**Years experience in Construction, Industrial field & Facility Management's, result oriented associate MEP Project Manager with a track record of managing business operation and optimizing processes by employing effective Project management &quality management principles to drive growth as post graduate in project Management Demonstrated capability conceptualizing & executing multi million QAR projects,led contract management &inventory Control project to save the organization million of QAR .Provides direction leadership &motivation to ensure that teams perform to the best of their abilities & deliver Consistently .

Highlights :

* Baseline schedules &Planning * Estimating cost

* Building Codes and regulation ( International &Local ) * Large scale projects

* Project Cost Control * Design review

Mobile : +974-******** Accomplishments :

E-Mail : ********@*****.***

LinkedIn : Amjad Rawashdeh

WhatsApp : 55862131

Membership :

* Jordan Engineering Association *

IEEE .

CERTIFCATIONS :

* KAHRAMMA Grade A Engineer . *

PMP Course . * .

Qatar Foundation Offsite Warehouse& Distribution Centre : 2011-2013

Main Warehouse for SIDRA hospital & Qatar Foundation construction street No-1 Industrial area budget 68 Million QAR successfully completed & handed over . ] Role : MEP Project Manager .

Designed by GEC & ASTAD Engineering Consultancy with PMC Louis Berger NOC available upon request

Kempinski Residences & Suites, Doha :

2008-2011

High rise building 2B+G+ 62 floor hotel apartment's including all hotel facility in West Bay,total 370 unit, MEP budget 155 million QAR, Handed over and completed successfully MEP designed by SHAKER consultancy group / PMC Arab engineering bearu (AEB ) AL Fardan Twin Towers :

2007-2008

High rise Building two towers ( Office tower 2B+G+30 Floors & Apartments tower 2B+G+40 Floors 174unit with BMW car show room including hotel facility & Shops in West Bay . Budget 150 Million QAR / handed over successfully

Role : Head of Electrical .

MEP designed by TEKIM -Greece / PMC Arab engineering bearu (AEB ) Al Fardan Gardens-3 :

2006-2007

Residential compound consist 51 Villas and Club house in Abo Humour area, with hotel facility's the MEP budget 18 million . Completed successfully .

Role : MEP project Manager

Designed & PMC Arab Engineering Bureau ( AEB )

.

Al Fardan Gardens-2 :

2004-2006

Residential compound consist 142 Villas including club house, swimming pools etc...Budget 40 million QAR Handed over successfully .

Role : MEP Project Manager]

Designed & PMC Arab Engineering Bureau ( AEB )

Arab Potash Company :

1989-2004

The Arab Potash Company (APC) is a company that is primarily involved in harvesting minerals form the Dead Sea It is the eighth largest potash producer worldwide by volume of production and the solo Arab producer of potash. The Company was formed in 1956 in the Hashemite Kingdom of Jordan Role : Maintenance Department - Electrical Engineer ( Industrial field ) MEP PROJECT MANAGER

Facility Management :

2017-Present

Company TDGISERV / Petroserv the contract with Qatar Foundation &Sidra hospital,Ooredoo, PHCC, Aspire projects, Facility Operation & Maintenance contract . Role: Electrical Engineering Manager

Education

*Master's Degree in

Electrical Engineering .

Academy - Ukraine - 2002

*Electrical Engineering

Technological Educational - Institute

( TEI) of Athens -Greece - 1986 . New Doha Port - NPP-47 2014-2017

( Centralized Customs Inspection area ) design & built project, the MEP budget 217 Million QAR, handed over successfully on 2017 .

Role MEP project Manager

Designed by - DAR ALHANDSA &PMC- AECOM .

* UPDA -EXPERT

1 of 5

Managerial Skills :

• Team Management

• Develop, establish, and administer procedures and systems pertaining to team management matters

• Prepare workload, sales forecasts and team resources/schedule for administrative and managerial functions .

• Project Work Forecasting

• Work with Project Team Leads to thoroughly review project proposals and contracts to ensure that:

• Projects are managed against the inclusions/exclusions

• Additional services are requested when deemed necessary

• Provide workload forecasting as new projects are secured and provide progress analysis regarding prospective unsecured projects.

• Update Integral accounting system information

• Client Liaison/Communication

• Serve as the principal liaison with selected clients or major projects

• Represent company at meetings with project clients and other project stakeholders as required

• Company representative at related association meetings, plus dealing with city, provincial and federal officials

• Teaching Skills • Mentor staff in all phases of design process and make recommendations to HR on training requirement's

• Utilize leadership skills and motivation techniques to maximize employee productivity and satisfaction

• Quality Assurance

• Affect and implement programs to improve the quality of our service, products and systems to meet client's requirements and expectations and minimize cost and maximize the company's competitive position .

• Affect and implement programs to improve the quality of our service, products and systems to meet client's requirements and expectations and to minimize costs and maximize the company's

• Engage all team members in quality issues to ensure that the quality control function is effectively performed

• Utilize the quality assurance and control programs in the company

• Assure adequate field review services are provided to ensure adherence of contract documents requirements and expectations and to minimize costs and maximize the company's

• Engage all team members in quality issues to ensure that the quality control function is effectively performed

• Utilize the quality assurance and control programs in the company

• Assure adequate field review services are provided to ensure adherence of contract documents Professional Experience :

Project -1 (2017- Present )

Company : TDGISERV/Petroserv faculty Management company -Doha,Qatar SN. Project Name Client Designation

1- Sidra Medicine Qatar Foundation Electrical Engineering Manager 2- Al Shaqab Qatar Foundation

3- Texas University Qatar Foundation

4- Qatar Academes & QF Schools Qatar Foundation

5- Male & Female Hosing Qatar Foundation

6- Student Centre Qatar Foundation

7- Ooredoo HQ & Customer Care Centres Ooredoo

8- Aspire / 18 Stadiums Grade B Ministry of Culture Sport / Mosanada About TDGISERV :

Present in 8 countries (Portugal, Angola, Mozambique, Spain, Brazil, Belgium, Luxembourg, Algeria and Qatar) TDGI intends to be a trusted partner for its clients in the management, maintenance and conservation of their assets, with the clear objective “Full Customer Satisfaction”. Job Profile :

* Lead &coordinate the activity's of TSS team ( Electrical ) major work .

* Follow up with government & authorities for power shutdown,QCDD inspections for BP renewal …Etc

* Follow up with the each facility team for PPM or CM if any technical challenges .

* Attend the weekly Meeting with Clients .

* Evaluate technically the HV,LV&ELV spare parts or chose the alternative spare parts .

* Create training plane for the MEP team

* Evaluate the contracts terms and condition ( technically & cost ) of EMC for special systems .

* Asist the Engineers for troubleshooting the system and approved the Electrical -RCA & SIR . Project -2 ( 2014-2017)

Company: Construction Development Company LLC -Qatar SN. Project Name Client Designation

NPP-47 ( Centralized Customs Inspection area ) MWANI-QATAR MEP Project Manager Designed by PMC

DAR ALHANDSA AECOM & NPP

Design and Build Project

The project is Consists of three Inspection Shades, Store for Hazardous material, Laboratory Customs Main Office, Masjid, three Canopies for truck Inspection,Derivers Booth, X-ray building Telecom Building, 9 Substations HV 22KV -GIS & Generator's /MV panels, High Mast lights, UPS,Emergency light, BMS, Accesses control system, Lighting control,,,Etc. Job Profile :

* Create & Select the Project team MEP based on the approved organization chart .

* Review the contract and scope of work by the team for each discipline for their comments . 2 of 5

* Review the project document's ( Drawings & Specifications ) by the Engineers & QS

* Attend the Meeting with Designer &PMC,Client .

* Create the plan & schedule for Design approval and mail stone .

* Review the design drawings by the team & study if can be reduce the quantities or alternative system .

* Complete the BOQ ( bill of quantities ) by QS & Engineers .

* Request for quotations thru the procurement department and evaluate technically & price

* Create schedule for companies prequalification related the approved vendor list

* Submit the shop drawing's for approval by monitor daily base

* Raise the RFIs to designer & consultant

* Plan for Material approval and submittals not exceeding the dates of approved plan .

* Submit the Mothed of statement for approval .

* Create Monitoring schedule for material delivery & approvals

* Create the manpower arenization & plane dates of joining to site from other projects .

* Attend the meeting with suppler negotiate to purchase minimum price and best delivery time &Quality .

* Attend the meeting with project team and solve any issue related to the project .

* Order the MEP approved material immediate to start the first fix activities .

* Monitor the daily activities and check the achievements and solve any problem appearance & in case delay the site activities.

* Submit the monthly billing after completed activities & approvals from PMC engineers or consultant .

* Submit & Control the record of any additional Variation or time extensions if any .

* Submit the material inspection in the store when material delivered & include in the monthly billings .

* Submit Method of statement for Testing & commissioning for PMC approval .

* After Approval form the PMC for testing commission can be submitted to authority's inspection for KAHRAMAA & QCDD,MOI ..Ect .

* Submit the project dossier including as built drawings & Operation Manual's …Ect.

* Connect permanently the MEP with the government net work ( Electricity power and drainage,plumping ) .

* Handover the project and get completion certificate from the client . Project -3 ( 2011-2013)

Company: Construction Development Company LLC -Qatar SN. Project Name Client Designation

Qatar Foundation Offsite Wearhouse &distribution Centre QF MEP Project Manager Designed by PMC

GEC Louis Berger & ASTAD

Qatar Foundation Offsite Warehouse and Distribution Centre project works comprise of Design

(of the Pre-engineered structure),

Procurement, Construction, Testing and Commissioning of the State-of-the-Art Warehouse and related facilities, as detailed below.

The Medical Warehouse (Warehouse 1) with fully automated sorter system, supports the Sidra Medical Research Centre

(SMRC) operation. The Warehouse is planned as a 28,655 square-meter facility to support a planned 550-bed SMRC. This facility is designed to hold approximately six months of inventory of all items that will be consumed by the SMRC except for pharmaceuticals.

including 6 Cold rooms, the warehouse with HVAC,Fabric HVAC duct / ( DUCT SOX), 8- chillers, 4 -Substation's,offices

,Cafeterias .

The General Warehouse (Warehouse 2) supports the Qatar Foundation (QF) warehousing requirements. The warehouse is planned as a 14,398 square-meter facility to support the warehousing requirements of the Qatar Foundation (QF). The facility is designed with two separate sections: Ai-conditioned and Temperature Controlled Storages. The Common Facilities, this facility houses the common services and support both medical and general warehouses. The common facilities are planned as a 5,900 square-meter facility to support both the medical and general warehouses. Ancillary Facilities / Buildings,Landscaping Works .CCTV system, UPS, Street light, Paging system,Fire alarm, BMS, Communication & Data system . Roof automatic ventilation system . Job Profile :

Project -4 ( 2008-2011)

Company: Construction Development Company LLC -Qatar SN. Project Name Client Designation

KEMPINSKI Residences & Suites Al Fardan Real Estate Co. MEP Project Manager Designed by PMC :

Arab Engineering Bureau Arab Engineering Bureau

The parcel of land for Kempinski Residences & Suites, Doha project is consisting of 7,193m located at the West

Bay District of Doha. The Kempinski Residences & Suites, Doha is a concrete framed structure with a height of 254.10 meter and consists of the following : Two Basements at Main Land and Three Basements at Government Land. The Apartment Units are in the 2nd to 28th floor levels and in the 30th to 62nd floor levels of the Tower. 29th Floor is for Services Area.

There are 370 Apartment Units categorised as follows: 56 units of 1-bed room

102 units of 2-bed rooms

204 units of 3-bed rooms 3 of 5

6 units of 4-bed rooms

2 units (penthouse) of 6-bed rooms

Amenities such as Restaurant, Gourmet Shop, Kid’s area and Public Utilities are all situated in the Ground and Mezzanine while the Swimming Pool, Steam Room and Gymnasium are in the first floor level of the Tower. The MEP system consisting ( Substations, Fire fighting system,Fire alarm, Car parking Ventilation System, 8000 meter of Bus Duct,Lightening system .

HVAC system using chilled water suppled form QATARCOOL,Mechanical rooms,Emergency Generator's, Fuel system, BMS,CCTV,Accesses control,lighting control system, Paging System .VFDs,UPSs,Emergence light ….Ect .

Job Profile : ( Refer to the above for same position ) Project -5 ( 2007-2008)

Company: Construction Development Company LLC -Qatar SN. Project Name Client Designation

AL FARDAN TOWERS Al Fardan Real Estate Co. Head of Electrical Department Designed by PMC

Arab Engineering Bureau & MEP by TEKM Arab Engineering Bureau (AEB ) The Al Fardan Towers is an EPC Contract (Engineering, Procurement and Construction) for 2 Towers, the the Office and the Apartment Tower.

Office Tower Building:

Ground Floor

Mezzanine

30 Typical Floors

Plant Room

Machine Room

Apartment Tower Building:

Ground Floor

Mezzanine

40 Typical Floors

174 Apartment Units

2 Plant Rooms

Swimming Pool

Health Club

Machine Room

The Office and Apartment Towers are connected at the Ground Level by a Podium that houses the following: Car Show room ( BMW,MINI )

Retail Shops

Café shops .

Car parking facilities are located at the 2 basements. The Electrical system consisting the following : Substations,Emergence Generators, Emergence light, Lighting Control system . MV panel HV switchgear, MCCs, ATS, BUS-BARS,facade light,UPS, BMS, DATA & Communication system, Car parking systems . Lightening system . Job Profile :

*To establish the needs of the client and to coordinate with other disciplines and office personnel to ensure that these requirements are met.

*To assist and mentor support staff in the fundamentals of Electrical design, calculations and preparation of construction documentation.

*To provide technical assistance and respond to contractor’s inquiries that relate to construction project

*To prepare technical reports, construction cost estimates and cost analysis

*To coordinate and schedule / plan the projects with support staff to ensure timely completion.

*To respect company values and policies.

* Prepare material cost and timing estimates, reports, and design specifications for electrical building systems and equipment.

* Inspect the installation, modification, testing, and operation of electrical equipment.

* Complete the shop drawings & submit for approvals .

* Prepare contract documents and evaluate tenders for construction or maintenance

* Supervise technicians, technologists, programmers, analysts, and other engineers.

* Review design & shop drawings of lighting, power, data, communication, security, and fire alarm systems power distribution system .

* Attend the daily meeting with site engineers & supervisor to achieve the daily activities

* Attend the meeting with MEP project manager and update him for any site challenge's .

* Update the daily material delivery & status .

* Submit the Mothed statement for testing & commission of the electrical system

* Coordinate with government authorities & submit all the related document's for power connection and inspections

* Submit the As-built drawing & OM manual / Project dossier . Project - 6 ( 2006-2007)

Company: Construction Development Company LLC -Qatar SN. Project Name Client Designation

AL FARDAN Gardens -3 Al Fardan Real Estate Co. MEP Project Manager Designed by ( DANAT QATAR) PMC

Arab Engineering Bureau Arab Engineering Bureau (AEB ) The project is for the construction of 51 Villas and its entire associated external works Civil & MEP in Abu Humour, Qatar .

Villa

4 of 5

Type A – Duplex

Type A – Single

Type B

Clubhouse

Elevated Outdoor Tennis Court

Gymnasium

Industrial Kitchen

Job Profile :

Project - 6 ( 2004-2006)

Company: Construction Development Company LLC -Qatar SN. Project Name Client Designation

AL FARDAN Gardens -2 Al Fardan Real Estate Co. MEP Project Manager Designed by ( DANAT QATAR) PMC

Arab Engineering Bureau Arab Engineering Bureau (AEB ) The project is for the construction of 142 Villas & Club House and its entire associated Civil work,MEP, landscape

Villas:

Type A

Type B

Villa with Swimming Pool

Clubhouse:

Billiard Room

Gymnasium

Main Pool Area

Outdoor Tennis Court

Restaurant and Coffee Shop

Sauna Steam Room

Viewing Room

Utility Building:

R.O. Plant (Reverse Osmosis)

Substations 1 & 2

Industrial Field Experience :

Arab Potash Company ( 1989-2004 ) :

Location : Jordan -Dead sea ( Ghore Safi )

Potash is produced worldwide at amounts exceeding 90 million tonnes (40 million tonnes K2O equivalent) per year, mostly for use in manufacturing. Various types of fertilizer-potash constitute the single largest industrial use of the element potassium in the world.

Arab Potash Refinery consist the following Electrical System :

* Electrical Turbines, 3.3KV Electrical motors MV panel HV/LV,MCCs, VFDs,CBS,UPS, PLC,

* Electronic instrumentation department .

* Electrical maintenance Work shop .

Job Profile :

* Supervised the electrical work on round-the-clock manufacturing unit.

* Provided all required electrical system technical support.

* Coordinated with production department on project progress.

* Identified and resolved causes of equipment malfunction.

* Ensured adherence to all facility safety precautions and procedures.

* Excellent grasp of electrical maintenance work practices and processes

* High skills in electrical control systems installation and repair

* Strong knowledge of electrical distribution systems and high voltage motors

* Exceptional familiarity with automation and PLC systems . Update : 28-09-2020

5 of 5



Contact this candidate