*)Nameofthecompany : Heisco(Kuwait)
Position :Electricaltechnician
Projet : KipicAl-zour(Refinery)
Duration :FromNovember-2018ToApirl2019
4)Nameofthecompany :Heisco(Kuwait)
Position :Electricaltechnician
Projet :Megacomplex-KOC-Westkuwait
Duration :from May2019toAugust2019
5)Nameofthecompany :Pentaglobalengineering(Kuwait) Position :Electrician
Projet :Knpc(Cleanfuelproject)
Duration :February2018toSeptember2018.
6)Nameofthecompany :Al-fanar(SaudiArabia)
Position :Electricaltechnician
Project. :GIS380&110Kv(Switchgear)
Duration :FromOct-2015ToNov-2017.
PROFESSIONALEXPERIENCEININDIA
1)Nameofthecompany :Babuengineering(India)
Position :ElectricalTechnician
Project :(BW)maintenanceNlc
Duration :FromJuly-2012Tomay-2014
2)Nameofthecompany :L&Tlimited(India)
Position :Electrician
Project :atomicplant(kudankulam)
Duration :FromDEC-2009ToMARCH-2012
DUTIES & RESPOSNSIBILITES:
Involved in Installation & Testing of 11KV & 33 KV Electrical Transformer/ SwitchGear Panel.
Reviewing of Electrical Drawings & Documents, such as, Electrical Equipment Layout, Electrical Cable Schedule, Electrical Wiring diagram, Electrical Circuit diagram, Single Line Diagram, Lighting Layout, Earthing Layout, Standards / Specifications, Cable Tray Layout, Electrical Equipment Support Drawings, etc.
Involved in Installation of New EOT Cranes (Electric Overhead Travelling Crane).
Involved in Trouble shooting in Electrical and Mechanical Defects for EOT cranes.
Involved in Repairs and Replacement of Malfunctioning Electrical Equipments such as load cells, Magnetic Drive Systems, Relay Switches, Contactors, limit Switches Wireless and Wired Pendents.
Involved in Installation of Cable Trays, DB & JB support and other support works according to approved drawings and Standards/Specifications.
Involved in Installation of Marshalling Panels, Power Distribution Panel, as per approved location drawings.
Involved in Iinstallation of Glanding & Termination of Power Cable, Control Cable and Lighting Cables.
Involved in 11KV & 33KV Underground & above Ground Power & Control Cables.
Involved in all types of Cable Splicing works.
Involved in Installation & Testing of 440KV LV motor .
Involved in Installation & Testing of Feeder Modules in Substation as per approved drawing and standards.
Involved in complete Earthing systems (Equipment & Structural) and Earth rod installation, Earth Plate(BusBar) installation as per Approved Typical Drawings and testing of earth resistance values.
Co ordination with Vendor representatives for SAT (Site Acceptance testing).
Involved in Installation of CP (Cathodic Protection) underground works.
Lotto test training completed in JGSK Joint venture.
Co ordination of Material Receiving Inspection with Client all E&I Materials.
Co ordination with Construction Supervisors to ensure the job’s are executing as per Project Approved Quality Procedure.
Co ordination with other discipline supervisors like Mechanical, Civil, Piping, Instrumentation to ensure that the E&I works are executing with obstruction of other discipline.
Co ordination with Civil supervisor that the cable trenches are excavating as per approved drawing and if any field change will be notified to client for changes and approval for proceeding. Also the excavated trenches are not obstruction for other works.
Involved in Installation of Instrument Cables, Control cable, FO cable and testing and recording the values.
Involved in Instrumentation Drawings & Documents, such as vendor Datasheets, Material test Certificates, test reports, Calibration reports, Cable Schedules, Layouts, P&ID, etc.
Involved in Installation of Instruments, SS tubing, JB Stanchion, Instrument Stands and supports.
Involved in Installation of Instruments field JB’s, Instrument Air manifold, Filed instruments installations.
Involved in Installation of Instruments installation like supports, trays, ladder, trunking and Conduit Pipe etc.
Involved in Installation of Instruments control panels, I/O panels, Pair/Triad/Core cables installation and meggering, cable glanding & terminations.
Involved in Installation of Field instruments such as Pressure, Level, Temperature, Flow & Analyzers as per Standards.
Involved in Termination of Instrument cables in Field Junction box and corresponding Panels and Marshalling cabinets.
Involved in Loop checking, continuity checking for cables from Field Junction box to Marshalling Cabinet and from Marshalling Cabinet to DCS panels.
Checking and verifying installation of field instrument as per Piping & Instrument Diagram
(P&ID).
Involved in installation of Level transmitters (GWR and Ultrasonic Type),Level indicators, Level switches,Pressure transmitters, flow transmitters, O2 analyzers, H2S analyzers, Motor Operated Valve (MOV), ON OFF Valve, Pressure control Valve(PCV)
Involved in field instrument Installation like Transmitter, Gauges, Flow Meters, ESD Valves, MOV and Control valves, Pressure Relief Valves, Hook up Materials and loop checking.
Done installation of Gas detectors for combustible gases and H2S gases.
Installation of Blue beacon for H2S gas detection system.
Installation of Red beacon for Combustible gas detection system.
Installation of Horn for H2S and Combustible Gas detection system.
Installation, Termination, calibration and Field testing of complete H2S and Combustible Gas detection system.
KEY SKILLS:
Self motivated, Hard working, Good knowledge of handling tools and Interpersonal ability.
Dedicated Team Member.
Good in Maintainance Activites, Execution and on site arrangement.
High Standard of Work ethics and Positive Attitude towards Job. OTHERPERSONALDETAILS:
DateofBirth :28-05-1992,Age:29years
FathersName :A.JAYAPALAN
Languagesknown :English,Tamil,malayalam&Hindi
MotherTongue :Tamil
MaritalStatus :married
ExpectedSalary :Negotiable
DECLARATION:
Iherebydeclarethattheinformationfurnishedaboveistrueandcorrecttothe bestofmyknowledgeandbelief.IassurethatIwillworksincerelytoyourentire satisfaction.
Date:
Place:
(SASIKUMAR.J)