CAREER OBJECTIVE:
CERTIFICATION:
EXPERIENCE:
CURRICULUM VITAE
Name: Mr. Akshay Manohar Zende.
Qualification: BE(Mechanical).
E-mail ID: *****.**********@*****.***
Contact : +919*********
Seeking a position in competitive and challenging environment where I can utilize my skill and ability for betterment of the organization and my professional growth.
• SNT-TC-1A LEVEL II IN LPT, MPT,RT,UT, VT
• CERTIFIED WITH WELDING INSPECTOR CSWIP 3.1(Supplier base). 5 years of experience in Pump Industry
1. Sulzer india pvt.ltd.Mumbai
Aug 2021-Till Date
Role-Incomming Quality inspector
2. Prash Quality and NDT Service, Kolhapur
May 2020-Till date.
Role-TPI quality inspector
It provides inspector to FLOWSERVE, TUV, Sulzer, LNT,ITT etc. 3. A Square Inspection Service,
May 2020- Till date.
Role – TPI Quality Inspector
Company provide third party inspection to IMI critical engineer. 4. Gouri Engineering Works
April 2020 – May 2020
Role – Quality In charge, Production Planning and Control 5. ICS India Pvt. Ltd, Pune
November 2019 – March
2020 Role – Supplier
Quality Inspector
Company provides third party quality inspector to 'Kirloskar Brother’s 6. Sanjay Engineering
Works March 2017- 30
September 2019 Role –
Quality Supervisor
ACTUAL WORK:
1) Sulzer india pvt.ltd.India
• Responsibility of all quality activities such as incoming quality, assembly quality and final quality inspection and dispatch clearance.
• Visiting vendors to improve vender quality regarding Gauges, instrument handling, calibration of equipment’s and suggestions to improve quality.
• During incoming inspection I will handle all the measuring equipment’s and and check each and every part of pump if any Deviation occur I will discuss it with seniors and decide component subject to fitment or not.
• Solving assembly and testing problems regarding customer requirement, fitment connection, casting problem, hydro testing problem and field complains
• In final inspection checking of visual tagging, connection and handle third party inspector performance test & final inspection reports regarding dispatch clearance
• Also handling non destructive testing DP,MP,RT,UT,VT and also carried out PMI machine for material composition
• Machining part inspection, fabrication inspection, Casting inspection, Non-Destructive testing & all the related documentation familiar with me
• implementation of 5S,Kaizen,and ISO 9001-2008 Document and maintain house keeping & good behavior in department.
2) Gouri Engineering Work –
• Check–Valve parts ( body and ends)
• Management of production planning and control and also quality control.
• Check the material as per po after checking material check the drawing and revision number.
• In planning check the feasibility of the job from as cast product to all machining about to the due date.checking of component by using 7 qc tools format then go through the dispatch activities.
• Follow- up contain all the documentation, parameters, report, mails, qc tools, planning.
• The responsibility of any query regarding job, planning, follow up, quality is totally solved by or also depend on me.
3) ICS India Pvt. Ltd, Pune
• Checked component – Machining, Casting, Fabrication component – Pump casing, Bearing housing, Bell mouth, impellers, Shafts, spiders, Column pipe, Taper pipe, Discharge head, Stag casing, Stater housing, Casing cover.
• During work in ICS there were 5 – 6 venders under my control.
• First of all I use to check quality assurance plan important parameters of the component,purchase order of the component,PO number, flow diagram of the component, Drawing number, revision number, instrument and there calibration reports.
• Going through the visual testing In visual testing I can observed dent, tool mark, steps, burr, blow holes, porosity, shrinkage, gas hole, porous net, welding spatters, and some other parameters.
• Checking in-house check sheet then all the dimension on check sheet and important go
– Nogo gauge, thread gauge, plug gauge.
• In case reward and rejected I take strictly action on vender. 4) Sanjay Engineering Works, Kirloskarwadi
• Checking of shafts, rings, sleeves, etc
• Checking of all documentary regarding component such as po, drawing numbers, revision number, required instruments and there all calibration reports.
• Making check sheet which includes all the dimensional parameter such as depth, height, total, inside
bore outside od. Taking the component on surface table and check all the dimensions HANDLING INSTRUMENT:
RESPONSIBILITIES:
EXTRA SKILLS:
EDUCATION:
PROJECTS:
Dial gauge, Vernier caliper, micrometer, depth gauge, height gauge, inside micrometer, outside micrometer, depth micrometer, slip gauges, go- Nogo gauge, thread gauge, plug gauge analog as well as digital.
• Responsibility of all quality control activities from QAC to final testing of pumps, including performance test & final inspection report regarding dispatch clearance.
• Vendor inspection of fabrication, casting and all machining parts and vender development. Working on ERP system to produce daily inspection reports and testing.
• Maintaining housekeeping and good behavior in the department.
• Implementation of 5s, kaizen, Poka-yoke activity and ISO 9001-2008 documentation.
• Check calibration of all instruments, gauges, micrometer, hardness tester, balancing machining with the help of calibration reports and the standards.
• Responsibility of all quality control activities from QAP PO, tentative inspection report to final testing of pump involving performance test & final inspection report.
• To maintain record of rework, rejection and improvement to reduce rework, rejection.
• Support and lead to continue improvement, problem solving and process improvement activities.
• Performed test –Hydro test, pneumatic test,vibration testing, leak test etc.
• America society of non-destructive testing(ASNT) LEVEL 2 IN Liquid penetration test
(LPT)
,Magnetic Particle Test (MPT),Radiography Test (RT),Ultrasonic Test (UT) in process.
• CERTIFIED WITH WELDING INSPECTOR CSWIP 3.1
• Handling of various instruments (Dial Gauge, Vernier, Inside Micrometer, Outside Micrometer, Plug Gauge, Height Gauge, Go-Nogo, Depth Gauge, Depth Micrometer,).
• Knowledge of computer MS Word, MS Excel, as well as reports, 7 Qc tools, Power Point Presentation, and basic knowledge of solid modeling, CAD, Catia, etc
• Continuously implementing 5s, Kaizen, Poka-Yoke to develop company or the vendor.
• Bachelor Of Mechanical
Engineering (BE) Shivaji university
Kolhapur in 2019 Percentage- 65%
• Diploma In Mechanical Engineering ( DME)
MSBTE 2015
Percentage -74%
• Auxiliary Breaking System
• Function –we attach extra wheels to front axle to avoid wear tear of the front wheels.
• Automatic Upper Dipper By Using LDR
• Function- in regular car there is Manual upper dipper by using the sensors we turn into automaticUpper dipper
PERSONAL DETAILS:
EXTRA CURRICULM ACTIVITIES:
DECLARATION:
• Design And Development Of Mandrill
• Sponsored project by Pushpalata Engineering Kolhapur
• Function – We design a mandrill to increase production rate of the sponsored industry Name : Mr. Akshay Manohar Zende.
Address : A/P-Kirloskarvadi,Tal-Palus,Dist-Sangli.416308 Date Of Birth : 10th December 1996
Marital Status : Single.
Gender : Male.
Contact No : +919*********.
• Participated in Poster Presentation in AVISJKAR 2K14.
• Participated in national level Short Term Workshop AUTOSPARK 2K15 sponsored by IIT Madras.
• Participated in treasure hunt program at RIT Islampur. Consider myself familiar with Mechanical Engineering aspects. I am also confident of my ability to work in a team. I hear by declare that the information stated above it is true to the best of my knowledge.
Date :
Place:
Signature
(Mr.akshay mahanor zende)