Post Job Free

Resume

Sign in

Foster Wheeler Electrical Engineer

Location:
El Ibrahimeyah Bahary, Alexandria, 21, Egypt
Posted:
March 18, 2022

Contact this candidate

Resume:

ADEL A. FAYEK – Projects Sr. Superintendent

Contact No. +201*-******** Egypt

Pg.1 4

CORE COMPETENCIES

Professional Profile :

Total Work Experience in Oil & Gas and Petrochemicals fields: 32 yrs.

Sr. Superintendent / Lead Engineer /Site Technical Coordinator during project’s phases (Feasibility studies, FEED, EPC, Commissioning, Start-Up and Hand over) for ADNOC’s MEGA projects at Ruwais Industrial City – UAE (Borouge1, Borouge1expansion, Borouge2 & Borouge3 projects).

Reviewing, commenting, approving all project’s electrical deliverables of Borouge1 expansions, Borouge2 project EPC, Borouge3 project.

Supervising as (PMT/PMC Lead Engineer/ Superintendent) all FEED & EPC design and constructions electrical activities of Borouge1 expansions, Borouge2 and Borouge3 phases (2002 ~ 2013).

Monitor project’s schedule (design & constructions) for critical paths, milestones and LDMS

Liaise as PMT/PMC Lead Superintendent with several EPC’s of Borouge projects (TCM-Milan, TR- Madrid, LINDE – Munich, FLOUR – Netherland, Bechtel – UK, Samsung & Hyundai – Seoul ) for proper actions and schedule recovery plans -as deemed necessary- and to strictly comply with project’s HSE, specifications, scope and standards .

Reviewing, advising and approving EPC’s Concession Requests (CR) as deemed necessary

Reviewing, advising and approving project’s positive / negative Change Trend Notice ( CTN )

Fast acting on feedbacks required for EPC’s Technical Quires (TQ).

Reviewing, updating, advising for improvements and approving Sub-Contractors Method Statements (MS).

Reviewing,advising and approving EPC’s and its sub-contractors manning levels during project phases

Coordinating and efficiently participating in course of actions of high level interfaces, problems solving scheme and de-bottle neck approaches among 5 EPC’s and several Sub-Contractors of Borouge2 & Borouge3 projects on construction’s predicted problems that may create kind of threat on project’s milestones, schedule and budget (remarkable achievements were recorded ..!)

Review project’s constructability plans of critical paths and advising EPC’s for improvements ((remarkable achievements were recorded in this regards.)

Technical & Commercial evaluations for project’s bids, EPC tender clarifications and tender bulletins.

Expert in implementations of Shell DEP codes (ONSHORE & OFFSHORE)

Expert in implementations of ADNOC & ARAMCO codes and standards during FEED & EPC

Expert in IEC, CENELEC, NEC, NEMA, IEEE, ATEX, NFPA & API Standards EMPLOYER POST FROM TO

PANSOINCO - ITALY Consultant August-2021 Present

Middle-East-Oil

Refinery (MIDOR)

Alexandria

Manager-Technical

Supports

(Electrical)

January

2014

October-2020

ADNOC- Borouge -

UAE

Project Sr.

Superintendent

May-2000 15 Oct.2013

EQUATE CO.- Kuwait Maintenance

Electrical Engineer

Sept.-1996 May 2000

SAFRA CO.- KSA Maintenance Sr.

Electrical Engineer.

April-1990 Aug.-1996

EPTCO-Egyptian

Petrochemicals

Company

Electrical

Engineer-

Maintenance

Jan.-88 April-1990

ADEL A. FAYEK – Projects Sr. Superintendent

Contact No. +201*-******** Egypt

Pg.2 4

Expert in HAZOP, SIL reviews, SAFOP, SAFAN, SYSOP & QRA studies

Holds excellent interpersonal, communication & organizational skills with abilities in team management, self- motivated and can smoothly work independently or as part of multidiscipline team Remarkable achievements during Borouge projects :- A- Borouge1 – Expansion 2003, commissioned and Tied-IN with Borouge1 RUNNING units ON-TIME and below budget

B- High level interfaces as Borouge2 Lead Engineer between BOROUGE2 EPC and TAKREER GUP Operations on design, constructions and ONLINE Tie-Ins of GUP 132KV GIS bus bar expansions of TAKREER (GUP) main power station that feeding power to all ADNOC’s operating companies of Ruwais industrial area as well as residential area ( Ruwais Housing Complex), Tie-Ins done ON TIME by ABB without any power outage or power upsets to the facilities to accommodate NEW 132KV power (FOUR FEEDERs) of Borouge2 project

C- Leading as Site Coordinator the process Tie-Ins between Borouge1 & Borouge2 utilities. D- Review and recommending different paths of Borouge2 Control Room constructability scope for Tie-Ins with Borouge1 Control Room, Tie-Ins including DCS migrations scope were made AHEAD of Schedule with certificate of honor to my name from owners (ADNOC-Borouge) E- Borouge2 Site Coordinator(FEED phase), leading and managing all technical interfaces between (FW- PMC) / Project Management Team (PMT) & Ruwais Site, FEED was running at PMC home office in London (Shinfield Park – Reading – Berkshire).

F- Recommend and advise the revised scope of Borouge3 220 KV- FOUR Power feeder (2500 mm2 each) to Borouge3 EPC (Hunyadi) the revision of constructability plan could achieve ON-TIME Energisation plan of Borouge3 220KV substations and to cater power required for pre-commissioning and commissioning of 25 substations NEW complex.

G- Studying, reviewing, advising and approving the Concession Request (CR ) and its relevant Negative Change Trend Notice (Negative -CTN) of Borouge3 220KV cable of main power feeder (XLPE X Armored 2500mm2 X 5500 mtr.) this action could SAVE Borouge3 project’s master plan of commissioning 220KV power on 15/7/2012, further, an additional negative CTN of $3M pay back to project’s budget was raised by PMT/PMC.

Detailed Work Experience

1- MIDOR Refinery –Technical Support Manager- ELECTRICAL Managing Electrical interfaces between project expansion EPC (Technip- Italy), Operations & Maintenance teams of MIDOR Refinery including planning of >15 partial and major SHUTDOWNs for expansion’s TIE-INS during the period 2021~ 2023.

Technical supports and executions for MIDOR Refinery (IN HOUSE) modifications. 2- BOROUGE Polymers –Sr.Superintendent-Electrical. The complex considered as one of ADNOC’s largest petrochemical plants in GCC, Borouge is a joint venture polymer project between ADNOC and BOREALIS, the investment amount currently exceeding $20B for Boroug1, Borouge2 & Borouge3.

Borouge1: 600 ktpa Ethylene, (PE1 1x & PE2- 2X355 ) ktpa Borstar Polyethylene- 1998~2002

Borouge2: 1500 ktpa Ethylene, PE3–1X540 kta – PP1/2 (2X400Ktpa) – OCU1X25 Ktpa– 2003~2010

Borouge3: 1500 ktpa Ethylene, PE4/5( 2 X 540 ) ktpa – PP3/4 ( 1X480 + 1X 428) ktpa- 2010~2014 ADEL A. FAYEK – Projects Sr. Superintendent

Contact No. +201*-******** Egypt

Pg.3 4

Detailed work experience with Borouge ( May-2000 till 15 October 2013 )

Senior E&I Superintendent (Ruwais UAE – 04/2012 ~ 15/10/2013) : Leading team of 10 Engineers & Team leaders during project’s Field Engineering & Constructions with full integrity with Commissioning and Startup teams.

Lead E&I Engineer (Borouge3 project - Seoul 08/2010 ~ 04/2012 ) : Lead E & I Engineer during Engineering phase at Borouge3 Home Office - Seoul – South Korea with HYUNDAI Engineering & Constructions (PMC is Bechtel-UK), leading team of 20 Engineers and Team Leaders of multidiscipline skills ( Electrical, Instrument, Telecomm. & Constructions)

Electrical Superintendent ( Ruwais – UAE, 08/2008 ~ 07/2010) : Borouge2 E & I Superintendent during Project’s Field Engineering while supporting Construction, Commissioning & Startup phase.

Senior Electrical Engineer ( Madrid – Spain – 05/2007~ 09/2008) : PMT Borouge2 Design Lead E& I Engineer in Madrid – Spain Borouge2 Home Office with Tecnicas Runidas

(PMC was Foster Wheeler- UK).

Project’s Site Coordinator ( Ruwais –UAE – 09/2005 ~ 04/2007) : Project’s Site Coordinator for Borouge2 project (Feasibility by Worley Parsons and FEED studies by Foster Wheeler-UK).

Project’s Site Coordinator (Milan – Italy 11/2003~ 09/2005) : Project’s Site coordinator for Borouge1 expansion (STEP II ) PMC & EPC was TCM-Italy

Maintenance & Reliability Electrical Engineer (05/2000~ 10/2003) : Commissioning, Startup, Maintenance and Reliability Sr. Electrical Engineer for Borouge1 project. 3- EQUATE (16-9-1996 to 1st May 2000)

EQUATE complex consists of FIVE main plants {Ethylene (650K MT/yr.), Polyethylene (450K MT/yr.), Ethylene Glycol (300K MT/yr.), Polypropylene 100K MT/Yr. and Utility} Joined EQUATE during last phase of engineering (field Engineering) with TOYO – Japan, then was fully engaged with Construction, Pre commissioning, Commissioning and plant’s start-up with the capacity of (Electrical & Telecomm. Engineer).Project was successfully commissioned and started up ON TIME within approved budget. 4- SAUDI FRANCE HYDROCARBONS REFINERY (SAFRA CO): - (9/4/1990 to 8/8/1996) SAFRA petrochemical complex (Saudi France Refinery) is JV project between TOTAL and Saudi private sector

(Xenel group),complex is located in YANBU- KSA, SAFRA is leading producer and distributor of (150K MT/yr.) of petrochemicals solvents like( Xylene, Toluene, C9,WSO, …etc.) . Worked in the sole capacity of Refinery Senior Electrical &Telecomm. Engineer during Engineering, Pre- commissioning, Commissioning, Startups and Tests Run. 5- Egyptian Petrochemicals Co. (EPTCO):

The Egyptian Petrochemicals Complex (EPTCO) is located at Alexandria – Egypt Worked as Maintenance Electrical Engineer, I was involved in the construction, commissioning, start up, test runs, maintenance and operation for Ethylene unit (offshore platform) & PVC unit, the complex contain of FOUR process units (Chlorine, VCM, PVC and Utility).

ADEL A. FAYEK – Projects Sr. Superintendent

Contact No. +201*-******** Egypt

Pg.4 4

1. Full Name: Adel Ahmed Fayek

2. Date of Birth: 21 Oct. 1960

3. Nationality: Egyptian

4. Marital status: Married

5. Passport No: A11531751

6. Direct Contact No: +201*-******** - Egypt



Contact this candidate