Post Job Free

Resume

Sign in

Safety Officer Hse

Location:
Chennai, Tamil Nadu, India
Salary:
45000
Posted:
March 29, 2022

Contact this candidate

Resume:

Curriculum Vitae- Sridharan–

Document Number *

Sridharan Subbiah

HSE / CONSTRUCTION SPECIALIST

Sridharan Subbiah

HSE / CONSTRUCTION SPECIALIST

Introduction:

To pursue with professional offering, clear and exciting growth path for a performing candidate, looking for an opportunity to work in a highly stimulated, innovating and positive environment.

My experience includes working in various industries like:

Heavy Fabrication & machinery components.

Olefins II Sea water cooling tower construction inside Shuaiba Refinery,

Marine science university project- Fintas (Ministry of Public works, Kuwait),

Sanitary engineering projects SE/100 & SE/66 (Telemetric Building, Ardiya (Ministry of Public works, Kuwait),

Infrastructure projects like (RA/185, RA/211, RA/222, RA/ 259 Public Authority for Roads and Transport (Ministry of Public works),

Oil and Gas (Neutral Zone between Kuwait and Saudi Arabia- Joint Operation Wafra, Kuwait Oil Company).

Worked as HSE officer, HSE Lead (Mushrif -Head office), HSE Manager, Construction Specialist (Safety) in various projects or facilities (Civil, Infrastructure, Sanitary engineering, Oil and gas, petrochemicals, PART

(MPW, Kuwait)

The review priority will be project scope of work, HSE policy, HSE plan, Foreseeable hazards, Emergency Plan & Procedure, Accident prevention Plan and Procedure and Method statement & Risk Assessment (both Consultant & Contractor).

Worked with Challenging Contractors in following HSE standards and regulations, safe work methods and procedures. Highlighted their discrepancies through various notifications and making them comply with standards in minimizing their incident rate.

Trainings:

Managing Safe work – Joint operations, Kuwait.

"Train the Trainer" by City & Guilds from Joint Operations, Kuwait.

Behaviour Based Safety (BBS) Training from Joint Operations, Kuwait.

H2S Awareness training from Joint Operations, Kuwait

SCBA – Joint Operations.

Defensive Driving – Wataniya Environmental Services.

Scaffolding (Basics) – Tutis Training Centre.

Advanced Driving Techniques – Jacobs Engineering (Internal) Areas of Expertise

HSE Audit / Inspection

Incident Investigation

HSE Trainings

Preparation of HSE PLAN

KPI

Proven Skills

Planning and organizing.

REGISTRATIONS/

CERTIFICATIONS

NEBOSH - INTERNATIONAL GENERAL

CERTIFICATE

RIG PASS – IADC

FEDERAL HIGH WAY ADMINISTRATION

– 30 HOURS MINISTRY OF PUBLIC

WORKS, KUWAIT.

OSHA 30 & 10 Hrs Construction outreach

Program

IDIPOSH (BSC) – AWAITING RESULT

MEMBERSHIPS

AND AFFILIATIONS

TECHNICAL MEMBER – IOSH, ID

202836.

AWARDS/HONORS

Appreciation - Chevron (Saudi Arabian) –

JO/SC/302 /P005 Joint operation, Wafra –

Project

Appreciation by Resident Engineer URS

Scott Wilson - RA /185 MPW Project

Appreciation Certified by Resident

Engineer from KEO-Parson (JV) – SE/100

Project

Appreciation from Sea water cooling tower

(JV) for one million safe man hours

(OL2K).

EDUCATION/QUALIFICATIONS

DIPLOMA IN ENGINEERING,

COMPUTER TECHNOLOGY,

DIRECTORATE OF TECHNICAL

EDUCATION, 2001; CHENNAI.

LANGUAGES

List language and level of ability

Curriculum Vitae- Sridharan–

Document Number 2

Sridharan Subbiah

HSE / CONSTRUCTION SPECIALIST

Written and verbal communication.

Organizing meeting with staffs, Clients and other contractors, Clients.

Monitoring and corrective action as per facility rules Relevant Project Experience

1. Acetech Machineries components India Pvt. Ltd & Acetech Heavy Fabrications Pvt Ltd

Title: HSE Manager

Start/End Dates: August 2020 – Feb 2021

Scope: "Design, Manufacture and Supply of Ferrous & Non-Ferrous Fabricated Steel components for the Mining, Construction, Agriculture, Automotive, Earthmoving, Railways, Defence, Oil & Gas, Infrastructure, Process and Energy industry".

2. RA/259, Salmi, Construction, Completion, and Maintenance of road and interchanges in existing 6th ring road to interchange #82. Client: Public Authority for Roads and Transport (PART), Ministry of Public works, Kuwait.

Title: Construction Specialist (Safety)

Project Value: KWD 149,524,287

Project Duration: 3 years

Start/End Dates: March 2018- Feb 2020

Scope/Description:

This Project commenced on 30thoct 2017 and ends on 27th Nov 2020, 1825 days and Project value of 149, 524, 287 KWD.

The Salmi expansion project consists of main components like:

Total Road length approx.: 49.9 km – up gradation from 2 lane, 3 lane & 4 lanes.

Road length /Lane, 4 Lanes-34.4 km, 3 lanes- 4.9 km & 2 lanes - 10.7 km.

Total area -779880 m. sq.

Construction of 4 intersections (IC 82 (3 levels), IC 87, IC 92, & IC 98

Construction of 3 Bridges (P1, R1 & Railway Crossing Bridge)

Construction and maintenance of the Temporary detours.

Road marking, signage’s, Speed cameras, gantry signage, NJ Barrier, MSE walls, Street lighting, construction of water pipelines, storm water drainage, Telephone networks etc...

3. RA/222, Salmiya, Construction, Completion and

Maintenance of Bridge &Other Services at Gulf Street on Al-Bidda Roundabout.

Client: Public Authority for Roads and Transport (PART) Ministry of Public works, Kuwait.

Title: Safety Officer / The Kuwait Company for Process Plant Construction and Contracting.

Project Value: KWD 18,000,000

Project Duration: 2 years

Curriculum Vitae- Sridharan–

Document Number 3

Sridharan Subbiah

HSE / CONSTRUCTION SPECIALIST

Start/End Dates: July 2017to Feb 2018

Scope/Description:

To improve the performance of Al Bidda Roundabout with construction, completion and maintenance of 2 Reinforced concrete Flyovers across the roundabout.

Each flyover will carry 2 lanes of traffic and will be over 330 m long and of 12 spans.

Special noise/ visual protection screen will be provided on top of some parts of the flyover parapets. The flyover will have piled foundations and columns will have Y – shaped top for appearance.

Provision & installation of bearing, expansion joint, drainage pipes and gullies are also included in the work.

The flyover approaches will be walled (on the ramp sides) using MSE walls with parapet on top of the wall abutment.

The scope also includes the construction of utility box culvert of 560 m long and 8.0 m depth and 4.25 m wide on North East part of the project.

4. Contract No. 15050923, New Flow lines for 5 existing injection wells,1 new source well & replacement of 19 existing brackish water flow lines- West Kuwait Plus emergency brackish water line to NFT, Kuwait.

Client: Kuwait Oil Company (KOC)

Title: Senior Safety Officer / Mushrif Trading & Contracting Company Start/End Dates: April 2017to June 2017

Scope/Description:

Flow lines maintenances include installation of new flow lines.

2 No's of Guard house constructions.

5. RA/222, Salmiya, Construction, Completion and

Maintenance of Bridge &Other Services at Gulf Street on Al-Bidda Roundabout.

Client: Public Authority for Roads and Transport (PART) Ministry of Public works, Kuwait.

Title: Safety Officer / Mushrif Trading & Contracting Company. Project Value: KWD 14,000,000

Project Duration: 2 years

Start/End Dates: May2016 – March 2017

6. Flow line Replacement and General support for Production Operation JO/SC/302 – PO 11

Client: Joint Operations, Wafra, Neutral Zone Kuwait (KGOC & Saudi Arabian Chevron).

Title: Safety Officer / Mushrif Trading & Contracting Company. Start/End Dates: June 2013 – April 2016

Scope/Description:

Flow lines maintenances includes installation of new flow lines

(6” & 4”TK 236 Pipes, Trunk lines) replacing of well drops (Live crude to Main Gathering Centre’s).

Installation of Commingle points, well shutdown, partial re- Curriculum Vitae- Sridharan–

Document Number 4

Sridharan Subbiah

HSE / CONSTRUCTION SPECIALIST

routing, preparing temporary production headers while sub centres may be in renovations etc.

Installation of valves drain spool and replacement of Gas lines

(sand phase).

Commissioning of new sub centre’s (Gathering Centre’s) erection of Manifolds, Separator’s, drop lines, Travel piece etc.

Major shutdowns like up gradation in Sub centres, Maintenances, satellite manifold up gradation, trunk line rerouting etc. 7. Construction, completion and maintenance of a remote monitoring & control centre, for the facilities of sewage network in Kuwait

Client: Ministry of Public Works (Sanitary Engineering) Ministry of Public works, Kuwait.

Title: Safety Officer / Mushrif Trading & Contracting Company. Project Value: KWD 16,388,000

Project Duration: 2 years

Start/End Dates: November 2012 – June 2013

8. Construction, Completion & Maintenance of interchanges on Main Highways Jahra Motor ways & Fifth Ring Motor Ways Connection with Jahra& South Doha IC 02, 10, 08.

Client: Public Authority for Roads and Transport (PART) Ministry of Public works, Kuwait.

Title: Safety Manager / Mushrif Trading & Contracting Company. Project Value: KWD 21,785,000.

Project Duration: 2 years

Start/End Dates: August 2010 – October 2012

Scope/Description:

Interchange: 02

The motorway divided into two carriageways, Side hard shoulders, and a median. The trough structure stretches for about 700m.

The foundation is composed of tension piles and a base slab.

Wing walls are required on both sides of the trough. Most of it is straight and the central ones were curved to form the roundabout.

Bridge deck slabs (2 Nos.) at two locations with two sets of piers and transition slabs.

Terraced landscaping is required on both sides of the road in circular trough

The existing U-Turn at the west end of the project will be demolished and closed

The existing junction at the entrance to residential area will be demolished for constructing the new roundabout and trough.

New storm water with 3 pumps will be required behind the wing walls

Other ancillary structures include New Jersey barriers, kerbstone and walkway tiles, steel guardrails dwarf walls for chain link fence, gantry Curriculum Vitae- Sridharan–

Document Number 5

Sridharan Subbiah

HSE / CONSTRUCTION SPECIALIST

foundation, and median, services structures, etc… are not included in the above.

Most of existing services are located on the north side of the road including telephone network, street lighting, irrigation, landscape, and 132 kV overhead cables.

Services will include storm water, modification to existing storm water line, telephone ducts, irrigation ducts, traffic signal ducts, rerouting of 11kv overhead cables, and street lighting. All will be within the services reserve within the right of way.

Erection of Overhead traffic signs on gantry frames, High mast, direction signs, traffic regular road signs, road marking, lane marking, reflective/non-reflective studs, and chevron.

Roadwork will have the highway part, a trough, and a roundabout including two bridges, four approach roads, and two junction roads. Interchange 08:

Construction of a new semi-circular ramp to form a loop on the northeast side of the interchange.

The existing sides of the interchange require mass backfill to form the grade shape with terraced (stepped) landscape profile using concrete retaining walls.

Part of the existing landscape plantation shall be removed.

Required services include storm water networking system including gullies and pipes across the road, irrigation road crossing ducts, and street lighting.

Road construction will include asphalt paving, kerbstone, guard rails on both sides, ancillary works, road signs, and marking

Traffic signs on frames, direction signs, traffic regular road signs, road marking, lane marking, reflective/non-reflective studs, and chevron. Interchange 10:

The scope will include modification of the existing junction to be a roundabout below the bridge structure, abutments and 4 lines of bridge piers.

New Jersey barriers will be required to protect the existing bridge supports.

Guardrails will be required at designated locations.

This will require modification of the existing roads, removal or diversion of existing services.

New services provided including storm water lines and gullies, water lines ducts and road crossings, ducts and sleeves for underground 132 kV lines, telephone ducts and manholes, irrigation services, street lighting, traffic signal ducts, as required by the concerned authorities.

Traffic signs on frames, direction signs, traffic regular road signs, road marking, lane marking, reflective/non-reflective studs, and chevron. 9. Study, Design, Construction, Operation & Maintenance of pumping Station, Wastewater Treatment Plant and Pressure Mains in South of Amghara and South of New Jahra Scrap Area - Contract

– SE/100

Client: Sanitary Engineering, Ministry of Public works, Kuwait. Title: Safety Officer / Mushrif Trading & Contracting Company. Project Value: KWD 56,000,000.

Curriculum Vitae- Sridharan–

Document Number 6

Sridharan Subbiah

HSE / CONSTRUCTION SPECIALIST

Project Duration: 2 years

Start/End Dates: April 2008 – August 2010

Scope/Description:

Process and non-process Buildings,

Transmission Line,

Twin lines,

Over Head Lines,

Guard House,

Main Pumping- Station (Jahra).

10. Marine Science University, Fintas

Client: Ministry of Public works, Kuwait.

Title: Safety Officer / Mushrif Trading & Contracting Company. Start/End Dates: Feb 2008 /March 2008

Scope/Description:

Construction of North and South Buildings (2), Culvert Area, Boat House. 11. Dow- PIC olefins II Project, Seawater Cooling Tower

(SCT 06-001 /OL2K) Kuwait.

Start/End Dates: April 2007 – Feb 2008

Scope/Description:

Construction of Cooling Tower (2 No’s), Pump station, Substation. In power plants, Petroleum refineries, petrochemical plants, natural gas processing plants as cooling system of circulating water are essential to absorb the heat deriving from the production process. Cooling towers dissipate the heat into the atmosphere where wind and air diffusion spread it over the unacceptable impact on the local eco systems, which would result, were the heated water will have returned to its source. Moreover, with the cooling towers, a much lower amount of cooling water needed, thereby reducing the overall cost of the industrial production.

Responsibilities:

Supervision and monitoring the implementation of Health and Safety plan of client and company.

Carrying out safety audits (SMA) to ensure that only safe methods of working are in operation and that all regulations, MSW are being observed.

Carrying out BBS- Behavioural based safety assessments and reporting to client as part of contract.

The findings of any unsafe acts /Condition through Hazard Reporting to immediate Supervisor/ Project manager and recommend what measures, if any, ought to be taken because of inspection.

Determining the cause of any accident or dangerous occurrence and recommend means of preventing recurrence.

Advising management on preventing injury to personal, damage to Curriculum Vitae- Sridharan–

Document Number 7

Sridharan Subbiah

HSE / CONSTRUCTION SPECIALIST

plant, and equipment, improvement in existing work methods, provision and use of PPE.

Coordinate with Site staffs in advising the project management:

Improvement in existing works method.

Legal requirements affecting safety, health and welfare.

Identify Potential hazard before work starts.

Methods of safe working arising from new developments.

Shall co-ordinate with the Supervisor/Engineer regarding work performance and to exercise stop work authority in any area where discrepancies remain unsafe and shall cancel the permit to work upon satisfactory correction of noted discrepancies.

Deliver safety induction courses for new staff and workforce at project level.

Be responsible for reporting and recording accidents/incidents to HSE Department by Collecting and formulating data from the project.

Organizing and conducting site safety committee meeting.

Promoting awareness of injury prevention and damage control to all levels of employees.

Organizing safety training, such as first aid and Toolbox talks.

Keeping in contact with official and professional bodies.

12. Jan 2005 – Jan 2007 (Kuwait) Social compliance officer,

Worked as a social compliance officer for McDonalds, in Kuwait. Responsibilities include:

Preparing all the Hazards and critical control points

Check for the positive approach and results.

Graded A continuously for 2 years from the External Audit Personnel from Europe for maintaining high standards & documentation.

Monthly Meeting and training towards occupational safety and health, for both old and fresh candidates.

Develop committee members, organizing and discussed on various polluting hazards, Chemicals, sewage and other normal wastages.

Recycle option was suggested in particular areas where it was applicable to save energy and source.

Maintaining the facility with various Internal & External audit’s and to stay update with all related issues towards Safety and Hygiene.

13. Jan 2004 - Dec 2004(Kuwait) Graphic Designer – Pre Press

Having experience as a Graphic Designer in Pre- Press Department.

Designed many commercial jobs and mainly focused on packaging.

Check for final production (film and outline).

Curriculum Vitae- Sridharan–

Document Number 8

Sridharan Subbiah

HSE / CONSTRUCTION SPECIALIST

14. May 2001- Sep 2003(India) System Engineer,

Responsibilities include:

Installation, assembling, maintenance and Servicing Desktops and Printers.

Worked for annual maintenance for major clients includes Government, Private, Public Companies and Individuals.

Provide Consultation, support to company and external customers.

Provide support to End-user regarding any IT problems.

Trouble shooting in all the OS, Printers, and other networking applications.

Travelling to customer place to provide hardware and software support.

Update with software packages and other accessories.

Knowledge in branded systems.

Good communication with the customers and end users. Other Information

Contact Details:

Mr. Sridharan Subbiah

Email: adqmei@r.postjobfree.com

Mobile: +91-638*******.

Others:

Date of Birth: 24/9/1980

Passport No: R8111579

Place of Issue: Kuwait

Date of Issue: 30/07/2017

Date of Exp: 29/07/2027.

Kuwait Driving License expiry: 18/06/21.



Contact this candidate