UT, MPI and PT.
Prepared and reviewed all certificates for QC tools
Prepared daily inspection documents for dossier
Attended daily meeting.
Liaised with engineer contractor.
Prepared and maintained welding & material trace ability system
Dates
:
June 2005 – December 2005
Project name
:
Onshore for PERTAMINA Development Project Pipeline 32”, 28”, 6”, 4” from West Musi to West Prabumulih
Final client
:
Pertamina
Place of work
:
West Musi to Prabumulih, South Sumatera
Position
:
Certifiying authority for MIGAS
Description of the activities, responsibilities, main interface
Monitored and verified of material & consumables handling,
Inspected welding structural, pipeline and piping performance SMAW, GTAW.
Inspected and verified field joint coating and other installation performance.
Reviewed and verified of NDT (RT, Manual UT, MT, PT) test performance.
Reviewed daily reporting of contractor dossier.
Prepared and maintained welding & material trace ability system.
Reviewed and verified QC tool certificate for QC tool welding. coating tool and precommissioning tool`
Witnessed hydro test activity.
Liaised with owner inspector / engineer Pertamina and Contractor
Dates
:
April - May 2005
Project name
:
On board Sea Horizon lay barge fo installation offshore pipeline 32”, 8” and 14” Pipeline and piping Phase 2 Block B Sub Sea Development Project
Final client
:
Conoco Phillip
Place of work
:
Offshore Natuna island
Position
:
Welding Inspector for Horizon Offshore
Description of the activities, responsibilities, main interface
Inspection of welding activity welding process SMAW and GTAW.
Reviewed drawing, prepared material and fit up
Requested RT, Auto UT, UT manual, MPI and PT.
Pre commissioning piping and pipe line system.
Prepared and reviewed all certificates for QC tools
Prepared daily inspection documents for dossier
Dates
:
March – April 2005
Project name
:
Development Division Project for Tunu phase 9 EPSC 1
Final client
:
Total Insdonesie
Place of work
:
Offshore Tunu Kalimantan island
Position
:
QC Supervisor for Total Indonesie
Description of the activities, responsibilities, main interface
Monitored and verified of material & consumables handling,
Inspected welding structural, pipeline and piping performance SMAW, GTAW.
Inspected and verified painting activity.
Reviewed and verified of NDT (RT, Manual UT, MT, PT) test performance.
Reviewed daily reporting of contraoctor dossier.
Prepared and maintained welding & material trace ability system.
Reviewed and verified QC tool certificate for QC tool welding. coating tool and precommissioning tool`
Witnessed hydro test activity.
Liaised with owner inspector / engineer Contractor.
Dates
:
October 2003– February 2004
Project name
:
Offshore pipeline from platform to platform as follows : TN-15 to N13, TN L-14 to GTS-L, TN L-15 to GTS-L, TN Q-7 to GTS-Q and TN-8 to GTS-Q
Final client
:
Total Insdonesie
Place of work
:
Offshore Tunu Kalimantan island
Position
:
Certifiying authority for GL-Indonesia
Description of the activities, responsibilities, main interface
Monitored and verified of material & consumables handling,
Inspected welding structural, pipeline and piping performance SMAW, GTAW.
Inspected and verified field joint coating and other installation performance.
Reviewed and verified of NDT (RT, Manual UT, MT, PT) test performance.
Reviewed daily reporting of contractor dossier.
Prepared and maintained welding & material trace ability system.
Reviewed and verified QC tool certificate for QC tool welding. coating tool and precommissioning tool`
Witnessed hydro test activity.
Liaised with owner inspector / engineer Total Indonesie and Contractor
Dates
:
November 2002– September 200
Project name
:
Onshore and offshore 28 inch Pipeline 450 km from Grissik in Sumatera Indonesia to Sakra Singapore Project
Final client
:
Perusahaan Gas Negara / PGN
Place of work
:
Onshore and offshore Indonesia to Singapore
Position
:
Certifiying authority for GL-Indonesia
Description of the activities, responsibilities, main interface
Monitored and verified of material & consumables handling,
Inspected welding structural, pipeline and piping performance SMAW, GTAW. FCAW, GMAW
Inspected and verified field joint coating and other installation performance.
Reviewed and verified of NDT (RT, Manual UT, MT, PT) test performance.
Reviewed daily reporting of contractor dossier.
Prepared and maintained welding & material trace ability system.
Reviewed and verified QC tool certificate for QC tool welding. coating tool and precommissioning tool`
Witnessed hydro test activity.
Liaised with owner inspector / engineer PGN and Contractor (Boskalis Idros, Nacap, Global Asia Pacific, Punj Llloyds, Hyundai Heavy Industry)
Dates
:
September – November 2002
Project name
:
Steel Making I for API 5L X65 manufactured by PT. Krakatau Steel for Onshore and offshore 28” Pipeline 450 km from Grissik in Sumatera Indonesia to Sakra Singapore Project.
Final client
:
Perusahaan Gas Negara / PGN
Place of work
:
Onshore and offshore Indonesia to Singapore
Position
:
Steel Making Inspector for GL-Indonesia
Description of the activities, responsibilities, main interface
Verified and witnessed during steel making followed approved ITP
Witnessed bending test, impact test, tensile test, to verify dimensional, casting process, hot rolling process, to review chemical composition
Dates
:
July – September 2002
Project name
:
Pipemill for API 5L X65 manufactured by PT. Krakatau Steel for Onshore and offshore 28” Pipeline 450 km from Grissik in Sumatera Indonesia to Sakra Singapore Project.
Final client
:
Perusahaan Gas Negara / PGN
Place of work
:
Onshore and offshore Indonesia to Singapore
Position
:
Pipemill Supervisor GL-Indonesia
Description of the activities, responsibilities, main interface
•Review Inspection and Test Plan.
•Review certificate coils for chemical composition and mechanical properties.
•Coils receiving inspection from mechanical damage and dimensional thickness & width of coils.
•Supervised welding inspection process, check parameter ampere, voltage, travel speed, heat input, heat treatment.
•Supervised hydro test of pipe inspection for pressurizing, holding pressure, depressurizing.
•Supervised and reviewed radiography, UT off line for lamination check.
•Supervised and witnessed dimensional straightness, ovality, thickness, sizing of bevel, squareness. Individual length and diameter pipe.
•Supervised mechanical test inspection for flattening, guide bend, tensile, charpy, hardness, macro and chemical analysis.
•Maintaned welding and material traceability
•Monitored schedule and communicated the progress to team
Dates
:
April 2000 – June 2002
Project name
:
Manufactured building material
Final client
:
PT Eternit Gresik of Belgian Etex group
Place of work
:
Gresik East Jawa
Position
:
Labolatory Manager
Description of the activities, responsibilities, main interface
Wrote procedure for test and inspection plan of raw material, process and finish product test, to look for correlation between raw material, process inspection and finish product test, to manage data collection of inspection, to manage laboratory personnel. to manage equipment in laboratory include their calibration.
Dates
:
June 1998 – August 1999
Project name
:
Onshore 42” Gas Export Pipeline Peciko EPSC 4 and offshore Pipeline Trunk Line Tunu EPSC 2 in Kalimantan.
Final client
:
Total Indonesie
Place of work
:
East Kalimantan
Position
:
QC Inspector for Spie Capac / Citra Idonesia
Description of the activities, responsibilities, main interface
Inspection of welding activity welding process SMAW and GTAW.
Reviewed drawing, prepared material and fit up
Requested RT, UT manual, MPI and PT.
Prepared and reviewed all certificates for QC tools
Prepared daily inspection documents for dossier
Dates
:
October 1997 – July 1998
Project name
:
3rd LNG Loading Dock for Train-H Project at PT. Badak NGL, Bontang.
Final client
:
Pertamina
Place of work
:
East Kalimantan
Position
:
QC Engineer for Jaya Sumpiles Indonesia
Description of the activities, responsibilities, main interface
Monitored and verified of material & consumables handling,
Monitor and manage welding structural, pipeline and piping performance SMAW, GTA
Reviewed and arranged of NDT (RT, Manual UT, MT, PT) test performance.
Set up and monitor daily reporting of for dossier.
Prepared and maintained welding & material trace ability system.
Reviewed and verified QC tool certificate for QC tool welding. coating tool and precommissioning tool`
Monitor and improve welding quality
Liaised with owner inspector / engineer Contractor.
Dates
:
April 1994 – June 1997
Project name
:
ABB Services
Final client
:
Asea Brown Boveri (ABB)
Place of work
:
Surabaya Indonesia
Position
:
Workshop Leader for rotating equipment
Description of the activities, responsibilities, main interface
follow up job order, scheduling, arranging man power, spare break down and spare part order, for repair, recondition, retrofitting of ABB turbocharger, to control minimum stock of spare part, to take participation of ISO 9002 accreditation.
.