Post Job Free

Resume

Sign in

Electric Co Hills Resources

Location:
Detroit, MI
Posted:
February 28, 2022

Contact this candidate

Resume:

Christopher B. Navarro

*** *. ***** **** ******, TX 77979

C 361-***-**** E adqcwr@r.postjobfree.com

Objective Obtain a challenging leadership position applying creative problem solving and lean management skills with a growing company to achieve optimum utilization of its resources.

Skills TX – Electrical License #110630 (20+ years in electrical trade) NCCER Certified Industrial Electrician #2687366

HASC Basic Plus

TWIC Registered Exp. 07/22

2019 NFPA-70E Electrical arc Flash Hazard F-6.1

3M High Voltage Stress Cone Certified 2013

Experience

7/19-2/20 Tradesman International / ISC. Inc. @ W.R. Grace – Worley Construction Sulphur, LA

• Supervisory Foremen

• Responsible for 10 + man crew

• Punch list and commissioning support

• Blueprint reading

• Daily planning

• Daily production and construction reports

• Material inventory / Order Requisitions

• Safety meetings / tool box talks

• Quality Control (QC) support

• Working foreman in field

• Coordinated with main electrical contractor

• Last contracted foreman on project

3/19-6/19 Power Control Systems Engineering, Coleto Creek Power Plant Fannin, TX

• Industrial Electrician / Maintenance Support during coal plant shutdown

• High voltage testing / megging of 4160 SWGR and pm of said equipment

• Extensive Troubleshooting of PLC’s in MCC throughout plant

• Conduit / cable installation and terminations

• Racking in and out 4160 SWGR

Page 2

9/18-2/19 ProEnergy Crafts Sedalia, MO

• Turbine Generator Power Plant Project - Victoria, TX

• Fabrication and installation of rigid conduit up to 6” diameter, including brackets and supports

• Installed various instruments and wire / cables and performed terminations on stated electrical components

• Terminated 480 V motors, disconnects and incoming wires / cables into MCC buckets and power panels

• Promoted to Foreman after 30 days of employment

• Responsible for 10+man crew for installing wires / cables into cable tray rack

• Maintained daily logs / data entry of work progression

• Planned work scope and managed schedules of operation

• JLG mandlift operation

4/18- 8/18 Prism Electric, Austin, TX

• DeTar Hospital ICU Expansion, Victoria TX

• Responsible for high voltage installation and termination of 350-500 KCMIL cables for backup generator and switchgear

• Performed megging tests and applied torque specifications on terminal lugs and buss bar

• maintained daily log sheets of stated testing

• Installed EMT conduit up to 4” diameter and also wire and cables

• Installed lighting, plugs, switches and performed scissor lift operator

• Installation of high voltage buss duct to connect switchgear 7/17--3/18 Merit Electric CO. Baton Rouge,LA

• TPCO America Project, Gregory, TX.

• Assigned to terminating crew - responsible for blueprint reading and locating termination points for up to 15KV power cables into MCC switchgear.

• DCS and PLC terminations

• Use of torque wrenches

• High / Low Voltage megging and continuity testing

• Extensive (daily) logging and data entry

• Assembly of Switch Gears and related components to specifications, including buss bars, lugs, hardware, insulators, supports, etc.

• Fabrication and installation of rigid and flexible conduit up to 6”

• High voltage stress cone application on 35KV XFMR feeders Page 3

4/17 – 5/17 MMR Constructors, Inc. Ingleside, TX

• Multiple unit shutdown/INVISTA Victoria, TX

• Demolition of electrical and instrumentation components in chemical process areas including switches, fuses, terminal blocks/contactors, conduit, wire, tubing and transmitters

• Re-installation and termination of said electrical and instrumentation components 10/16 – 4/17 BECHTEL SERVICES PORTLAND, TEXAS

• Cheniere LNG Project - Corpus Christi

• New construction, fabrication & installation of conduit, cable trays, supports, field panels, lighting, bus ducts and wiring/cables

• Terminations of PLC and Marshalling cabinets, field lighting and power panels

• High voltage hook-ups/connections of 150-750 KCMIL cables in switchgear including applying lugs and megging of said cables

• Installation of underground grid and cathodic protection, cad welding

7/16 – 10/16 ISC CONSTRUCTORS LLC League City, TX

• Unit shutdown/DOW Seadrift, TX

• Demolition/reinstallation of conduit, wire, instruments, switches, and field panels

• Terminations of said components

10/15 – 4/16 Bayou Electrical Services Houston, TX

• Enterprise Tank Farm/Beaumont, TX

• Installation of conduit, wire and cables in field

• Transport & Install from MCC oilfield skid/pump station

• Termination - PLC & OMNI panels including PIT, TIT & MOV components

• Installation of cable tray & supports

• Grounding

11/14 – 9/15 ETEC INDUSTRIAL SERVICES CORPUS CHRISTI, TX

• Panda Sherman Power Plant/Sherman, TX

• Foreman/Lead (8) man crew

• Supervised & managed daily work scope

• Commissioning of heat tracing system on process pipes Page 4

• Used test equipment - voltage reading, megging, amp reading

• Maintained time sheets, daily reports & safety meetings 04/14 – 11/14 WOLFENSON ELECTRIC HOUSTON, TX

• Kinder Morgan Liquid Terminal – New construction, fabrication & installation of rigid conduit up to (4”), cable trays, wire/cable pulling

• Installation and terminations of EJB, IJB, Switches, Start/Stop, MOV’s

• MCC high voltage hook-up & stress coning

03/13 – 04/14 TRIAD ELECTRIC & CONTROLS

CORPUS CHRISTI, TX

• Flint Hills Resources – West Plant

Foreman/Supervisor/Management (15+) man crew

• Energy control verifications, job planning & scheduling

• Maintained work production, daily reports & safety meetings 05/12 – 02/13 AZOTA GAS PROCESSING EDNA, TX

• Industrial Journeyman Electrician Eagle 1-Gas Project – New Construction

• Installation of conduit, cable trays, start/stop switches, lighting, field panel terminations - MCC, field panels, vibration switches

• Man-Lift Operator

INVISTA unit shut down Victoria, TX

02/11 – 04/12 WOLFENSON ELECTRIC HOUSTON, TX

• Industrial journeyman electrician shutdown project – Installed conduit, cable tray, field panels & instrument

• Terminations – Wiring MCC/DCS

• Man-Lift Operator

Page 5

11/09 – 01/11 WINDSOR CONSTRUCTION AUSTIN, TX

• Remodeling and add-on construction of commercial buildings including hospitals, nursing homes, strip malls, schools

• Installation of EMT conduit, lighting, switches, plugs, power and lighting panels

• Pulling wire and terminating

04/08 – 10/09 ISC CONSTRUCTORS LLC LEAGUE CITY, TX

• New construction Project/Marathon Refinery, LA

• Industrial journeyman electrician

• Installed conduit, wiring, field panels, switches, lighting

• Terminations – JLG-Lift Operator, MCC Wireman

• Fabrication & installation – cable crays

Education 1990 CALHOUN HIGH SCHOOL/DIPLOMA

1991 – 1992 VICTORIA COLLEGE/COMPUTER AIDED DRAFTING 1999 – 2000 ITT TECHNICAL INSTITUTE/CHEMISTRY TECHNOLOGY References Ram Munoz

361-***-****

I & E Commissioning Specialist

Tim Robles

361-***-****

General Foreman- TRIAD Electric & Controls

Marty Anderson

970-***-****

Superintendent – ETEC Industrial Services



Contact this candidate