Post Job Free
Sign in

Energy Project Manager

Location:
Pensacola, FL
Salary:
110000
Posted:
March 30, 2022

Contact this candidate

Resume:

Bryn Paajanen

**** ********* *****

Pensacola, Florida 32526

*********@*****.*** 443-

***-****

Objective

To obtain a position in the field of construction and project management; and, provide the best value of project oversight in utilizing work experience as a contractor, as well as educational background in design and construction engineering management. Related Experience

BB&E Consulting Engineers and Professionals, Norfolk, Virginia Construction Manager, OASIS

NAVFAC MIDLANT DC5 CTR

February 25, 2019-Present

Government Contractor

Provide construction management services and project oversight for Naval Facilities Engineering Command (NAVFAC) at Norfolk Naval Shipyard (NNSY), Naval Station Norfolk (NSN), and Naval Support Activity Hampton Roads (NSA). NSN/ NSA Hampton Roads Project List (09/21- Present):

$67,340 NSN, Building O-27 HVAC & Electrical Modifications- Norfolk, VA. Demolition of existing HVAC equipment, and replacement with a new VAV box, ductwork, diffuser, grill, thermostat, hot water supply and return piping. Contract includes special purpose receptacles, junction boxes, conduit and wiring for a fully functioning system; and Testing and Balancing

$97,266 NSN, Building V-53 Room A326 Security Upgrades- Norfolk, VA. Seal wall and roof penetrations, provide man bars in existing ductwork, enclose opening(s) in the roof deck, remove abandoned ductwork and infill existing gypsum board stud partitions, label existing ductwork and piping, remove existing and provide new expansion joint covers, remove existing and provide new astragal seals and door sweeps on existing pairs of doors, provide conduit, cable trays to match existing, and repair isolated area of concrete floor surface.

$151,015 NSN, Install Servers at NH-140- Norfolk, VA. Demolition and the installation of a new STC door, frame and hardware; demolition of existing wood shelving and carpet down to the slab; installation of new static dissipative(SD) flooring and vinyl base; painting; furnish and installation of a new ductless mini-split system, insulated condensate piping and pump; a new circuit breaker in panel; demolition of fluorescent light fixtures and replacement with LED surface-mounted; demolition and installation of a new electrical panelboard; new special purpose receptacles, junction boxes, conduit, wiring; new telecommunications backboard and grounding busbar; and incidental related work.

$189,587 NSN, Building W-135 Bracing & Column Repair- Norfolk, VA. Structural repairs including demolition and replacement of damaged bracing, and twenty (20) columns. Provide temporary shoring to facilitate construction.

$252,160 NSN, Building SP-46 Roof Repair- Norfolk, VA. Selective demolition and installation of new 40 Year Architectural shingles over #30 roofing felt; plywood sheathing, insulation, and tongue and groove planks to match existing.

$407,431 NSN, Building U-132 Renovate Heads- Norfolk, VA. Renovation of the existing restrooms on the first floor of Building U-132 including plumbing and electrical modifications for new layout; finishes, fixtures, and accessories.

$755,364 NSN, Building V-53 Renovate 1st Floor Repair Shop- Norfolk, VA. Design-build project to renovate approximately 1500 square feet of existing office space into an Optical Site Electronics Repair Shop to support the Navy fleet forces.

$5,022,851 NSN, Building V-53 Room 209/240 Renovation (Lab of the Future)-Norfolk, VA. Renovation of approximately 19,000 square feet of office space on the second floor including new electrical lighting and power, mechanical systems, partitions and finishes; and furniture, fixtures, and equipment for the Consolidated Afloat Networks and Enterprise Services (CANES) lab and open office spaces.

NNSY Project List (02/19-09/21):

$91,599 NNSY Building 1600, Gate P, Replace Electrical Feeds to Security Pop-Up Barriers, Security Pole Lighting and Gatehouse- Portsmouth, VA. Replace the electrical feeds to the security pole lighting, security pop-up barriers, and gate house which are currently no longer functioning.

$108,584 NNSY Building 1500 Seal 7th Floor Mechanical Room for Water Penetration- Portsmouth, VA.

$122,805 NNSY Building 298 Electrical Room Demolition- Portsmouth, VA.

$126,650 NNSY Building 9 Warehouse Repairs- Portsmouth, VA. Demolition of the existing concrete ramp; furnish and install new metal ramp in new location. Replacement of existing lighting system on the first floor and two mezzanines.

$135,486 NNSY Replace CIA Entry Control Point Gates RR-1, N, Q, &F- Portsmouth, VA. Demolish sliding crash gates, and install new manual sliding gate with reinforcing cables and locks.

$140,363 NNSY Building 202 Pipe Shop Gasket Room 1st Floor Repair/Replace HVAC- Portsmouth, VA.

$239,808 NNSY Building 269 Exterior Stair Construct- Portsmouth, VA. Construction of a new, two story exterior exit stair tower near the northeast corner the Building 269 to meet the Life Safety Code requirement for two remotely located exits to serve the second floor.

$250,000 NNSY Building 510 Old Gyro Shop Floor Replacement- Portsmouth, VA. Demolition of old tile flooring; install new paint coating; epoxy/terrazzo finish; and carpet per floor pattern plan layout.

$531,279 NNSY Building 11 Brick Wall Repairs- Portsmouth, VA. Miscellaneous interior/exterior brick masonry repair/point- up at Building 11. Minor electrical, mechanical, and plumbing work associated with masonry repair. Asbestos abatement of existing ceiling tile and wall-base mastic.

$590,000 NNSY High Mast Tower Lights Energy Project RM16-2051- Portsmouth, VA. Replacement of existing high mast luminaries with energy efficient LED lighting and controls. Additionally, work will address repairs to high mast light poles

#803, #636, and #665.

$1.3 Million NNSY Building 51 Roof Replacement- Portsmouth, VA. Complete roof replacement for the existing building 51 to include the eight (8) dormers, gutters, downspouts and brick parapet coping.

$3.5 Million NNSY Building 269, 270, 297 Structural Repairs- Portsmouth, VA. Design-build: removal and replacement of the existing steam condensation piping in Buildings 269 and 270. Restore/replace deteriorated portions existing building electrical, plumbing, and mechanical systems/equipment. Perform structural repairs to the spalled concrete beams, rusted reinforcing steel framing, and deteriorated steel shores the basement of Buildings 269 and 270. Repair/replacement/reinforcement of four

(4) timber columns and/or concrete pedestal bases, and adjacent truss framing in Building 297.

$4.9 Million Fire Alarm Loop 1 Replacement- Portsmouth, VA. Replacement and/or update of the existing Fire Alarm Units which comprises the Fire Alarm Loop 1 System with Radio Based Units and incidental related work. The existing Fire Alarm Systems shall remain functional during the installation of the new Radio Based Units and shall be transitioned to the new system after the new system have been put to operational status and is ready for service.

$5.5 Million NNSY Exterior Lighting Replacement Energy Project- RM12-3347-Portsmouth, VA. Replacement and/or retrofit of exterior site lighting luminaires with energy efficient LED lighting and controls within NNSY and surrounding annexes

(Southgate, Scott Center, St. Julian’s Creek) in accordance with applicable code standards. Provide uniformity in lighting levels, reduce lighting waste and glare, address non-working fixtures/safety concerns.

$6.5 Million Fire Alarm Loop 5 Replacement- Portsmouth, VA. Replacement of the existing Fire Alarm Loop 5 with a wireless system which consists of wireless transmitters and incidental related work. The existing Fire Alarm Loop 5 to remain functional during the installation of the new wireless system and shall be transitioned to the new system after the new system have been put to operational status and is ready for service. Scott-Long Construction, Inc., Chantilly, Virginia Project Manager, September 11, 2017- February 22, 2019 General Contractor

Managed the permitting process with the local jurisdiction to ensure timely receipt of deliverables required to start construction. Developed and managed Master Construction Schedules; re-sequenced construction activities as needed for accuracy of reporting. Descoped and vetted subcontractor proposals for completeness; negotiated and managed the buyout of all trades. Prepared and administered Logistics, Safety, and Quality Control Plans. Completed job site visits to ensure timely completion of scheduled activities, conformance of administrative control plans, and quality assurance for completed and in progress. Reviewed material, equipment and close-out submittals in accordance with the contract documents. Conducted pre-construction coordination meetings prior to the start of critical tasks and design milestones. Utilized technical background to divert additional costs/time associated with unforeseen conditions found throughout construction. Coordinated weekly status meetings with project stakeholders to review outstanding items, progress, and financial updates. Monitored and controlled project financials; completed projections to encompass anticipated costs for completion, risk, and profitability. Reviewed and provided comment for accuracy of subcontractor’s change proposals and monthly invoice requisitions. Managed the timely completion of project close-out items including: the punch-list; end-user training programs; preparation/submission of O&M submittals and warranties; and finalization of construction accounting. Project List:

$1 Million Kaiser Permanente Medical Center Vision Expansion- Marlow Heights, MD. 12,000 square foot medical-use space renovation including updates to existing building mechanical, electrical, and plumbing systems; and finishes refresh. Project Manager.

$7.5 Million Renaissance Senior Living- Annandale, VA- 32,000 square foot Senior Living Memory Care Facility, including 41 resident units; and site modifications to a 3.5- acre lot with unsuitable soil remediation. Sitework & Underground Utilities Project Manager.

$1.3 Million Stafford Crossing Community Church Addition- Fredericksburg, VA. 7,000 square feet mixed use Commercial Construction/Worship Facility including site modifications for new building. Project Manager.

$-Varies Raytheon Company Miscellaneous Capital Improvement Projects- Ashburn Campus, VA. Project Manager.

$4 Million Concerned Women for America (CWA) Headquarters- Alexandria, VA- 13,000 square feet of commercial interior renovation. CM Services/ Project Manager:

Assisted with the procurement of the client’s new headquarters including oversight and management of the Closing process. Provided recommendation for Financial Model Services, and Bank-funding. Contracted and managed all Property Assessment, Environmental and ALTA surveys. Vetted Design Services proposals and contracts for accuracy and completeness. Managed the Development Schedule including design milestones associated with pricing exercises. Completed constructability reviews of design documents, and conceptual budgets throughout the design process including a final, comprehensive bid with Subcontractor pricing. Managed the Owner’s project budget to its entirety throughout construction including all soft costs; provided value-engineering options to meet the project requirements. Kinsley Construction, Herndon, Virginia

Project Manager, February 15, 2016- September 1, 2017 General Contractor

Project List:

$13 Million Lidl Grocery Store- Culpeper, VA location- ground-up construction of approximately 36,000 square feet of Grocery/Retail space including site modifications. Project Manager.

$13 Million Lidl Grocery Store- Ashton Avenue, Manassas, VA location- ground-up construction of approximately 36,000 square feet of Grocery/Retail space including site modifications. Project Manager.

$2 Million Arlington Village Townhouse Association Concrete Restoration- Phase 1- rehabilitation of deteriorated concrete elements within the crawlspace of the seven subject buildings, Installation of vent fans and plastic sheeting along the exposed soil. Responsible for the proposal preparation of subsequent phases of construction. Project Manager.

$9 Million Buchanan School Conversion Multi-Family project- 41 unit luxury condos in Alexandria, Virginia. Assist in the effort to rebid and/or confirm subcontractor pricing; assemble the Guaranteed Maximum Price for the Owner; value engineer; subcontractor buyout and award.

Preconstruction:

$Multi-million Seven (7) Lidl Grocery Stores Northern, Virginia- ground-up construction of approximately 40,000 square feet of Grocery/Retail space including site modifications. Bid Captain- successfully awarded the construction contracts for four store

(4) locations.

$9 Million Lidl Headquarters Phase II- Design-Build Tenant Fit-Out of approximately 80,000 square feet of office space; targeting LEED Gold for Commercial Interiors Certification. Bid Captain.

$80 Million Columbia Pike Village Center Mixed-Use Residential- approximately 365 units; Harris Teeter cold shell; and parking garage. Assist with the preconstruction effort to value engineer, prepare and submit budgetary pricing. Atlantic Design Group Inc., Columbia, Maryland

Project Engineer, November 11, 2013-October 2, 2015 Architecture, Engineering, and Construction Management 8A Government Contractor- Department of Defense

Provided oversight and project management of FAMACC construction projects contracted through the Maryland Procurement Office (MPO), Installation and Logistics Group of the Department of Defense. Experience working in Sensitive Compartmented Information Facilities (SCIF) environments including a comprehensive knowledge of Government standards for design, construction, quality, safety, and security.

Project List:

$2.5 Million Wounded Warrior Project Phase I & II- Internet Café- interior fit out project of 13,000 square feet of office space including an Argo Tea restaurant kiosk. Project Manager/Superintendent.

$2.9 Million Relocate RF ROC- Command Center interior fit out project of approximately 5,200 square feet of space for a new command center within a SCIF. Project Manager.

$1 Million 9800 O’Brien Road Parking Garage Concrete Repair- restoration of reinforced concrete structure. Superintendent. Roush Enterprises, Livonia, Michigan

Assistant Facilities Project Coordinator, May 21, 2012- August 14, 2013 Engineering, Testing & Development, Prototype Services, & Manufacturing Facilities Planning and Project Coordination

Abet the planning and development of facilities capital improvement and special projects $40,000-2,000,000 in cost. Conduct site surveys, estimate project costs, prepare bid packages, and award contracts. Manage the schedule of sub- trades, oversee work flow, and provide status updates to ownership. Assist in the procurement of new buildings by reviewing the existing site conditions including: site/building exterior, roof, building enclosure, interior conditions, electrical and mechanical systems, and equipment. Provide ownership an estimation of remediation costs for code violations and improvements for the occupant’s intended use. Develop corporate standards for interior finishes and furnishings, including systems furniture. Negotiated national contract pricing with manufacturers for direct purchase relationship. Estimated cost savings of $70,000 within the first six months of employment. Total Glazing Solutions, Sylvania, Ohio

Architectural Products Specialist, August 15, 2011- October 26, 2012 Glass, Ceramics, and Concrete

Increased sales opportunities for manufacturer's representatives by expanding clientele to the architectural market. Utilized construction reporting services (Dodge Reports, iSqFt, Ohio Builder’s Exchange, Reed CONNECT Construction Data) to review the construction documents of projects for bid. Solicited Architects and/ or construction managers to request substitution of alternate to the specified building products

SSOE, Inc., Toledo, Ohio

Interior Design Internship, January 7, 2008- June 27, 2008 Architects, Engineers, and Managers

Improved proposals through the suggestion of innovative solutions which met the owner's scope and program requirements. Assisted in the preparation of construction documents and ensured accuracy and consistency through review and revision. Attained experience working for an ISO 9001 certified EPCM firm, which utilizes Six Sigma strategy of efficiency and business management. Continental Office Environments, Toledo, Ohio

Interior Design Internship, September 3, 2007- January 4, 2008 Certified Herman Miller and HON furniture dealer

Supported the design and sales team in creating proposals for facilities planning projects. Reviewed project scope and program requirements with owners; space planned and made recommendations for furniture and finishes. Assembled estimate packages using CAP Studio/20-20 worksheet computer programs Education

Lawrence Technological University, Southfield, MI

Master of Construction Engineering Management, December 2011 Focus: Integrated Project Delivery

Bowling Green State University, Bowling Green, OH

Bachelor of Science in Interior Design, May 2008 Focus: Sustainable Design

Computer proficiency

Microsoft Office Professional Suite (Word, Excel, Access, Publisher)

MS Project

Working knowledge of Oracle’s Primavera Enterprise Project Portfolio Management application (P6)

Sage CRE 300 Timberline

eContracts

RSMeans Costworks

Oracle’s PeopleSoft

PlanGrid Construction App

Adobe Creative Suite

Bluebeam Revu

AutoCAD

Gradebeam

SmartBid

Docusign

Professional development

Occupational Safety & Health Administration (OSHA), 30-Hour Construction Safety and Health, July 2014.

United States Army Corps of Engineers (USACE), Construction Quality Management for Contractors, November 2021.



Contact this candidate