Post Job Free

Resume

Sign in

Land Surveyor Model Maker

Location:
Harare, Zimbabwe
Posted:
April 03, 2022

Contact this candidate

Resume:

PATRICK MUSEVA

Location: Harare Zimbabwe

Mobile: +263-***-******

email: adqn9e@r.postjobfree.com

Personal Details

Date Of Birth: 02/09/1982

Nationality: Zimbabwean

Passport No: DN532876

Driving license: Class B (light vehicle)

Marital status: Married

Professional Profile

Patrick Museva is a Geomatic Surveyor with thirteen (13) years of experience in Cadastral and Engineering projects. He has gained extensive experience in working with Registered Land Surveyors, Consulting Engineers and Construction companies being responsible for conducting surveys in major infrastructural projects such as roads, bridges, buildings, water treatment plants and pipelines.

He has been well exposed to a number of aspects of survey works including, ground control work, GPS, terrestrial traversing, spirit levelling, staking, detail mapping and volumetric calculations. He is a Registered Geomatic Engineer in Zambia.

He is well conversant with Survey and Engineering softwares such as Model Maker, Road Maker, AutoCad 3D Civil and Surpac

Competency Areas

oTopographical Surveying

Establishment of control, Detail surveys, Preparation of DTMs, Preparation of Contour plans

oRoad Designs & Setting out

Preparation of base DTM to be used for design, Generation of Horizontal alignments, Vertical alignments, Creation of cross sections, long sections, Setting out works, Road profiling, Control establishment.

oEarthworks

Calculation of cut and fill volumes, Calculation of layer work volumes, controlling grading and excavations.

oConcrete works

Setting out of footing, checking of pre-pour, setting out of hold down bolts, preparation of as-built reports.

oCadastral/Title Surveys

Sub-divisions, Consolidations, Beacon relocations, Strata/Sectional Title survey, preparation of survey records

Key Skills

Survey Software

Equipment Experience

oAutoCAD 3D CIVIL

oAutoCAD

oModel Maker

oRoad Maker

oGPS Systems (RTK, Static, Fast Static)

Leica Series 500, 900, 1200, Geomax GTS800, South S86,Trimple

oSurpac Surveying Software

oAutoCAD 2016

oMicrosoft Excel

oTotal Stations _ Nikon Nivo 3M, LeicaTS06, Leica TS09 Topcon, DTM122A

oLevel machines

Digital electronic levels (Leica sprinter 100, Geomax

Dumpy levels

Career Summary

July 2020-December 2021

Engineering Surveyor: Zulu Burrow Limited- Consulting Engineers-Zambia

Projects:

1.Upgrading to Bituminous standard of The Petauke to Chilongozi Road in The Eastern Province of Zambia-Lot 1: (Petauke to Chilongozi-118km)

Client: Government of Zambia-Road Development Agent

Contract Duration:15 months

Responsibilities:

To carry out all ground surveys (establishment of control points and topographic surveys), Do Geometric designs, Furnish The Contractor with The Design, To supervise all survey works carried out by The Contractor, To check pay quantities claimed by The Contractor, To attend Client’s monthly progress meetings and To report progress made by The Contractor to the Resident Engineer.

June 2016 to May 2020

Engineering Surveyor: Kiran & Musonda Associates Consulting Engineers-Zambia

Projects:

1.Upgrading to Bituminous Standards Of the Isoka-Muyombe-Chama-Lundazi road to in The Eastern Province of Zambia-Lot 4: Chama (Muyombe road Junction)-Lundazi-84km.

Client: Government of Zambia-Road Development Agent

Contract Duration:2 years

Responsibilities:

Control establishment to millimetre accuracy (field traversing and spirit levelling), detail surveys, creation of survey maps and DTMs, liaising with Engineers, supervising surveys done by contractor, measuring cross sections, preparation of survey reports, taking as-built measurements, calculating quantities.

2.The Construction of Matumbo bridge and Kambemba bridge across Luangwa and Kambemba rivers in Chama District of Muchinga Province

Client: Government of Zambia-Road Development Agent

Contract Duration:1.5 years

Responsibilities:

Control establishment, detail surveys along the river profile and road approaches, checking of setting outs done by contractor, checking of concrete blinding and pre-pours, verification of quantities, taking as-built measurements.

February 2016-May 2016

Senior Surveyor: Sable Transport and Engineering Construction Limited

Projects

3.Upgrading of Isoka-Muyombe-Chama-Lundazi Road to Bituminous Standards in Eastern Province of Zambia-Lot 5: Junction D145 and Lusuntha to 40km along Chama Lundazi road and From Lusuntha –Lundazi Chama Road Junction to Lusuntha Boarder Post (16Km) totalling-56km

Client: Government of Zambia-Road Development Agent

Contract duration: 1.5 years

Responsibilities:

Establishment of benchmarks, Detail survey along the corridor, Preparation of Digital Terrain Models and base maps, Measurement of cross sections, setting out of road profile and road structures, road markings, controlling grading and excavations, Verification of earth quantities, As-built measurements, Survey reports, Attending monthly progress meetings.

February 2014-November 2015

Senior Engineering Surveyor: Bicon Zambia Limited Engineering Consultants

Projects:

1.Upgrading to Bituminous Standards and Re-alignment of approximately 91km of The Luangwa bridge to Luangwa Feira (D145) Road in the Lusaka Province

Client: Government of Zambia-Road Development Agent

Contract duration: 1.5 years

Responsibilities:

Control points establishment, Detail surveys, Earth works quantity verification, As-built measurements, checking of all setting out done by contractor-road profile, road structures, carbs, road markings, Attending monthly site meetings.

2.Upgrading to Bituminous Standards of The Luwingu to Kaputa Road -Lot3 ( Nkhoshya-Kaputa Road (101km)

in The Northern Province Of Zambia

Client: Road Development Agent

Contract Duration: 6months

Responsibilities:

Establishment of control points to millimetre accuracy, Detail surveys, Preparation of DTMs, Preparation of survey base maps, Benchmark levelling

November 2010-January 2014

Senor Land Surveyor: Baker and Partners Land,Engineering and Sectional Title Practitioners.

Projects:

1.North South Carrier Phase2 –approximately 350km stretch

Client: Republic of Botswana (Ministry of Minerals, Energy and Water Resources)

Contract Duration: 2 years

Responsibilities:

Control establishment, detail survey of the corridor, Preparation of survey base maps, Beaconing of the corridor, Beaconing of the borrow areas, Preparation of diagrams, Downloading and uploading survey data, Organising survey teams, Reporting progress to the Survey Manager, Lodgement of the survey record with the Survey and Mapping Department.

2.Rasesa Railway Spur-30km long

Client: Republic of Botswana (Ministry of Transport and Communication)

Contract Duration: 2 months

Responsibilities:

Establishment of control using static GPS method, Organising and supervising survey teams, carrying out detail of a 30m corridor reserve, Downloading and uploading survey data, survey of a 30m corridor reserve, Preparation of DTMs and base maps, Reporting progress to the Survey Manager.

3.Kanye Bus terminus

Client: Republic Of Botswana (Kanye District Council)

Contract Duration: 2 months

Responsibilities:

In this project we were tasked to provide control for use during implementation stage. We also did the actual setting out of the platform including profiling.

In this project we were tasked to provide control for use during implementation stage. We also did the actual setting out of the platform including profiling.

October 2009-September 2010

Senior Site Surveyor: Consco Construction (Pty), Ltd, Gaborone Botswana

Projects:

Construction of Water Treatment Plant and Associated Works At Dikgonnye Village in Kgathleng District of Botswana

Client: Kgatheng District Council

Contract Duration: 8 months

Responsibilities:

Establishment of benchmarks, Uploading and downloading of survey data, setting out of the proposed pipe line alignment, setting out of structures-effluent pond, staff houses, plant house, controlling grading and excavations, calculating quantities, attending site meetings, Liaising with the external Engineers.

November 2008-September2009

Senior Surveyor: China Civil Engineering Construction Co-operation

Projects:

1.Thamaga Infrastructure Development Phase 1 –(23km of bituminous township roads, storm water drainages and a Foot bridge)

Client: Kweneng District Council-

Contract Duration: 3 years

Responsibilities:

Establishment of benchmarks-total station field traversing and spirit levelling, setting out of road alignments, drainage structures, road markings, foot bridge abutments and pier, controlling grading and excavations, Monitoring pavement layers, Measuring cross sections prior to permanent works, Quantity calculations-cut/fil, over-burden, pavement layers, Supervising survey teams.

Education

Degree

Bachelor of Science Surveying & Geomatics Honours Degree, Midlands State University– Zimbabwe, 2003-2008

A-Levels

A-Levels, Pamushana High School, 2000

O-Levels

O-Levels, Pamushana High School, 2002

References

Mr. Davies. Chansa (Managing Director)

Bicon Zambia Limited

P.O.BOX 39528, Rhodespark,

Lusaka, Zambia

TEL: +260-***-******

Mr D.R. Baker (Registered Land Surveyor)

Director

Baker And Partner

P.O. Box 40170

Gaborone, Botswana

Cell +277-**-***-***

Mr.H. Li

Site Agent

China Civil Construction Company

P Bag 263

Thlokweng

Gaborone, Botswana

Cell +267-**-***-***

Chief Land Surveyor

S.Z.Zhou Land Surveyors

P.O.Box 6265

Harare, Zimbabwe

Tel +263-*-******,



Contact this candidate