Post Job Free
Sign in

Land Surveyor Qc Engineer

Location:
Al Dafna, Qatar
Posted:
March 27, 2022

Contact this candidate

Resume:

EDUCATION

LAND SURVEYOR

TRIUMPH SURVEY INSTITUTE

( Government of India Certificate)

SSLC & HIGHER SECONDARY

MG Higher Secondary School

TOTAL STATION

Triumph Institute

AUTOCAD 2D&3D version 2010

G – TEC Computer Institute

Certificate course in DTP& office automation

Gurudev Computer Institute

SEMEER .R

LAND SURVEYOR

11 YEARS EXPERIENCE

CONTACT

+974-******** ( Qatar)

+91-984******* (India)

**********@*****.***

CAREER OBJECTIVE

My goal is to become associated with a

company where I can utilize my skills

and gain further experience while

enhancing the company productivity

and reputation.

PROFILE HIGHLIGHTS

11 years of work experience

Land surveyor, AutoCAD operator

To fully apply my technical knowledge

and experience in the field of

Surveying with an organized teamwork

in performing the duties and

responsibilities for the completion and

success of the project and entire

satisfaction of the client.

SKILLS

Good knowledge about Total Station

and Auto Level

Highly experienced in Auto CAD

drawing preparation.

Experienced in field works

managing sites

Control point establishment

2D&3D drawing preparation

Topographic & as-built survey

Cross sectional survey

Set out

Steel structure alignment

WORK EXPERIENCES

A position as a Land Surveyor with 11Years (2years in India

& 9 years in UAE&QATAR) of utilizing experience as well as comprehensive background with different types of projects

(Roads, Land, Building Construction and Steel Structure construction, fabrication & Erection)

LAND SURVEYOR

EVERSENDAI ENGINEERING

Steel Structural Construction UAE & Qatar

2012 DEC to 2021 DEC

LAND SURVEYOR

MERDIAN SURVEY& Mapping Pvt.Ltd, Cochin, Kerala

2011 OCT -- 2012 NOV

LAND SURVEYOR

SURVEYORS Pvt.Ltd, Ernakulum, Kerala

2010 OCT – 2011 OCT

COMPUTER SKILLS & EXPERIENCES

AutoCAD 2D&3D (version 2010 to 2020)

Preparation of coordinates and measurements from approved design drawings for survey inspection and set out.

Preparing coordinates in AutoCAD, using survey lisp for alignment and setout marking

Download as-bult Coordinates from Total Station then transfer to AutoCAD, Preparation of soft drawings and Reports.

Import AutoCAD 3D from Tekla model, find out and marking required location in the 3D drawing, then create Coordinates using survey lisp.

Tekla steel structures software :- 3 month of work experience in Tekla steel structure 2D&3D modeling software,

Preparation of assembly drawing and survey

coordinates from tekla model.

Creating 2D&3D CAD files for survey.

Conversion of drawing file in to other formats.

Microsoft Office Excel

All related work with internet and E-mail.

Dimension controlling

Good confidence to any type of survey

work

Managing all survey related works

Survey and workforce management

Quality and safety management

Good numeracy skills and

concentration

Logical thinking and problem solving

PROJECTS

Abu Dhabi International Airport(UAE)

S .K Masjid Alain (UAE)

Nas Arena Multipurpose Hall (Dubai)

Address Residence Sky View (Dubai)

ICD Brookfield Tower (Dubai)

Museum of the future (Dubai)

Opportunity pavilion (Dubai expo)

Zayed National Museum (UAE)

KSA Pavilion (Dubai expo 2020)

Qatar National Museum (Qatar)

Pearl Mansion(Qatar)

Al Wahda Arches (Qatar)

Doha Oasis Tower (Qatar)

Quetaifan waterpark (Qatar)

Dune plaza (Qatar)

HIA Expansion project (Qatar)

CMA Tower (KSA)

KAFD Iconic station (KSA)

Kuwait University (Kuwait)

Kannur International AirPort Project,

Cochin Metro Rail Project,

LNG Terminal Cochin,

P.W.D Road Projects,

Vizhinjam Container Terminal

Railway Project

EQUIPMENTS HANDLED

Total Station : - Sokkia SET210,

Sokkia SET220, Sokkia CX101,

CX 102, LeicaTC1102,

LeicaTCR1203, Leica Viva TS15,

Leica407, Pentax R- 325NX etc…

Auto level, Laser level

DGPS :- Trimble R8

INDUSTIAL EXPERIENCE

Road construction survey

Building construction survey

Land surveying

Steel structure construction survey

Fabrication Industry survey

Site responsibilities

Collect the Hard copy and soft copy Drawings from design team and preparing required survey coordinates from Tekkla or AutoCAD drawing to perform the survey

Establishing control points on the work area.

Setout column bolt location

Marking and alignment of Anchor bolts and embedment plates.

Marking required coordinate location on the fabricated components for the erection alignment.

Conducting through stage-wise inspection as per

procedures as well as alignment & and level. Maximum tolerance of 3mm precision. Any deviation noted, that mentioned and give the corrective action.

Discuss with project engineers and QC for any correction works if required.

after all work, collect asbult coordinates from required locations and submit to QC

Making survey inspection reports and maintains records.

Submitting survey report to QC engineer, Project engineers.

Coordinating with project engineers and QC engineers.

Doing survey inspection with QC and Consultant.

Participate in project meeting and discuss on all issues

Coordinating & controlling all survey related works on the site.

Maintain records of calibration details of all survey machines

Ensure that work is being carried out as per Quality and safety standards

Fabrication Yard

Preparing dimensions from the Tekla detailer and Auto CAD for survey inspection.

Marking layout for fabrication using Total station

Establishing temporary control point in the work area, for further survey inspection.

Checking xyz dimensions in all site connection areas in the fit-up assembly with survey drawing. If all dimension are within tolerance will give welding permission.

Checking final stage survey after completing the all welding works. If any deviations noted that mentioned and give the corrective action.

PASSPORT DETAILS

Passport Number : - T 9256614

Date of Issue :- 23 -10 -2019

Date of Expiry :- 14 – 04 -2029

Place of Issue :- DUBAI

Visa status :- Transferable VISA in

Qatar

PERSONAL INFORMATION

Gender : Male

Nationality : Indian

Marital Status : Married

Date of Birth : 30-05-1987

Languages Known

English

Hindi

Malayalam

Tamil

Maintain and controlling all site erection requirements for proper matching of fabricated components.

Making survey inspection reports and maintain records, Submitting survey report to QC engineers.

Doing survey inspection with QC and Consultant.

Coordinating & Controlling all survey related works in the fabrication yard

GENARAL EXPERIENCE

Topographic and Contour survey, Earth work, cutting, filling and leveling.

Benchmark traversing using Auto levels for establishment of new Benchmark

Road elevation, curve and boundary line set out survey.

Establishment of curbstone and boundary stone.

Pipeline alignment and level

Control point fixing using GPS

Download the data from total station & GPS

Prepared drawing for construction from collected data from GPS & Total stations.

Responsible to solve any survey obstruction arising on the project

Supervision of survey team and manage the survey group.

Ensure that work is being carried out as per Quality and safety standards.

DECLARATION

I hereby declare that above statements are true and correct to the best of my knowledge and belief.

SEMEER. R



Contact this candidate