Post Job Free
Sign in

Land Surveyor Site Engineer

Location:
Al Dafna, Qatar
Posted:
March 02, 2022

Contact this candidate

Resume:

ARIEL EVANGELISTA DUMAYA

Senior Geodetic Engineer/Land Surveyor

OBJECTIVE

To obtain a position in multinational company which offers a professional working environment and enables me to utilize my knowledge and skills while meeting the goals and objectives of the company.

PERSONAL DATA

Nationality : Filipino

Date of Birth : March 18,1973

Age : 48 yrs. old

Status : Married

Religion : Christian (Iglesia ni Cristo)

E mail Address : ***************@*****.***

Mobile No. : +974********(Qatar)

Driver License : 9-27-2026 Validity

Language Spoken : Tagalog,English and Arabic

Member Affiliation : Geodetic Engineers of the Philippines-Qatar

WORK EXPERIENCES

4 Years in Building construction, Roads and Land Development - Saudi Arabia

5 Years in Infrastructure,Road & Building Projects - Qatar

9 years façade surveyor - Qatar

7 Years Senior Engr. in Dam Reservoir,Irrigation and Road Projects - Philippines

2 years in Land Surveyor (Land Boundary marking,partition property) - (Private Surveyor).

EDUCATIONAL ATTAINMENT INCLUSIVE DATE

College/University : Araullo University, 1993-1996

Cabanatuan City, Philippines (Graduated)

Course : B.S. Geodetic Engineering

College/University : Central Luzon Polytechnic College, 1990-1993

Cabanatuan City,Philippines (Under Graduate)

Course : B.S. Civil Engineering

Secondary School : Araullo University 1986-1990 Cabanatuan City, Philippines (Graduated)

SKILLS & INTEREST

Microsoft Office

Knowledge in Civil 3D

Auto Cad

Importing/Exporting of Survey data from Total Station to Computer and Vice versa.

Plotting of Survey Data Points gathered from survey on site.

Survey Work Reporting

Driving

INSTRUMENT HANDLED BRAND NAME

Gps - Leica

Total Station - Set 5X,Sokkia, Leica

Theodolite - Sokkia,Leica

Automatic Level - Sokkia

Microscopic Theodolite - Nikon,Sokkia

Rotating Laser with Receiver and Monitor - GL-70,Trimble

Wild Theodolite - Sokkia

Leica TS-09,TS 06 PLUS, T 11,TS 03 - Leica

PHILIPPINE GOVERNMENT EXAMINATION

AND AFFILATION RATING

Civil Service Sub Professional - Passed

(For Philippine Government Service)

Senior Geodetic Eng.g Board Examination - Passed

(License to Practice Land Surveying)

Member Geodetic Engineers of the Philippines Qatar Chapter

SEMINARS AND TRAINING ATTENDED

“Upgrading the Technical Capabilities of Civil Engineers to Opti-

mize the Quality of Construction Projects"- Conducted by Philippine Institute of Civil Engineers (PICE)

“Construction Surveying” - GEP QATAR

Building Construction Surveys - GEP QATAR

Autocad Productivity Tools for Survey Drafting - GEP QATAR

and Data Processing

Modern Survey and Road Geometric Design - GEP QATAR

Certificate of Training Leica Geosystem - QATAR

Infrastructure Subways and Bridges - GEP QATAR

Building Construction Interface - GEP QATAR

EMPLOYMENT RECORD

NAME OF COMPANY

Ramco Contracting and Trading Company

Infra Projects Division

Date of Joining : Oct.15,2019 – up to present

JOB DESCRIPTION

Prepare Survey Report for Inspection Request (Utilities and Building ) as per Approved Plan.

Preparation of Setting out Shop Drawing for all proposed utilities based from IFC drawings.

As built of all existing development in the project site.

As built Topographical Natural Ground level in project site.

Coordinate with the Construction Manager, QA/QC, Site Engineer for all priority schedule pertaining to all Surveying Works.

Micro Tunneling

Review IFC Drawings and Approved Drawings as well as RFI’s.

Topographic Survey

Pipeline Route & Alignment Sheet Fixing

Locating Existing Utilities & Services

Control Stations Setting

Work on basic Engineering Calculations

Joint survey with client /consultants

Survey activities related to Treatment Plant works such as equipment foundations, pipe culverts, pipe rack, pipe supports, structural works etc., including other Mechanical, Electrical, Instrumentation,Telcom, HVAC and SCADAA works

Infrastructure works such as earthworks, road, drainage and waterline works.

As-Built survey and As-built drawing preparation

Reviewing Understanding and Implementation on site the current QCS requirements.

NAME OF COMPANY

TECHNO METAL WLL

Façade and Steel Decorating Contractor

Date of Joining : Dec.15, 2015 – October 30,2019

ALUMCO, QATAR W.L.L.

Engineering Solution for Creative Minds

Façade Contractor

Date of Joining : October 10,2009 - December 10, 2015

Main Contractor : HOCHTIEF Solutions Middle East

Projects Name : Barwa Commercial Avenue/Type 3,4 and 5.

: New Doha International Airport (CP-51)

Position : Senior Land Surveyor

JOB DESCRIPTION

Established Horizontal and Vertical Control Points with Higher Degree of Precision.

As built of existing structure / building in conforming of plans and for design and fabrication purposes needs by Technical Team.

Provides the reference points,lines,In/Out and Levels for Brackets,Mullion,ladders,railings,Claddings etc.

Checking the alignment,In/Out, Levels of profile Ladders,Transoms,railings before installation of Claddings and Curtain Wall as per instruction for QA/QC Inspection.

Allowed In/Out,Alignments and Levels should be +/- 2mm.

Reviewing, understanding and implementing on site the current QCS (Qatar Construction Specification) requirements.

NAME OF COMPANY

BUILDING CONSTRUCTION COMPANY

P.O.Box 30730,Al khobar 31952,KSA

Date of Joining : September 15,2005 – October 08,2009

Position : Senior Surveyor

PROJECT ACCOMPLISHED

Al QASSER HOUSING PROJECTS

Riyadh, Saudi Arabia

Developer/Owner : DAR AL ARKAN

Cost of Project : 126 Million SR, 22 Units, 5 Storey Building

Program Manager : TURNER

Consultant : DAR AL HANDASAH, Share and Partners

SHAMS RIYADH LAND DEVELOPMENT PROJECTS

Riyadh, Saudi Arabia

Developer/Owner : DAR AL ARKAN

Cost of Project : 50 Million SR, 80 ha.

Program Manager : TURNER

Consultant : SAUDI CONSULT

AL KHOBAR LAKE DEVELOPMENT PROJECT

Dharan,Saudi Arabia

Developer/Owner : EMAAR

Cost of Project : 220 Million SR, Grading Layout and Construction

of 160 units of Housing Villas.

Program manager : CIMS, Construction and Management Services

Consultant : SAUDI CONSULT

ROWAD PLASTIC FACTORY

2nd Industrial, Dammam,K.S.A.

Cost of Project : 25 Million SR, 300 x 60 mtrs building

Consultant : Al Eid Engineering and Architecture

Supplier of Pre : Zamil Steel

Engineered

Steel

ALFOZAN CORPORATE BUILDING

Al Khobar,Saudi Arabia

Cost of Project : 30 Million Sr, 10 Storey Building

Consultant : ARC, Engineering and Architecture.

JOB DESCRIPTION

Execute Topographical Condition of Natural Ground Level

Monitoring the Limit of Excavation and the required grade level from the bottom of lean concrete to the foundation of the building

Responsible for Setting out of Exact Location of Property lot boundary, based on Northing and Easting as per Approved plan.

Prepare plans and data survey in digital form for the CONTRACTORS REQUEST for INSPECTION(CRI) to the survey consultants for Approval.

Establish batter board for reference axis to get the location of footings,columns, foundations(raft, isolated,strip) of the propose buildings.

Giving the reference levels for the limit of concreting from Structural slab,Height of column neck, column for framing layout,Grade beam level for every floor of the building.

Responsible for the layout of partition of walls, columns, doors, windows, Opening shaft for Electrical, Mechanical(HVAC) with coordination to Architectural drawings.

Giving the Gradient of Sewer pipelines as per required percentage.

For finishing, responsible for line and grade of curbstone, tiles, lamp post, finishing of asphalt pavement.

Quantity survey ; earth moving,backfill and excavation

Execute as built survey

Serve as Site Engineer and Foreman on the Project Site

SHAMS AR RIYADH, LAND DEVELOPMENT PROJECT

Riyadh,Saudi Arabia

Project Area : 80 ha.

Cost of Project : 50 million

JOB DESCRIPTION

Topographical Mapping in digital form.

Establish Horizontal and Vertical Survey Control Points in the whole covered area of the project with required high degree of precision.

Coordinate with the survey consultant for the checking of alignment and levels for every structure before pouring concrete as per Request for Inspection.

Taking the detail topographical condition of the whole covered area of the project using a Sokkia Total Station

Responsible for the grading layout of design contour as per plan .

Giving reference levels for every layer of backfilling and excavation as well.

Giving Line and Grade for the Construction of Proposed Two Cell Culvert (900 meters long), Manholes,Sewage Pipeline. Electrical,Water,Telephone,Roads Construction,Plant Box, Lamp Post, and other related proposed structure.

Determination of volume quantities (Cleaning and Grabbing,Backfilling,Cutting).

Taking the profile, x section of the propose roads.

Plotting and Mapping using Civil Survey Software.

Plans and designs land sub-division projects and negotiates details with local governments and other authorities

Compiles and evaluates data, interprets codes of practice, and writes reports concerning survey measurement, land use and tenure

Prepares site plans and survey reports required for conveyance and land ownership matters

Determine the position of points of interest on the earth's surface, such as topographic surveys and relocation surveys, and prepares the final product data in digital form

Prepare the plans, maps, drawings and lot data computation sheets for submittals to the Consultants Approval.

ROWAD PLASTIC FACTORY

2nd Industrial,Dammam,KSA

Cost of Project : 40 Million SR, 300 x 60 mtrs building

Consultant : Al Eid Engineering and Architecture

Supplier of Pre Engineered

Steel : Zamil Steel

Factory designed by : DMT (France)

JOB DESCRIPTION

Building Layout, from the property line up to the limit of excavation of footing foundation.

Layout of all trenches ( Pipe,Air,Electrical,Water,Oil ).Giving all dimensions,Lines and grades.

Responsible for the layout and grade of anchor bolts and plates with a maximum tolerance of 3mm for every adjacent group of bolts.

Perpendicularity and parallel ness must be maintain properly and check regularly, the consultant in charge very much concern about it.

Dimensions and levels must be in +/-1mm up to +/-5mm as required by the specifications.

Axis of moving machines such as overhead crane must be aligned perfectly and the steel plates foundation accurately established.

Installation of I BEAMS serve as foundation and footing of moving machine is carefully align its location as well the design level.

Foundation of silos, underground tanks,diesel tank, electric generators,trenches,sump pit, must be locate properly as per approved plan and design.

Giving all reference layout and grades for the installation of Plant Machine.

NAME OF COMPANY

NAEL and BIN HARMAL HYDRO

EXPORT LTD.

Doha, State of Qatar

Date of Joining : May 30,2003 –June 15,2005

PROJECT ACCOMPLISHED

P.S. 37, Muraikh Area Sewerage,Doha,Qatar

Joint Venture with : National Industrial Contracting Company

Consultant : K.E.O. International

Scope of Work : Construction of Sewer Manholes, Installing of Pipe

Lines (500-150 Ø)

Doha and Rayyan Sewerage, P.S. 21, Area Phase 2

.Joint Venture with : United Construction Est., Doha, Qatar.

Consultant : Hyder Consulting, Middle East Limited.

Scope of Work : Construction of Sewer Manholes,Pipe Lines, House

Connections Pipelines

JOB DESCRIPTION

Responsible for Setting of Exact Location of Manholes and Sewer pipe lines based on Northing and Easting with accordance to road reservations.

Responsible for checking all RO2 for existing underground utilities using underground locator. Trial holes will be dug by Hand to expose and verify exact location of utilities

Responsible for Excavation of Propose Manholes, Trenching of Sewer Pipeline to be carried out the line and grades as shown on approved drawings.

Giving all reference for lines and grades for the construction of Manholes, pipelines installation, Foundation Levels, blinding, concrete base, built in pipes, ramp, backdrop levels etc.

Preparation of Inspection sheet of Level Pipes from U/S to D/S as required by Consultant Approval.

Responsible for the design of House Connection levels and locations to be connected in Proposed Manholes with approval by consultant.

New Amiri Flight Hanger

Doha International Airport, Qatar

Main Contractor : Strarch, Australia

Consultant : ATKINS, WS ATKINS and Partners Overseas

Scope of Works : Setting Out and Excavation of Hangar Foundation

Beams and Pads (150 x 200 met

JOB DESCRIPTION

Setting Out the Locations of Propose New Amiri Flight Hanger.

Responsible for Excavation of foundation level considering that the foundation must be founded a minimum of 300mm below rock head level.

Set the exact location of Foundation Beams (26 Nos.) and Foundation Pads (15 Nos.) based on the approved contract drawings.

Location of Bolts as per Approved contract Drawings for every Foundation Pads and Beams is Frequently monitored before and after pouring concrete.

Locating and excavating the drainage line going down to existing open drainage canal.

Excavation procedure using trencher machine 1660 HDE Caterpillar with laser, receiver and monitor on boa

NAME OF COMPANY

Republic of the Philippines

National Irrigation administration

EDSA, Quezon City

PROJECT ACCOMPLISHED

Date of Joining : September 04, 1997 - May 12, 2003

Position : Government Land Surveyor/Survey Inspector

Project Name : Casecnan Multi Purpose and Power Plant Project.

Project description : Construction of Super Diversion Irrigation Canal (60kms

By 50 meters wide,Lateral Canals (250 kms

Long with Roads),Bridges and different

structure

JOB DESCRIPTION

Established Horizontal and Vertical Control Survey Points with a Higher Degree of Precision (Secondary Project Control).

Setting out of 60 km. Long Super Diversion Canal, 250 km.long lateral canals, taking the Profile of every 20 meters station and Cross section for every 50 meters. .

Execute detail topographical Surveys, 200mtrs away L/S and R/S from center line of canal.

Detail Topographical survey, profile, cross section of 4Nos. existing Diversion Dams for renovation and Construction of additional intake gate Structure and for the purpose of desilting of Upstream and Downstream portion of Dam.

Giving lines and grades for the Construction of Gravity Dam, its component, gravity wall, retaining wall, rip rap, water breakers etc.

Inventories of Existing Irrigation Structures for repair and maintenance proposal.

Detail Topography of 50 has. Mountainous area including Low Ground for the construction of propose water reservoir considering the limit of maximum flood water level.

NAME OF COMPANY

Engr. Hermogenes Aquino Jr.

Surveying Firm/Contractor

Date of Joining : August 01, 1993 –April 29, 1997

Position : Chief of Party/Instrument Man

Project : Land Development Project, Class A Subdivision, Road

Construction, Drainage, Electrical, Water Line,

Layout, Culvert

JOB DESCRIPTION

Setting out of Lot Boundary, Subdivision of Lots, blockings etc.

Setting out of Roads Right of Way, levels of Sub Base, concrete/asphalt finish, Horizontal and Vertical elements of Roads, Simple and Compound Curves.

Research in different Government Offices of Lot Plans, Cadastral Maps, Land Titles, Engineering Plans as reference for Lot and Construction Project.

I hereby certify that all information written above is true and correct as based of my full knowledge and capabilities. Attached herewith my Credentials,Certifications, Seminars and supporting Documents for your further Reference.

ARIEL E. DUMAYA

Land/Construction Surveyor



Contact this candidate