Post Job Free
Sign in

Inspection Engineer Civil Engineering

Location:
Hyderabad, Telangana, India
Posted:
March 15, 2022

Contact this candidate

Resume:

Client Name

Project

Page *

Name Full Mohammed Abdul Aleem Siddiqui

Proposed Position: senior civil inspection Engineer DATE OF BIRTH

** **** ****

Contact India :0091-784-***-****

Contact India :0091-970-***-****

Contact: *********@*****.***

********************@*****.**.**

NATIONALITY

Indian

Driving license: INDIA/UAE/KSA

CIVIL STATUS

married

EDUCATION

Diploma in Civil Engineering Government of Karnataka department of technical Education Bangalore -01 1989

B. tech in Civil Engineering Karnataka state open university Manasagangotri Mysore 570006 LANGUAGES

English

Arabic/Telagu/Urdu

GEOGRAPHIC EXPERIENCE

INDIA

UAE/KSA/India

KEY QUALIFICATIONS

Diploma in civil Engineering

B. tech in Civil Engineering Karnataka state open university Mysore 570006. CAREER HIGHLIGHTS AND EXPERIENCE

Has over 30 years of experience in, supervision & construction and project management. PROJECT EXPERIENCE

January 2013 – May 2020 Hill international & AECOM joint venture Project Name, MTB Abu Dhabi international Airport inspection Engineer Responsibilities/Tasks:

Responsibilities/Tasks: As per approved drawing. Approved method of statement,abudhabi municipality regulatory, to inspect the civil works foundations footing Rebar,RCC slabs & steel structure after structure finished started finishing inspections,block works, plaster, painting

,floor tile,ceiling, cladding outside, material inspection with approved sample, carry out witness all tests

Client Name

Project

Page 2

September 2009- January 2013 Hill international

Project Name, Gate tower 3-8 Shams Abu Dhabi project al Reem island Abu Dhabi inspection Engineer

Responsibilities/Tasks:

As per approved drawing. Approved method of statement,abudhabi municipality regulatory, to inspect the civil works foundations footing Rebar,RCC slabs, after structure finished started finishing inspections,block works, plaster, painting,floor tile,ceiling, cladding outside, during same period I worked as material inspections as per approved drawing, approved method of statement check the materials Verifying with approved sample and mockup

January 2007 – July 2009 Al Quadra project management & hill international joint venture Project Name, tower 1-2 Reem island Abu Dhabi inspection Engineer Project involved working on a podium comprising two levels of car park, a three-level mall, and six five-level office buildings.

Responsibilities/Tasks:

As per approved drawing. Approved method of statement,abudhabi municipality regulatory, to inspect the civil works foundations footing Rebar,RCC slabs, after structure finished started finishing inspections,block works, plaster, painting

,floor tile,ceiling, cladding outside, during same period I worked as material inspections as per approved drawing, approved method of statement check the materials Verifying with approved sample and mock-up

Used appropriate verification techniques to manage changes in project scope, schedule, and costs

April 2005-july 2007 Engineer Adnan Saffarini Dubai Project Name G+47 residential towers parking jumera lake tower Dubai Responsibilities/Tasks:

As per approved drawing. Approved method of statement,abudhabi municipality regulatory, to inspect the civil works and piling works, raft foundations footing Rebar,RCC slabs, post tension slab,etc to inspect the material as per mockup approval, floor tile,ceiling, cladding outside, material inspection with approved sample, carry out witness all tests August 1997-Feberuary 2005- Present Andhra Pradesh HOUSING Board cooperation Mahbubnagar India

Responsibilities/Tasks:

As per approved drawing. Approved method of statement,abudhabi municipality regulatory, 200 villa construction project, to check the work with project engineer to prepare and submit Work inspection request, as per approved method of statement and drawing to check the material after delivery from the supplier

August 1996-1997 - Sun of Desert building maintenance Dubai Project Name, satwa school building Dubai

Responsibilities/Tasks: As per approved drawing. Approved method of statement, Dubai municipality regulatory execute the project work plaster tile fixing /painting /supply & fix 1992-july 1996 March Al Sarrif contractor/al suwayyah contractor Project Name prince suleman shopping complex batha Riyadh/samba car park ministry road Riyadh /Saudi American bank Makah KSA

Responsibilities/Tasks: As per approved drawing & project specification execute the structure work & finishing work

Client Name

Project

Page 3

Projects details:

Gate Tower 3-8, Reem island Abu Dhabi, 3 No’s Tower (B3+63)+Podium Project Cost: A.E.D 7.0 Billion

Worked with: Al Qudra project management Abu Dhabi

Shams Abu Dhabi Reem island (tower 1, B3+G.f+74)(tower 2, B3+64)

(Podium B3+5 car parking) value AED. 2.3 billion.

Worked with: Hill international Abu Dhabi

Tower at Jumera Lake Towers (G + 4B + Service + Health Club + 33 Floors) Value AED.150 Millions

Worked with: Engineer Adnan Saffarini Dubai.

Dubai Pearl Towers A6 and A7 (G + Service + Health Club + 47 Floors) Value AED.600 Millions

Worked with: Engineer Adnan Saffarini Dubai.

Dubai Labor Office Dubai/satwa school building for floor tiles in Dubai worked with: sun of desert Dubai

Saudi American Bank Makah.K.S.A. Worked with:

Prince Suleiman shopping mall Batha Riyadh, K.S.A (G+33) 24 Story Towers and Posium.400 million riyals Al Sarrif contracting Riyadh K.S.A

Saudi American bank. Riyadh. KSA worked with Al suwayyah Contracting K.S.A

Saudi Holland Bank, Makah. K.S.A. worked with Al suwayyah Contracting K.S.A

APHB Colony, Mahbubnagar. India

AREAS OF EXPERTISE IN FINISHING

Finishing work involved, screed test/tile layout tile fixing for wall &floor /installation framing

& ceiling/dry wall fire rated not fire rate/paints/wall cladding internal & external/TPS installation/door installation/snag & DE snag/Mockup inspection/Material inspection.

As per drawing to follow block work, types of block to be used, to check the block layout, test of block as per site requirement, to check the plumb of block wall, joints mortar filling and mixing as per requirement,

To check the plaster work thickness and verticality as per requirement,as per approved materials to be used,

To check the tile work types of mortar, fixing, joints requirement as per approved latest drawing and as per approved materials,

To check the water proofing works in wet area and leak test to be conduct.

To check the marble granite fixing as per specification as per quality requirement as per approved drawings, spacing size & quality laying &fixing

To check the ceiling work type of ceiling quality of ceiling as per approved drawings and as per specification,

To check the paint work type of paint to be used as per approved drawing and specification, type of work quality and finishing of surface and finishing of paint, thickness DFT

To follow all finishing work and test should be conducted as per requirement.

Closely monitor site activities to ensure quality of work is in compliance with contract requirements, good construction practice, only approved materials are used, compliance with shop drawings.

Client Name

Project

Page 4

Carryout all planned site inspection as per the intervention points marked in the relevant ITP

Inspection status shall be recorded In the ITR and any relevant check sheet as per the approved outstanding items shall be verified prior to closing the ITR.

AREAS OF EXPERTISE STRUCTURE

Inspection of Excavation's for foundations at different levels, to check the coordinates with Surveyor, drilling for pile installation of steel case as per structural drawings, inspection of coordinates for piling, raft foundation, and all structural works.

Coordinating with testing Laboratories for inspection of quality. Conducting piles test

(Dynamic and Static Load) as per design requirements etc.

Pile head treatment with approved Material,inspection rebar for raft foundation, and monitoring Concreting works maintain slump & temperature &Ambient temperature under approved required specification, construction of Precast retaking walls and Cast and cite walls, Ensure Contractor apply approve methods of statement and approved shop drawings.

To attend laboratory for concrete test, steel test, verify test report with project requirement,

Allocating the work to different supervisors for different sites, weekly meeting with clients and higher management.

Prepared maintenance system day to day work schedules, preventive maintenance schedules, plan, develop, implement and assure all work as per schedule.

Material submittals and approvals with Consultants, Responsible to execute the construction as per the approved shop drawings. Prepared and maintain daily, weekly, and monthly progress reports.

Trained the staff to work in safety procedures, quality control etc.

Negotiation with the suppliers for raw materials procurement and prepared the approved supplier's list for the company.

Monitor regularly ongoing activities of the project and implement corrective measures if delays are deducted or foreseen.

Maintain project cost control and analyses the variance against budget.

Establish project strategy during the implementation / care phase and develop plans to coordinate activities of project team and all internal and external

To check the NDT witness with third party

Installation of metal deck sheet and roof seam sheet laying and installation as per

Approved drawings and approved MS

As per approved material approved Method of statement Approved ITP to check the

Structural steel bolt tightening as per required torque.to check the fire proofing paint as per required DFT



Contact this candidate