Post Job Free

Resume

Sign in

Electrical Technician Engineer

Location:
Al Masfalah, Makkah, Saudi Arabia
Posted:
March 06, 2022

Contact this candidate

Resume:

Resume

SHAFIQ UR RAHMAN ANSARI

Contact: KSA: (058-*******)

Nationality: Pakistani

Email: adqepn@r.postjobfree.com

Driving Licence: LTV (KSA), & PAKISTAN

Technical Experties:

FOC Team Leader in Seder Group (MOI-911 Makkah Project) May2020 to until date.

Responsibe for all buildings conneted each other with fiber.

Maintance, troubleshooting all fence and inside camers

FOC Team Leader in Seder Group (SNFN MOBILY Project) Westren Madinah Region. (June2018 to May2020)

Long hall cable maintance, troubleshooting and clear the cable cut with in SLA.

Four different routs in madinah monthely PMR, mantain every reapter ISP.

Assistant Transmission Engineer in NayaTel Pvt Ltd. (08th June2015 to 19 June 2018)

Planning on GIS, Developing, Installation & Maintenance of Fiber Optics Networks including ISP, OSP &

Data center and POP.

Data center/ POP handling experince,New area of network connecting from Data center.

Installation of new fiber network and migration of old networks.(Du Migration Project)

Supervise the Tx-Testing team (Fault tracing and testing experince via using OTDR,VFL,PON meter,Optical Microscope,GPS meter and source Meter etc.)

Managing Development and Maintenance of Fiber Network laid in Multi city Islamabad, Faisalabad and Rawalpindi.

Speciallist for Un-cut Branching Joints on Core/Feeding Cable.

Cable Termiation at POPs and Datacenters in Different type of ODFs.

CERTIFICATIONS & TRANNINGS:

Six-month internship in Ahmad Jamal textile mill under (PYIP) Punjab youth internship programme (08 April to

02 October 2014)

Attending seminar on (Emerging Trends in B-Tech) in GCUF May 16th 2014

Attending seminar on (Technical education in Pakistan, Challenging and Opportunities) in GCUF Jan 27th 2015

Two-year experience in (PCI) Power chemical Indus. As a Senior Electrical Technician 1st Apirl2013 to 31st May2015.

Star delta, Reverse forward LT, HT power panels working and invertors installing.

Cummins 450KVA diesel engine generator and Gas engine generator 450KVA operator.

Maintenance and Control Setting of Fujikura 70S,80S by M-Tech (Fujikura)

Cabling and Ducting Training, From ‘NAYAtel Pvt Ltd.

FTTH (Optical Fibre) Training, From ‘NAYAtel Pvt Ltd.

Becomes star trainee in (FTTH) Fibre to the Home training from ‘NAYAtel Pvt Ltd.

Academic Qualification:

Bachelors of Electrical Technology B-Tech (Pass)

Electrical Technology (2013-2015)

GPA: (3.55/4.00) GC, University Faisalabad.

Diploma of Associate Engineering (Three Years)

Electrical Technology

A Grade 71% Punjab Board of Technical Education Lahore

Secondary School Certificate (SSC)

Science subject

A Grade 71% Board of Intermediate & Secondary Education Lahore

Achievements & Awards:

Installation of Faisalabad Data centre/POP Project

FTTH star trainee.

Employee of the Year Award

Idea Award for betterment of work in the favour of Company

Idea Award for Cost saving by slight modifications in the favour of Company

Declared Shining Star of Quarter March 2017-june 2017

Personal information:

Date of birth : Sep 02, 1990

Religion : Islam

CNIC :33102-1076320-3

Marital Status : Single

Driving License : Car, Bike, Jeep

Language : Urdu, English, Punjabi

Nationality : Pakistani

Professional Experience:

Organization : PCI (Power Chemical industries Fsd)

Area of Business Paints, Textile paper, wood leather and Construction.

Designation Senior Electrical Technician

Tenure June 01th, 2013 to May 31St 2015

Location Faisalabad

Organization : NayaTel Pvt Ltd.

Area of Business Work on Optical Fiber (FTTH-ISP Provider Company)

Designation Assistant Transmission Engineer

Tenure June 08th, 2015 to 19 June,2018

Location Islamabad/Faisalabad

Reporting to Deputy Manager, Engineer

Organization : SEDRE GROUP (CISCO MOBILY PROJECT)

Area of Business Work on Optical Fiber (FTTX- long hall fiber O&M)

Designation FOC Team Leader

Tenure June 26th, 2018 to 19 March,2020

Location MADINAH-KSA

Reporting to Deputy Manager, Engineer

Organization : SEDRE GROUP (MOI 911 Makkah Project)

Area of Business Work on Optical Fiber (FTTX- CCTV Access Control system)

Designation ELV team leader

Tenure MAY-2020 to until

Location MAKKAH-KSA

Reporting to Project Manager, Engineer

Technical Experties:

Trained in OTDR testing and light measurements using Noyes-OFL280, EXFO FTB-1,

JDSU T-BERD 6000.

Troubleshooting high loss and no signal, using various equipment like OTDR Noyes-OFL280, EXFO FTB-1 and JDSU T-BERD 6000.

Used Optical Time- Domain Reflectometer (OTDR) to locate faults and measures distances of cables.

Recorded and analysed test results for daily work reports

ONT testing router installation, network cabling.

Install and maintains fibre optic cables.

Test and splice fibre optic cables using an arc fusion splicing machine’s like FUJIKURA (50s, 60s, 70s), SUMITOMO (72c).

Installation process includes splicing aerial fibre distribution (4F service drops, 12F, 24F, 48F, 96F,144F and 288F),

Became an expert in splicing single fibers or ribbonizing any number of fibres

Expertise in using test materials like OPM, VFL, Live fiber Identifier, source meter, CORNING TOOL etc.,

Installations include aerial, direct bury, FTTx (FTTH, FTTB, FTTP, FTTC, FTTM).

Provisioning GPON port and testing connection to insure customer is receiving proper speeds.

Prep Lines and Terminations; Build Connections: SM/MM; SMPTE, ST, SC, FC, LC.

Troubleshot customer service connection issues via phone or on site.

Kept spare fibres available and documented for Optical Nodes.

Worked with NOC (Network Operational Call Centre) to plan and restore outages within time allowed.

Worked with contractors on new build and damaged control.

Everyday use of programs such as resource management programs, Google maps, docs and calendar.

Successfully worked through unexpected issues that go hand in hand with a newly launched product

2.Nayatel Pvt Limited

Jun 2015 to Present – Assistant Transmission Engineer

Job Description:

Data centre/ POP handling,

OSP/ISP Fiber Optic development and Maintenance

Testing & Troublshhoting expert

Complete command on OTDR, and testing equipments

Supervision of all maintenance activities of OSP in my domain

Back bone Fiber optic network maintenance, optimization between POPs (Point of Presence)

Managing, Maintaining POLTs’, VOLTs’, ODFs’ and WDM utilization and record

Managing all the new works/Tasks in my particular domain and ensuring 100% quality of work

Manage Multiple POPs consist of G-PON, Hawaii and B-PON Technologies.

Manage any Project of Internal Connectivity on Fiber Optic Cable of Any Plant/Company.

Installation of servers, patching, and hardware installation in datacentre.

Survey for laying and termination of fibre optics and UTP.

Projects:

Working as FOC Technician in CISCO MOBILY Project in Medina Western Region. Long hall fiber O&M project covered 1300KM area MADINA-YANBU MADINA-QASSIM MADINA-TABUK & MADINA-JEDDAH ISP and OSP miniatous.

Work on MARI Petroleum LAN Interconnectivity through multimode fiber including termination, testing and labelling.

Project include Installation of LAN Cables, switches installation, patching.

Company: Nayatel Pvt Limited.

Faisalabad FTTH project (ISP & OSP Network)

Faisalabad Data centre project. Install Cisco Juniper C-core devices and equipment’s, LAN Coaxial and Fiber routing etc.

3000 Customers feeding planning area on GIS (Geographic Information System)

Recently complete the project of fiber cable topology base in Interloop Ltd Faisalabad (20 decmber,2017 to 03, May 2018) Networking, Voice and CCTV project from installing to commissioning e.g CISCO Switches UPS, IP Camera data racks etc.

Join Seder TBS as FOC technician and perform duty in MADINAH RMC (CISCO SNFN O&M MOBILY PROJECT) From 26th June2018 to 25th January 2020,



Contact this candidate