Name: Arun Karole
Mobile: +91-985*******
Mail ID: adqnv1@r.postjobfree.com adqnv1@r.postjobfree.com
Permanent address: Shri Martand Chhaya Apartment, Flat 202,
Shivajinagar, Nagpur 440010, India
Professional Experience Summary
Objective:
Seeking an engineering position in Oil and Gas industry/Power Industry
Professional Experience: Total Experience of 35 years
Education
Bachelor of Engineering (Hons.) Electrical, Year : 1979
Visvesvaraya National Institute of Technology (VNIT) Nagpur, India
Languages
English, French, Hindi and Marathi
PROFESSIONAL MEMBERSHIP
Senior Member IEEE (USA) and MIE (India)
COMPUTER SKILLS:
ETAP, Office Tools: MS Excel, MS Power Point, MS Word
Resident Electrical Engineer PMC – March 2018 to July 2019
GOPA-INTEC (International Energy Consultants) Abu Dhabi, UAE
Worked as Resident Electrical Engineer on TRANSCO’s Saadiyat 400 KV Grid station for modification of existing 400 KV Overhead line GIS Bays to 400 KV Cable & reactor bays including control/protection, SCMS & LDC work.
Principal Electrical Engineer PMC (January 2015 to December 2018
TECHNIP Abu Dhabi, UAE
Project Title: NASR Full Field Development Project, DAS Island Package 3
Project Description: Brown field work for modification work of Umm Shaif Process plant production facilities at DAS ISLAND to process additional oil production from NASR Field
Responsibilites : Worked as Principal Electrical Engineer for design & detailed Engineering
• Power system study, short circuit study & calculations, load flow study, harmonic study, motor running calculations, Earthing system design on ETAP software
• Design of single line diagram for 11 KV, 3.3 KV and 415 V substation system including 11/3.3 KV and 3.3/0.415 KV
transformers, bus ducts, cables.
• 11/3.3/0.415 KV substation sizing for all electrical equipment layout
• ECMS (Electrical Control & Protections system) design including I/O signals
• 11/3.3/0.415 KV power cable sizing calculations
• Earthing system calculations
• 240 V AC UPS, 110 V DC UPS and batteries sizing calculations
• 3.3 KV and 415 V motor selections for boiler feed water pumps, forced draft fan motors, sour crude charge pump motor, Stripped crude product pump motors
• 415 V Boiler auxiliary motors
Principal Electrical Engineer PMC (Aug 2011 – December 2014)
CH2M HILL Energy Canada Ltd Abu Dhabi, UAE
Project Title: Tie in of 12 Nos. Sour Gas wells to Shah Gas gathering system
Shah Gas and Sulfur plant Development Project
Project
Description:
1.Shah Sour Gas wells gathering stations
2. Shah Sour gas processing plant sulphur station and sulphur pipe lines project
Responsibilities: Worked as PMC Principal Electrical Engineer for design and detailed engineering of following projects of Abu Dhabi Gas Development Company (AL HOSN GAS Company):
Power system study, short circuit study & calculations, load flow study, harmonic study, motor running calculations, Earthing system design on ETAP software
Design of single line diagram for 33 KV, 11 KV, 3.3 KV and 415 V substation system including 33/11 KV, 11/3.3 KV and 11/0.415 KV transformers, bus
ducts, cables.
33/11/3.3/0.415 KV substation sizing for all electrical equipment layout
IPCS (Integrated Protections and Control system) design including I/O
signals
33/11/3.3/0.415 KV power cable sizing calculations
Earthing system calculations
240 V AC UPS, 110 V DC UPS and batteries sizing calculations
3.3 KV and 415 V motor selections for sulphur pumps, water pumps, boiler pumps, fire water pumps, motor for sulphur plant granulations, stacker re-
claimer, rail car loading system process.
VFDs (Variable speed drive) for pump motors
DCS (distributed control system) for sulphur plant and Gas station. Package vendor designs and drawings review and approval.
1000 KVA and 750 KVA diesel generators
33 KV double circuit lattice steel tower over head transmission line designs and drawings review/approval
Senior Project Design Electrical Engineer (Oct 2010 – Aug 2011)
National Petroleum Construction Company Abu Dhabi
Project Title: 1.8 MMBOPD BAB THAMAMA ADCO Project
Project
Description:
1.8 MMBOPD Habshan Tammama Phase: 2 Full Oil field Development (FFD)
Responsibilities: Power system study, short circuit study & calculations, load flow study, harmonic study, motor running calculations, Earthing system design on ETAP software.
Designing and drawings review/approval of 33 KV double circuit and single circuit lattice steel tower structure overhead lines for EPC contract awarded
to L & T India by NPCC.
33 KV GIS extension and related controls, SCMS, protections and tariff metering engineering work.
Supply to power skids for remote degassing stations (RDS) and water
injection clusters (WICs) through 33/0.415 KV transformers, 415 Volts switchgear and its controls, DCS and protections for incomings, all outgoing pump/motor feeders and low voltage power distribution system, 110 V DC batteries and chargers, 240 V UPS/convertors.
Supply for 11KV compressors, pump motors through 33/11 KV transformers. Supply to 3.3 KV motors through 33/3.3 KV transformers.
Senior Design Electrical Engineer (Sep 2002 – Oct 2010) Company : Lahmeyer International Abu Dhabi, UAE
Client: Abu Dhabi Company for Onshore Oil Operations (ADCO) and TRANSCO
(July 2006 to August 2008)
Project Title: Bulk Power supply transmission and integration with existing power distribution system in ADCO ASAB Oil field area
Project
Description:
Bulk power supply transmission and distribution in ADCO oil field area.
Responsibilities: Designs, drawings review/approval, supervision of construction and pre- commissioning and commissioning of 220/132/33 kV power distribution system for ASAB onshore oil field power integration project of Abu Dhabi Company for Onshore Oil Operations (ADCO).
Site location: ASAB Oil field area
Client: TRANSCO (Transmission and distribution Company) Abu Dhabi, UAE and
FEWA (Federal Electricity and Water Authority) Dubai, UAE.
Project Title: Design, drawings review/approval,supervision of construction and commissioning of following EPC projects.
Project
Description:
132/33/11 KV substations of FEWA (Federal Electricity and water authority) UAE.
400/132 KV Bahiya grid station and modifications of existing 132 KV
substation project of TRANSCO Abu Dhabi, UAE.
400/132/22 KV Al Reem Island grid station project of TRANSCO Abu Dhabi, UAE.
132/22 KV substations (3 Nos.) Al Reem Island project of TRANSCO Abu
Dhabi, UAE.
132/11 kV, W16 substation project of ADWEA (Abu Dhabi Water and
Electricity), responsible for designing, supervision of installations, testing and commissioning of complete substation.
Static VAR compensation system at 220 kV Alain South West substation,
Responsibilities: Responsible for designing and drawings, coordination with client (ADWEA) and contractor, supervision of installation, pre-commissioning, commissioning and energization of system.
Senior Resident Electrical Engineer (Dec 2000 – Aug 2002) Mott MacDonald Ltd. Abu Dhabi, UAE
Client: Abu Dhabi Water and Electricity Company.
Project Title: 5x12.5 MIGPD Unit 11 to 15 MSF Desalination & Boiler Plant project, Umm
Al Nar (West) Station 'B'.
Project
Description:
Desalination plant for 5x12.5 MIGPD MSF Desalination & Boiler Plant, Umm
Al Nar'.
Responsibilities: Designing and drawings, coordination with Client (ADWEA) and Contractors for supervision of installation, pre-commissioning, commissioning & energization of 220/11 KV, 11 KV/415 V substations,110 V DC and 24 V DC system 240 V AC UPS system,11 KV 2-7 MW pump motors an d complete electrical system for 5x12.5 MIGPD Unit 11 to 15 MSF Desalination & Boiler Plant, Umm Al Nar (West) Station 'B'.
Site location: Umm Al Nar, Abu Dhabi, UAE
Resident Electrical Engineer (Nov 1999 – Dec 2000) Company : Mott MacDonald Ltd. Abu Dhabi, UAE
Client: Abu Dhabi Water and Electricity Company.
Project Title: 2x3.5 MIGPD desalination plant Umm Al Nar (West) power station.
Project
Description:
2x3.5 MIGPD Unit No. 9 and 10 desalination plant Umm Al Nar power station.
Responsibilities: Designing and drawings, coordination with client (ADWEA) and contractor, supervision of erection, testing and commissioning of complete electrical system for 2x3.5 MIGPD Unit No. 9 and 10 desalination plant Umm Al Nar (West) power station.
Site Location: Umm Al Nar, Abu Dhabi, UAE
Resident Electrical Engineer (August 1993-October 1999) Company : Ewbank Preece Consultant Ltd. Abu Dhabi UAE
Client: Water and Electricity Department
Project Title: 33/11 KV power distribution and transmission system
Project
Description:
1. 33/11 KV new substations, extension and modifications in existing
33/11 KV substations and 33 KV,11 KV cabling project
2. 4x60 MW power and water desalination MIRFA power plant project
Responsibilities: Designing, co-ordination with Client (WED) and contractor, Supervision of erection, testing and commissioning of following substations for Water and Electricity Department (WED) in Al Ain.
New 33/11kV primary substations – 6 Nos.
Modifications in existing 33/11kV Primary Sub-stations – 9 Nos. Modifications in existing 220/33kV Grid Stations – 4 Nos.
For 4 x 60MW Mirfa Power Station.
Commissioning Engineer for WED's 220/33/11kV Madinat Zayed and Liwa
Substation.
220kV double circuit overhead line from Madinat Zayed to Liwa and Madinat
Zayed to Mirfa.
33kV single circuit tower overhead line and cabling from Madinat Zayed power house to Liwa power house.
33/11kV Jebel Dhanna/Mugharaq Substations.
Electrical Engineer : June 1992-August 1993
Company : Kennedy & Donkin (ME) Ltd. DUBAI, UAE
Client: Dubai Electricity and Water Authority
Project Title: 400/132 KV grid stations and transmission project
Project
Description:
400 KV and 132 KV transmission and 400/132 KV power distribution substations
Responsibilities: Project coordination and site supervision with client and contractor for erection, testing and commissioning of Dubai Electricity Company’s 400/132 kV GIS substations at Jabel Ali and Mushreef.
Project Engineer (Electrical) (Jun 1990 – Mar 1992) Company : Thermo Electric Services Dubai, UAE
Client: Dubai Electricity and Water Authority
Project Title: 33/11/0.415 KV substations and power distributions network in Dubai area
Project
Description:
33/11/0.415 KV substations and power distributions projects
Responsibilities: Estimation and execution of medium/low voltage electrical projects.
Project Electrical Engineer (Feb 1989-March 1990)
Company : Al Hassan Trading & Contracting Company, Sultanate of Oman
Client: Water and Electricity Department
Project Title: 220/33 KV substation and power distribution network
Project
Description:
220/33 KV new substation and extension/modifications in existing 220 KV
and 33 KV substations
Responsibilities: Erection, testing and commissioning of 220 KV/33KV substations, 100 MVA
and 80 MVA 220 KV/33KV transformers, 220 KV and 33 KV SF.6
Switchgears, control, Relay panels,110 V DC system SCADA, LDC (load despatch centre integration) 33 KV, 415 V cabling and Earthing work as
subcontractor to TOSHIBA CORPORATION for Al Ain Power Station (WED Abu Dhabi) in UAE.
Site Location: Al Ain, UAE
Senior Project Engineer (Dec 1986 – Jan 1989) Company : GENELEC Ltd. Bombay, India
Client: National Thermal Power Company
Project Title: 400 KV grid and switching station for bulk power network
Project
Description:
400 KV grid and switching station for bulk power distribution system
Responsibilities: Erection, testing and commissioning of 400kV Switching Station total 16 no. bays, Earthing, Cabling and LT/HT Switchgears for National Thermal Power Corporation Ltd.
Senior Project Electrical Engineer (Oct 1985-Nov 1986) Company : Bharat Heavy Electricals Ltd, India
Client: Maharashtra State Electricity Comapy.
Project Title: 2x210 MW thermal power station.
Project
Description:
2x210 MW turnkey thermal power plant project
Responsibilities: Worked on 2 210 MW Khaparkheda, Nagpur thermal power station as project Engineer for electrical work.
Project Engineer (Feb 1980 – Sep 1985) Crompton Greaves Bombay, India
Client: Steel Authority of India
Project Title: Extension of power distribution system in steel plant
Project
Description:
132/11 KV substations for power distribution network
Responsibilities: Coordination and execution of 132 KV Switch Yard, 16 MVA, 132 KV/11kV Transformers, LT/HT Switchgears, Cable laying, Earthing and Lighting work for Malanjkhand Copper Project, M.P.
Coordination, erection, testing and commissioning of 132 KV main Switch Yard for 3 x 60 MW Captive Power Plant of BOKARO STEEL PLANT. Including 80 MVA, 16 MVA and 10 MVA, 132 KV/11KV Transformers and Switchgears.