SHAKEEL ABDULLAH RAJA
CIVIL SURVEYOR
Gmail ID = adqfbd@r.postjobfree.com
Cell No = 009**-**-***-****
Keys Experiences
March 2000 to till date (Saudi Arab, UAE, Pakistan Experiences)
Surveying qualification and around +20th years wide experience in surveying field and civil construction with international construction companies in high rise buildings and steel structure buildings Roads interchanges & Bridges Sewerage Drainage pipe lines GRP,UPVC,RCC& DI from 100mm to 2400mmDia, GRP manholes & precast holes pumping stations,treatment plant Motorway, Highway & inter link roads All kinds of Roads curves setting out and calculation trigonometrically and coordinates Building layout finishing work block work curb stone, walkway, Streetlight Electrical and mechanical trenches pilling work topographic surveying and contouring work
EDUCATIONAL QUALIFICATION
Intermediate and Secondary education from Rawalpindi board in 1994
SURVEYING DIPLOMA from PMDC Surveying Institute Khewra (Pakistan) 1996 COMPUTER AWARENESS Ms. Office, MS Word, Ms. Excel, AUTO CAD
SURVEYING INSTRUMENT USED
Leica Total Station (TS-02, TS-06, TS-09), Leica Builder 500,503, TCRP 1201+400
Sokkia Total Station (Set - 610, 650, CX102, 103)
All types of levels Used
GPS 5800 Trimble
PERSONAL INFORMATION
Father Name = Mohammad Abdullah Raja
Date of Birth = 02 – 02 - 1974
Marital Status = Married
Nationality = Pakistani
Religion = Islam
Language = English / Arabic/ Urdu
Visa status = Transfer able
Profession = General Surveyor
SEC Membership = 447115
Passport No = AH9598483
Iqama No = 238-***-****
Driving License = KSA Valid
CHINA RAILWAY CONSTRUCTION COMPANY (MAKKAH) KSA
Client = Ministry of Interior (MOI)
Project = King Abdullah Bin Abdul-Aziz Project (KAP5)
Position = Senior Surveyor
Duration = 24 March 2018 to Till Date
Duties & Responsibilities
Jointly establish control points & bench mark with consultant
Topographic of area and levels before and after excavation
Setting out of Building for Excavation layout lean concrete
Important Grid & Coordinates marking for the building & foundation using total Station
Setting out of Road vertical & horizontal curves Road crossing culverts
Check and approved the as-built coordinates of each item which have Coordinate as per parameter along with checking of as –built drawings
CHINA RAILWAY CONSTRUCTION COMPANY (DAMMAM) KSA
Client = Saudi Aramco
Project = Expand Dhahran Residential Community (Package 4)
Position = Senior Surveyor
Duration = 10 April 2015 to 31 January 2018
Duties & Responsibilities
Jointly establish control points & bench mark with consultant
Jointly check NGL with consulting Team
Layout of buildings as per approved Drawings with Digital Instruments
Make a Survey Report, Daily & weekly progress report
Take a as built layout of building and paste on Soft Drawing
Setting out of pipelines for excavation & profile for the pipe laying
underground manholes, Catch basins, Duck bank & pipeline
RIYADH VILLAS CONTRACTING (RIYADH) KSA
Client = KSU ENDOWMENT
Project = King Saud University
Position = Land Surveyor
Duration = 18 Oct 2014 to 25 March 2015
Duties & Responsibilities
Jointly establish control points & bench mark with consultant
Topographic of area and levels before and after excavation
Setting out of Building for Excavation layout lean concrete
Important Grid & Coordinates marking for the building & foundation using total Station
Setting out of Road vertical & horizontal curves Road crossing culverts
Check and approved the as-built coordinates of each item which have Coordinate as per parameter along with checking of as –built drawings
ABV ROCK GROUP (YANBU) KSA
Client = Saudi Aramco
Project = Yanbu Aramco Sinopec Refining Company (YASREF)
Position = Senior Surveyor
Duration = 15 Aug 2012 to 15 Oct 2014
Duties & Responsibilities
Being in-charge of making stander for special project to improve QA/QC Survey work and as-built Drawing
Topographic of the area levels before and after excavation for contouring and earth work calculation and calculating actual quantity excavation in site
Setting out and level work done for road building, foundation, plastering, block work, Excavation Formwork, curb stone
AREAA CONSTRUCTION (TURKISH COMPANY) PAKISTAN
Client = Bahira Town
Project = Bahria Town Phase 8 Islamabad
Position = Civil Surveyor
Duration = 01 March 2009 to 30 July 2012
ALRAJHI CONSTRUCTION LLC(DUBAI) UAE
Client = Nakheel
Project = Palm Jabil Ali
Position = Civil Surveyor
Duration = 27 Feb 2008 to 13 Feb 2009
AKZONOBEL ICI SODA ASH IN PAKISTAN
Client = ICI Soda Ash
Project = 65Ktpa Expansion Project.
Position = Civil & Mechanical Survey Supervisor
Duration = 05 April 2007 to 20 Feb 2008.
CAMEC ENGINEERING IN PAKISTAN
Client = ICI Soda Ash
Project = 50Ktpa Expansion Project.
Position = Civil & Mechanical Surveyor
Duration = 01 Jan 2006 to 31 March 2007.
HABIB RAFIQ (PVT)LTD IN PAKISTAN
Client = Wada Housing Authority
Project = MDR, (AJK) New City
Position = Land Surveyor
Duration = 05 Jan 2003 to 31 Dec 2005.
HABIB RAFIQ (PVT)LTD IN PAKISTAN
Client = Defiance Housing Authority
Project = DHA Phase 2 Islamabad
Position = Civil Surveyor
Duration = 19 March 2000 to 01 Jan 2003
I request you to grant me an opportunity for an interview to prove my credentials at your convenience and certify that the above detail is true and to the best of my knowledge.
Thanks.
Shakeel Abdullah Raja.