Post Job Free

Resume

Sign in

North Slope Westlake Chemical

Location:
Burkeville, TX, 75932
Posted:
March 17, 2022

Contact this candidate

Resume:

Billy W. Craft II

**** ****** **.-**** ****** ***39 FM 1414-Burkeville TX

Home: 409-***-****

Cell: 409-***-****

DESIGNER- I&E, PIPING

Olson Engineering (04/2012-Present)

Bridge City Texas / Arlanxeo/Lanxess. Rubber Plant / Orange Texas

Supervisor, Mike Olson/Marcus Mcgee/Jim Francis

Duties: Per direction from Plant Engineers, I&E Design, In Plant, Field Verification of Control System and Terminations in EPR/Keltan Unit.. Wiring Diagrams, P&ID’s, Loop Sheets…Creating and Modifying Documentation as Required…Updating and Revising existing to current conditions…Mostly As-Builting…Design as Required…Drafting …..Microstation and/or Autocad Software..Webtop Documentum, Intellidox…Document Management Software

S&B/ Design Quest / Recon Engineering (Eastman Chemical/Westlake Chemical) (1/2011-4/2012)

Longview TX

Contact: Yes

Supervisors: Steve Girdner/ Kelly Sternadel/ Jeff Lowell/ Michael Womack/Kenneth King

Field verification/Markup of Mechanical Piping, E&I (DCS) of P&ID’S at PE-1 & Epolene Unit. Process Hazard Analyses related Verifications (Pre-Audit Verifications) / Westlake Chemical, Also Eastman Chem. Bld. 1.. Assisted in Piping Department..As Needed

NANA/Colt - Worley Parsons (04/2008-12/2010)

Prudhoe Bay Alaska

Supervisor: Wayne Carlson/Jeff Hamilton

Duties: E&I Design. Assist BP engineering with preparation of all disciplines of Well Tie In Packages for new wells in the BP north slope oilfield. Work with Well Tie in group, O&M on As-Builting instrumentation/electrical, Piping & structural drawings in existing facilities located on the North slope. Assure documentation, As-Builting complete & accurate per BP Standards for all applicable projects. Tagging, Data Sheet, Master Equipment List coordination/verification. Work with BP drawing integration system, (Documentum/EDDI Software) for organized handling of drawings/documentation from Design phase thru as-builting. ACAD 2007 RasterDesign, BlueBeam. Field verification.

Olson Engineering (06/2007-04/2008)

Bridge City Texas

Supervisor, Mike Olson

Duties: I&E Design, Worked one on one with Engineer/Owner preparing complete E&I packages for Total, Valero Refineries, Temple Inland Paper and Mead Westvaco Paper Mills in southeast Texas area. Worked other disciplines as required.

URS Corp. (06/14/2006 - 06/2007)

Houston Texas, United States

Supervisor: Carolyn Lindsey/Doug Shaw Contact: Yes

Duties: I&E Design/ Piping Design/Drafting, Industrial Design,

On the job training with 3D Bentley Autoplant, and other Autocad compatible software.

Exposure/Experience with 3D. Generally piping discipline, but provide assistance as needed to other electrical/instrumentation disciplines.

Assist in other duties as assigned.

URS Corp. Project Manager, Quality Assurance Rep. 02/01/2006 – 06/14/06

Anchorage, Alaska United States

Supervisor: Craig Lance 907-***-****; Contact: Yes

Duties: QAR position at New Bassett Project Office, Fairbanks Alaska. Contract to Corp of Engineers, Alaska District.

Verify and Document that the contract documents and specs are complied too.

Investigate and assist in resolving code issues that occur in daily construction practice, generally electrical, but provide assistance as needed to other disciplines.

Assist in Verification of pay estimate request as received from the contractor. Other duties as assigned

Eagle Pro Engineering, E&I Designer 08/01/2005 - 1/30/2006

Beaumont, Texas

Duties: Created electrical/instrumentation design package for petro industry projects, also electrical estimating of industrial type projects, both conceptual estimates and detailed construction, as required to meet contract requirements.

MIC/CCS Joint Venture, Project Manager 9/2004 - 6/2005

Fort Polk, LA US Hours per week: 40

Research Quantity info, Assist in Preparation of Detailed Cost Estimates, (RS Means Software).

Prepare Schedules of Government Job Order Contract Projects & apply Schedule of Values to tasks, from estimates, along with previous practical experience.

Assist in Budgeting Delivery Order Money to Sub-contractors as required.

Apply For Required Permits.

Review & submit Info on required equipment/materials for DPW approval, coordinate proposals, estimates, schedules, and design criteria between DPW Project Managers and our Sub-contractors on site at Fort Polk, in order to accomplish a cost efficient, quality product to our customer, the United States Government.

Assisted with Quality Control of Projects that was assigned to other Management Personnel.

Assist DPW Project Managers and our Sub contractors with establishing, site locations/Elevations from GPS Info and other Survey info

Assist DPW Project Managers and our sub contractors with Electrical, Piping, Civil and Structural Steel Design Sketches, and site plan layouts, as needed.

My job also required Update and Reproduction of those drawings, Upon Completion of a Project, to As-Builts, either manually or using Autocad, and Transmitting to DPW Project Manager in Microstation Format, if applicable.

Other duties as assigned.

URS Eng. Corp. E&I / Piping Drafting/Design Boise Cascade Paper Mill 4/1998 - 9/2004

Lake Charles, LA US Hours per week: 40

Prepare Sketches / Drawings Packages Using AutoCAD 14-2002

Field Verification of Civil, Structural, Electrical, Piping, & Control Systems / P&ID’s

Exposure To DCS and PLC Systems/ Piping Specifications / Process Safety Management System

Prepare Complete Design Package With Minimum Guidance of Lead Designers

Work Closely With Document Control, Client Staff, On Proper Transmittal, Processing of Drawing Packages and other Necessary Documentation

Matrix Engineering / A&B Construction, BASF Material Expedition 1/1998 - 4/1998 Beaumont, TX US Salary: 19 USD Per Hour Hours per week: 60

Coordinated Piping, Electrical, and Instrumentation equipment installation per Spec./ P&ID’s

Updated job progress per Drawings / Man hour Reports

Worked directly with Engineering and Construction on proper placement of Piping/Instrumentation per BASF Spec.

(Contact Supervisor: Yes, Supervisor's Name: J.E. Powell, Supervisor's Phone: 409-***-****)

NSC Corp Industrial Capital & Maintenance Project Technician / Boise Cascade Paper Mill 8/1994 - 4/1998 Deridder, LA US Hours per week: 40-60

General Construction duties required. Assisted In Estimating Time And Materials For Piping, Insulation & Scaffold Projects as required.

1981-1992 (Refinery, Schools, Residential & Commercial, Industrial Environments, including Nuclear Power)

H.B Zachary Electrical Tech IV/ E&I Tech 3/1994 - 8/1994 Deridder, LA US

Assisted Journeyman Electricians In Various Aspects Of The Electrical Trade

Exposure To Instrument, Cable, Conduit, Cable Tray, MCC Installation

College/University

Lamar Institute of Technology (01/01/1992 - 12/15/1993)

Beaumont, Texas United States

Degree: Associate Degree Major: Computer Draft & Design

GPA: 3.5 Semester Hours: 72 cum laude

Relevant Coursework, Licensures and Certifications: Vocational - 12/1985

Sowella Tech Lake Charles, LA US

Mechanical Systems, Industrial Applications. Certified Asbestos Tech. Certified Asbestos Inspector. Interpretation of Technical Drawings Course work

Relevant Coursework, Licensures and Certifications:

1991 - 1993 Lamar University Institute of Technology, Beaumont, Tx.

Associate in Applied Science of Computer Drafting Technology

1Electrical & Instrumentation Drafting & Design (AutoCAD)

2Piping, Structural Steel, and Civil Drafting & Design (AutoCAD)

TRAINING - JOB RELATED

July 2000 Commint Technical Services, Inc.

Primavera Project Planner, Certification Course Version 3.0

1Planning and Scheduling With P3 (Course601)

2Resource and Cost Analysis With P3 (Course 602)

3Managing Project Data With P3 (Course 603)

2000 McNeese State University, Lake Charles, La.

Primavera Project Planner, Professional Development Course

1Continuing Education Course (Introduction to P3)

2001 Lamar Salter Vo-Tech, Leesville La.

1999 National Electric Code, Certification Course

1Understanding The National Electric Code

2Continuing Education Course

2001(September) Impact Training Services, Bloomfield Kentucky

Electrical Control Circuits

1Maintenance and Troubleshooting

2One Day Seminar

2001(August) URS Corp. Rene Borrel, P.E.

Life Safety Code (NFPA 101)

2National Fire Protection Code

3Continuing Education Course

2005(March) Corp of Engineers, Quality Control Management

U.S. Army Corp of Engineers Office Ft. Sam Houston, TX

Mr. Johnston (Course Director)

2006(June) Bentley Autoplant (Previously Rebis), 3D Modeling, / FlexCad

URS, On Job Experience Houston URS office

2008(October) Fundamentals of Process Instrumentation (Job Training Systems, Inc., Home Study Course)



Contact this candidate