Post Job Free

Resume

Sign in

Services Co Inspector

Location:
New Cairo, Cairo, Egypt
Posted:
March 13, 2022

Contact this candidate

Resume:

Essam Ali Roshdy

Mobile: +**--201*********

adqg69@r.postjobfree.com

Summary

Work Experience

Jun 1988 - Mar 2009 Egyptian Tank plant (factor 200) Cairo, Egypt

GM

Ministry of Defense and Military Production:

GM for surface treatment department of Early Pensions (Egyptian Tank Plant) from the Production and Repair at Factory (200).

Essam Ali Roshdy Hassan Hafiz

Ain shams university: BSc. of Science, Chemical 1987

Address: 80 ع Gardenia hits 1, Fifth Settlement

Phone number: E-mail address:

002-01065128999 adqg69@r.postjobfree.com

Ministry of Defense and Military Production:

GM for surface treatment of Early Pensions (Egyptian Tank Plant) from the Production and Repair at Factory (200).

Egyptian Tank plant factory 200 "ETP"

1/6/1988- 1/3/2009.

Job title: General Manager for "surface treatment department”.

QA&QC Responsibilities for the following:-

- Sand blasting& painting, plating, Heat treatments for parts of

Tank plants.

-Heat treatment work shop. Preparation to milling and drilling in order to decrease the hardness of parts to minimize the work time at the machines and after finish machining work make heat treatments another time according to specification and kay to steel procedure increase the hardens as required designs. Of part these entire due to minimize the parts coast.

* Stress relives after the hardening to realize all

Stress.

* Preheating as preparation the wielding operation.

*Induct heat Machen for sprockets hardens.

* Induct heat Machen for axes &bars hardens.

-Plating workshop production lines "6 lines" :

BLACK-OXID line.

PHOSPHATING line.

ZINK PHOSPHATE line.

NICKAL CHROME line.

ELECTROLESS NICKAL line.

ANODISING line.

- Committees inventory and inspection.

- Painting, Coating & sandblast workshop.

- Including inspection team engineer for all tools and

Machines camming to the factory.

- leader engineering team for one from the tenders’

Teams.

- Including inventory technicality list.

- Including to Internal team auditor.

- Leader for Photo-foil work shop.

- Solve of any technical trapshooting for the product

- parts (galvanized& heat treatment& painting) inside

- factor or outside.

Courses:

Ministry of defense: 9 Mar.- 8 May 2008

Qualifications for General Managers (Advanced level).

Research, design and technology development center

(Ministry of defense): 2-13 Dec 2007

Technology of manufacturing and testing of paints.

AJAX TOCCO : Ended MAY 2007

Gear tooth induction machine.

National institute for HSE(NIOSH): 19-30 Apr. 2003

Health, safety and environment (intermediate).

Ministry of defense: 22-26 Sep. 2001

Wastewater treatment technologies.

Ministry of defense: 07-19 Aug. 1999

Specialized in chemical analysis.

American university in Cairo: 20 Jun – 11 July 1999

Auditing environmental management systems.

Schlötter Galvanotecknik " Germany": Ended 30 Apr.1998

-Fundamental Galvanic technical training in theory and practice.

-Introduction in laboratory analysis.

-Laboratory examination of electroplating baths

Cairo university: 12-16 Apr. 1998

Evaluation and solution for treatment of waste water from industry (intensive course).

General union for Egyptian labors

(HSE institute): 7 Feb.-11 Mar. 1998

Specialization in HSE.

Egyptian tank plant: Ended 7 Apr. 1997

Induct heat System.

Egyptian tank plant: 5 Mar.- 10 Apr. 1997

Heat Treatment.

Induct heat International 12 Nov. 1996

Induct heat’s Unis can II/SP2 solid-state power supply operation,

Maintenance and troubleshooting training course.

Military Technical College (MTC): 22-27 June 1996

Surface and heat treatment.

International consulting research

Center (DAS): 04-20 Nov.1995

Surface heat treatment.

General Dynamics Services Co. : 26 Jul.-06 Aug.1992

Surface plating course.

General Dynamics Services Co. : 6-14 July 1992

Miller dials label machine and process.

Suez Oil Company "SUCO" 2017 until now.

Job title: Consulting and painting inspector (on-shore and offshore).

-Painting, Coating, could repair, sandblasting and painting inspector for Ras Budran plants.

Consultant for all Responsibilities:

- Could weld repair for loss thickness & Hall for any items (pipes, internal vessels, Tanks, exhaust for glycol sked, )

- Carry out could weld repair on 12” main oil line at one point on the welding joint( working under live pressurized pipeline )

-Carry out sandblasting and replacement Splash Zoon coating for membrane& legs at offshore plate forms.

-Project concerning test and coating repair for buried pipelines in RB fields.

-Carry out coating inspection and repair procedure for all oil and gas onshore and offshore (tanks, pipelines, vessels, constrictions, platforms helidecks, separator, crude oil heaters, desalted, slug catcher…etc)

-According to the available Funds setting up the required work plane, man power, materials and the budget needed.

-Giving complete instructions and guidelines for the stuff about the job, procedures, applications, safety precautions, qualified equipment’s, material, quality assurance and quality control.

-Reporting and handover to the operation sector after the completion of the project.

-Supportive and resourcefulness in responding to job challenges and high standards.

-Full awareness and knowledge of HSE rules and requirements for any job.

-Haley deck sandblasting, painting and marking.

-Could welled repair for internal desalted vessel from clock 3 to 9 position using ceramic coating.

-Sandblasting and painting for extension dick for platforms.

ACOTS& ESMAFCO group Co.

1/6/2016 TO 1/10/2017

Job title: General Manger for ACOTS Co.

-Tanks, separators, vessels, desolaters, etc...

-External pipeline corrosion repair.

-Valves repair & maintenance.

ERC PROJECT:

1/3/2016 TO 1\6\2016.

QA, QC MANGER FOR PAINTING, COATING AND INSULATION AT LG&C ENGENEERING Co.

RWE Dea Egypt (winter shale) now.

1/3/2013 to 1/10/2014

Desuco development project.

Job title CTP (center treatment gas plant) painting inspector.

Responsibilities painting inspector for the following:

- Document control for painting progress.

- Tanks (internal &external) painting system.

- Steel structure-painting system for all items according to

Standers In addition, specification for the designing.

- Fire proof system on the steel structure.

- Pipes rack painting system and insulation system.

- Vessels (internal external) painting and coating system.

Giving complete instructions and guidelines for the stuff about

Job, procedures, applications, safety precautions, qualified

Equipment’s, material, quality assurance and quality control.

- Reporting and handover to the operation sector after the

Completion of the project.

- Supportive and resourcefulness in responding to job challenges

In addition, high standards.

- Full awareness and knowledge of HSE rules and requirements for

Any job.

- Applied all the tests required according to the ISO and the

Standers as the specification need

Suez Oil Company "SUCO"

1/1/2004 to 5/3/2013.

Job title: Consultant and painting inspector (on-shore and offshore).

Responsibilities:

-Painting, Coating and wrapping inspector at Ras Budran, Ras Fanar and Zeit bay plants.

-Consultant for all projects concerning painting and coating and giving required recommendations, procedures and costs.

-According to the available Funds setting up the required work plane, man power, materials and the budget needed.

-Giving complete instructions and guidelines for the stuff about the job, procedures, applications, safety precautions, qualified equipment’s, material, quality assurance and quality control.

-Reporting and handover to the operation sector after the completion of the project.

-Supportive and resourcefulness in responding to job challenges and high standards.

-Full awareness and knowledge of HSE rules and requirements for any job.

Projects accomplished:

-Wrapping and painting for parried pipelines at Russ bud ran failed.

-Repairing the De-Salter vessel internal shell using cold weld

Material with corporation with ACOTS& CRROCOAT services Co.

-Painting and Coating the ESP extension decks project "7 decks" on the offshore production and drilling platform.

-Repainting the following :

The Gas Lift compressors plant.

The crude oil tank externally, internally, external roof, ladder and firefighting ring.

Helicopters decks for the offshore platforms.

Heaters and internal shell of the De-salter.

Internal potable water tank (4000 m ).

HPG/LPG pipelines and the hydra for the ground and high flare.

Internal and external diesel tank (4000 m ).

Christmas tree deck.

Offshore platform (3200 m ).

Internal test separator and air separator.

All gate and ball valves.

Jetty lines.

Pipe way.

Fire tanks

Ballast tanks.

-Wrapping 6" oil lines, ballast tank lines, firefighting lines and 36”&24” loading and ballast lines.

-Inter zone coating for splash zone area at legs and membrane for platform.

Hellwan casting Factory "military 9"

1/12/1987-30/5/ 1988

Job title: QC inspector for "casting workshop".

On call jobs:

Job Title: QA&QC FOR PAINTING& COATING.

Responsibilities: 3rd party inspector for:

oPainting.

oCoating.

oFire proofing

oWrapping.

oFiberglass.

oThermal insulation.

oCould wield repair.

FOREIGN LANGUAGES:

Arabic: Mother tongue.

English: Good written and spoken.

Computer skills:

Good knowledge in MS windows and office.

REFRENCES:

References and letters of recommendation are available upon request.

SHORT TIME Jobs

AS A PAINTING, COATING AND WRAPPING INSPECTOR:

15 Feb.2005 - 15 May 2005

Chaldea Petroleum Company (Salaam, Sempetko and Tarek Base).

18 Jan.2004 - 12 May. 2004

Gulf of Suez petroleum Co. (Gas plant).

16 Jun.2003 -19 Jun. 2003

Egyptian Canadian for chemical painting evaluation report.

29 May 2003-2 June 2003

Egyptian Canadian for chemical painting evaluation report.

1 Oct. 2002 –31 Jane 2003

South Dabbaa Co.

1 Apr. 2002 -30 June. 2002.

Cahromica location Qaroun Co.)

1 Jan. 2002 – 30 Mar 2002.

Qaroun Field Co.

1 Feb 2001. –30 May 2001.

Egypt air force.

Oct.2001- Dec. 2001.

Qaroun Field Co.

1 Jul. 2000 – 30 Aug.2000.

Gaisom Co.

1 Nov.1999 -28 Apr.2000

Khalda petroleum Co.

15 Jun 1999 - 30 October 1999.

Qaroun Co.



Contact this candidate