Post Job Free

Resume

Sign in

Waste Plant Shell Oil

Location:
Cairo, Cairo Governorate, Egypt
Posted:
March 13, 2022

Contact this candidate

Resume:

KARAM HANNA

Professional Project Manager

PROFILE

Professional Project Management,

with Twenty-Nine years post-

graduation experience in

Construction Field covering Civil,

Steel Structure, Piping,

Electromechanical, and Equipment

installation as project Manager and

Planner. Which has given me on-the-

job knowledge, as well as a sense of

where the industry has been and

where it is going in the future. I have

the kind of technical skills that only

come from being a Project Manager

for several years. I can slide

seamlessly into this role and start

hitting goals on my very first day.

CONTACT

PHONE:

+20-120-***-****

+971-**-***-****

+968-*-***-****

WEBSITE:

LinkedIn

http://www.linkedin.com/in/karam-hanna-

a14141b/

EMAIL:

adqg7p@r.postjobfree.com

ADDRESS

8 Al Gabarti Street

Heliopolis

Cairo, Egypt

LANGUADGE

English, French & Arabic

DRIVING LICENSES

U.A.E. Light Motor Vehicle License

Holder, 2005

Egyptian Light Motor Vehicle License

Holder, 1989.

WORK EXPERIENCE

November 2007– Till Now

Dar Al Karamah Bldg. Cont. L.L.C.

Project Manager

Establish and Founder of Dar Al Karamah Bldg. Cont. L.L.C. Sharjah & Al Ain, United Arab Emirates

Formulating and successfully implementing company policy.

Directing strategy towards the profitable growth and operation of the company

Developing strategic operating plans that reflect the longer-term objectives and priorities

Putting in place adequate operational planning and financial control systems.

Ensuring that the operating objectives and performance standards are understood and owned by the management and other employees.

Closely monitoring the operating and financial results against plans and budgets.

Taking remedial action where necessary.

Maintaining the operational performance of the company.

Representing the company to major customers and professional associations.

Developing time Schedule and Cost Estimation for all Projects Projects Name:-

1. The lining of Cell 1A –Sajaa –Landfill at Sharjah. ( 12 Million Dirham ) 2. Internal roads for Sajaa-landfill. ( 4 Million Dirham Project ) 3. Al Sajaa Landfill Mosque. ( 3.5 Million Dirham Project ) 4. Hard Landscaping and External works at Al Sajaa Landfill. 5. Waste Water Treatment Pond at Al Ain Compost Plant. (1.5 Million ) 6. Plastic & Recycling Plant and Mixing & Packing Plant at Al Ain Compost Plant. ( 15 Million Dirham Project ) Turnkey Project. November 2005– October 2007

Polyco L.T.D. & Ginco Steel L.L.C. G.V.

Project Manager

Sharjah, United Arab Emirates

Projects Name:-

1. Construct Commissioning and Operate Concrete demolishing waste plant at Al Sajaa landfill-Sharjah

2. Construct Commissioning and Operate National Query at Al Fujairah 3. Warehouses for DuCab Factory at Jabal Ali and Abu Dhabi 4. Construct, Commissioning, and Operate Municipality Solid Waste Plant at Al Ain – Abu Dhabi

5. Warehouses for HTWOOD at Jabal Ali

6. Steel Platform for Basement no. 5, Dubai Airport – Terminal 3 December 2004– October 2005

Aloha Construction Company.

Project Manager

Dubai, United Arab Emirates.

Project Name:-

Complex Villa for Sheikh Hazzaa Bin Zayed at Jumairah

Installation of 22 Computerized Dancing Fountains, Plus 3 Pump rooms for Fountain and Irrigation.

Irrigation system for an area of 20000 m2

Hard Landscaping and Tiling for 20000 m2 using Sand Stone, Slates, and Granite Tiles.

Client:-

Sheikh Hazzaa Bin Zayed

April 2003– October 2004

Orascom – FLSmidth Consortium

Installation Engineer

Welaya de M’Sila, Algeria

Project Name:-

Algeria Cement Factory Line I.

A Project of 250 Million U.S. Dollars.

Pre-assembly and installation of Steel structure and Mechanical parts for all Conveyors, Bag Filters, and Transfer Towers, Including Lifting calculation for heavy Machines and Equipment.

The project consists of 22 Belt Conveyors, 1 Chain conveyor, 23 Bag Filter, 23 Rotary Suction Fans, and 3 Transfer towers with a total weight of 1343.00 Ton approx...

Client:-

A.C.C. Algeria Cement Company.

July 2002– March 2003

Orascom Polysius Consortium

Installation Engineer

Al Amreyah, Alexandria, Egypt

Project Name:

Amreyah Cement Factory Line III.

A Project of 531 Million L.E.

Pre-assembly and installation of Steel structure and Mechanical parts for all Conveyors, Bag Filters, and Transfer Towers, Including Lifting calculation for heavy Machines and Equipment.

The project consists of 15 Belt Conveyors, 2 Chain conveyors, 17 Bag Filters, 17 Rotary Suction Fans, and 4 Transfer towers with a Total Weight of 1145.00 Ton approx...

Client:-

A.C.C.C. Amreyah Cimpor Cement Company.

June 2002– June 2002

ORASCOM Construction Industrial (OCI)

Installation Engineer

Damietta, Egypt

Project Name:-

Egypt LNG Project at Damietta Port, Egypt

Pre-assembly and Install a 26m * 60m Steel Structure Insulated Fibber Glass Warehouse. With a total weight of 70.00 Ton, within a 1- month mission, under a height level of safety.

Client:-

Damietta Port (Government)

February 2002– May 2002

ORASCOM Construction Industrial (OCI), Subcontractor from BECHTEL Co. Installation Engineer

Al Burullus, Kafr Al Sheikh, Egypt.

Project Name:-

DMC Engineering Consortium, a project for El-Burullus Co. end user.

Pre-assembly and Install 1050.00 Ton of Pipe Rack within 3 months, under height level of safety, developing a good reputation for Orascom, to help for winning a new contract for the new project of DMC line III. Client:-

Al-Burullus Company. (Government)

December 1998– January 2002

ORASCOM – Polysius Consortium

Installation Engineer

Suez, Egypt

Project Name:-

Egyptian Cement Factory Line II & III and IV

A Project of 1240 Million LE

Pre-assembly and install Clinker storage Steel structure Building, a 489.00 Ton of Steel Structure approx...

It is Conical Dome Steel Structure Building, from 65m Base diameters to 15m Top diameters, and 29m Height, using a 29m height temporary support.

Pre-assembly and installation of Steel structure and Mechanical parts for all Conveyors, Bag Filters, and Transfer Towers, Including Lifting calculation for heavy Machines and Equipment.

Projects consist of 59 Belt Conveyors, 8 Chain conveyors, 7 Transfer towers, 67 Bag Filters, and 67 Rotary Suction Fans. With a total weight of 3930.00 Ton approx.

Client:

E.C.C. Egyptian Cement company

January 1997– November 1998

ORASCOM – Polysius Consortium

Installation engineer

Suez, Egypt

Project Name:-

Suez Cement Company Line II.

A Project of 490 Million L.E.

Pre-assembly and installation of Steel structure and Mechanical parts for all Conveyors, Bag Filters, and Transfer Towers, Including Lifting calculation for heavy Machines and Equipment.

The project consists of 19 Belt Conveyors, 4 Chain conveyors, 15 Transfer towers, 23 Bag Filters, and 23 Rotary Suction Fans, with a total weight of 1439.000 Ton approx.

Client:-

S.C.C. Suez Cement company

November 1995– December 1996

ALLAM – ORASCOM J.V. & UHDE, GMBH Company

Installation Engineer

Al Max, Alexandria, Egypt

Project Name:

Rehabilitation of Misr Chemicals Chloral Kali Factory. A Project of 39 Million L.E.

Determination of equipment location, orientation, and level.

Classifying and dividing the hydro test loops for 2500 pipelines.

Determination of the identification marking, symbolizing, lettering flow direction, and the color-coded band of pipelines Fluids Flow. Client:-

Misr Chemical Chloral Kali Factory.

December 1994– October 1995

ORASCOM & Day and Zimar Man Inc. /U.S. Army Corps of Engineering Installation Engineer

Abu Zaabal, Al Qalyubeya, Egypt

Project Name:

Chrome Planting Facility PHASE II, Factory 100.

A Project of 22 Million U.S Dollars.

Determination of equipment location, orientation, and level.

Preparing Pipelines Fabrication shop drawing.

Classifying and dividing the hydro test loops for 550 pipelines.

Determination of the identification marking, symbolizing, lettering, flow direction, and Color-Code band of pipelines Fluids Flow.

Preparing as-built drawings and data collection from the site, and managing a full Team of Draftsmen to finalize it. Client: -

Egyptian Army.

June 1993– November 1994

ORASCOM Construction Industrial (OCI)

Civil & Mechanical Surveyor

6th of October City, Giza, Great Cairo, Egypt

Project Name:-

Shell Lube Oil factory.

A Project of 11 Million U.S. Dollars

Supervising carpentry, rebar, and concrete works.

Determination of equipment location, orientation, and level.

Supervising the fabrication of pipelines at the site.

Classifying and dividing the hydro test loops for 500 pipelines.

Determination of the identification, marking, symbolizing, lettering flow direction, and the color-code band of pipelines Fluids Flow.

Preparing as-built drawings and data collection from the site, and managing a full Draftsmen Team to finalize it. Client:-

Shell Oil Company.

January 1992– May 1993

CONTRACK INTERNATIONAL INC. & MK, Morrison Knudsen Corporation Civil Surveyor

Nazlet Al Samman, Giza, Great Cairo, Egypt

Project name:-

CHEOPS PUMPING STATION.

A Project of 12 Million U.S. Dollars.

Surveying Civil Work

Determination Location, Orientation, and Level for Foundations.

Supervising Carpentry, Rebar, and Concrete Work.

Determination Location, Orientation, and Level for Machinery and Equipment. Client:-

Egyptian Government

August 1990– December 1991

Mokhtar Ibrahim Construction Co.

Road Surveyor

6th of October City, Giza, Great Cairo, Egypt

Determination Location, Orientation, and Level for Roads SKILLS

Computer Skills:

Linux, Kali Linux, Windows, M.S. Office, M.S. Project, Primavera P6, AutoCAD, Internet Searching, E-Mail, Network Connections (hardware, Software), and very good understanding for PC hardware. Interpersonal Skills:

Project Management, Contract Negotiation, Creative Problem Solving, Time Management, Cost Management, Stakeholder Management, Team Motivation, Business Relationship Management, Presentation Skills, Waste Management, Waste to Energy, Recycling.

International Codes & Standards

Very well understanding and following IMS “Integrated Management System”. Following the International Codes and Standard under the Umbrella of ANSI “American National Standards Institute”, such as AWS “American Welding Society” for Steel Fabrication, and ASTM “American Society for Testing and Material” for non-destructive welding test, and SSPC “Standard Society for Protective Coatings”.

All of the above serve AISC code “American Institute of Steel Construction” for constructing the perfect steel construction. Also following ASME “American Society of Mechanical Engineers” for Boilers, Pressure Vessels and Tanks Fabrication.

EDUCATION

Technical Industry’s Institute for Irrigation Drainage, Survey and Land Reclamation August 1988 – May 1990

Associate Degree, College Diploma, 14 Years, from Technical Industry’s Institute for Irrigation Drainage, Survey and Land Reclamation 1990, Ministry of Higher Education.

Project Management Institute, PMI

®

, ID: 6559744E1

July 2021 – July 2024

Project Management Professional, PMP®

Under Process



Contact this candidate