Post Job Free
Sign in

Offshore Construction Engineer

Location:
Hyderabad, Telangana, India
Posted:
February 28, 2022

Contact this candidate

Resume:

Sandeep Gangavaram +91-703**-*****

Personal Information *****.**********@*****.***

Nationality Indian

Profile 11.5 Years of experience (field / installation & project engineering along with project management) in offshore installation & inspection of the offshore platforms, submarine pipelines & cables, floating unit & subsea production system and other various subsea assets in the region of Arabian Sea, South East Asia and Persian Gulf.

Education 2010 – Sardar Vallabhbhai National Institute of Technology (NIT- Surat), India (MTech – Structural)

2008 – Andhra University (AU), India (BE - Civil) Qualifications

Master of Technology in Structural Engineering (CGPA – 7.61)

Bachelor of Civil Engineering (CGPA – 6.98)

Training/skills

Well versed experience with drafting software AutoCAD

Preliminary experience with design & analysis Software’s Staad–PRO & SACS

Microsoft Office Package

Languages spoken Native: Telugu & Hindi

Fluent: English

Work Experience

Dec 2019 – Dec 2021 Position – Project Manager (Subsea – ROV) Company – Fugro Peninsular Services Co. WLL

Location – Doha, Qatar.

Oct 2018 – Nov 2019 Position – Project Engineer (Subsea – Diving & ROV) Company – Fugro Survey (Middle East) Ltd.

Location – Abu Dhabi, UAE.

Oct 2014 – Sept 2018 Position – Project Methods Engineer / Sr. Field Engineer Company – Valentine Maritime Gulf LLC

Location – Abu Dhabi, UAE.

Apr 2013 – Sept 2014 Position – Project Engineer / Installation Engineer Company – Leighton Offshore Construction Pte. Ltd. Location – Singapore / Dubai UAE.

June 2010 – Mar 2013 Position – Field Engineer / Sr. Field Engineer Company – Swiber Offshore Construction Pte. Ltd.

Location – India / Singapore.

Fugro Peninsular Services Co. WLL

Project Manager

Responsible for managing offshore projects in Qatar for major Stakeholders such as Qatar Petroleum, Qatargas (North & South) Limited Company Ltd., Qatar Shell (QSGTL & QSSC) and North Oil Company along with EPC Contractors Saipem, Qcon & DOPET.

Coordination with other departments (Planning, Engineering, Operations, Commercial / Bidding / Estimation, Procurement, Subcontracts, QA/QC, and QHSSE). 2021 May – Client: Qatargas Limited Company Ltd. & Saipem 2021 December Project: EPCOL Pre-Engineering ROV Survey Vessel: Fugro Adventurer & Bourbon Enterprise

Client: Qatar Petroleum & DOPET

Project: Fast Rescue Craft, Boat Landings at NFA and Mooring Piles Installation at PS-3 Field.

JUB: Seafox Matsu (ROV Construction Support, Navigational and Surface / Subsea Positioning)

Client: North Oil Company

Project: AS-BD Geophysical & ROV Shallow Imaging Survey at Al-Shaheen Field.

Vessel: Bourbon Enterprise

Procedures (Operation Plan, Quality Plan, QHSE Plan, Emergency Response Plan, HIRA Document, Bridging Document, H2S Emergency Plan, Mobilization & Demonization Plan)

Mobilization, Offshore Support & Demobilization;

Invoicing;

Review of DPRs, Field reports & Final Data / Document Dossier Reports, Charts, Videos / Final Deliverables as per Contract. 2020 February –

2021 April

Client: Qatargas Limited Company Ltd., Qatar Shell (QSGTL)

& Qatar Shell (QSSC)

Project: ROV underwater Pipelines, Cables & Structures Inspection Projects; Navigational, Surface & Subsea Positioning, ROV and Sector Scan Support for Rig Moves & Vessels Mobilization, Offshore Support and Demobilization; Procedures; Invoicing; Review & Submission of DPRs, Field Reports, Final Data / Document Dossier Reports, Charts, Videos & Final Deliverables as per Contract. 2019 November – Client: Qatar Shell (QSGTL)

2020 January Project: ROV underwater Pipelines, Cables & Structures Inspection Vessel: FS-106 (Near Shore Boat) & DP2 Nor Spring

Mobilization, Offshore Support & Demobilization of the Vessel at RLIC, Hamad Port & FSME Jetty.

Procedures (Operations Plan, Quality Plan, QHSE Plan, ERP, HIRA, Bridging Document, H2S Emergency Plan & Mobilization

& Demobilization Plan) and review DPRs, Field & Final Reports. 2019 August –

2019 November

Client: Qatar Gas South / RasGas (Nearshore) & Qatar Gas South Structures / RasGas

Project: ROV underwater Pipelines, Cables & Structures Inspection (ROV Project)

Vessel: FS-106 (Nearshore Boat) & DP2 Nor Spring

Mobilization, Offshore Support & Demobilization of the Vessel at FSME / RSIC Jetty

Procedures (Operations Plan, Quality Plan, QHSE Plan, ERP, HIRA, Bridging Document, H2S Emergency Plan, Mobilization & Demonization Plan) and review DPRs, Field & Final Reports. 2019 August – Client: Qatar Gas North

2019 December Project: ROV underwater Pipelines & Cables Inspection

(ROV Project)

Vessel: DP2 Crest Argus 1

Mobilization, Offshore Support & Demobilization of the Vessel at FSME, RLIC & Hamad Jetty’s

Procedures (Operations Plan, Quality Plan, QHSE Plan, ERP, HIRA, Bridging Document, H2S Emergency Plan, Mobilization & Demonization Plan) and review DPRs, Field & Final Reports. Fugro Survey Middle East Ltd

Project Engineer

2019 July – 2019

September

Client: Qatar Engineering & Construction Company (QCon) / Qatargas Limited Company Ltd.

Project: Replacement of Subsea Compression & Shear Fenders of 4 x Boat landings & Install clamps for wooden Fenders

(Diving Project)

Vessel: DP2 Topaz Rayyan

Mobilization, Offshore Support & Demobilization of the Diving Spread at Mesaieed Qcon Jetty onboard DP2 Vessel

Procedures (Execution Plan, Method Statement, HIRA, Bridging Document, QHSE & ERP Plan)

Review of Field Reports, DPRs, Final reports, videos and other deliverables.

2019 March – Client: Dubai Petroleum Establishment – UAE & Technip FMC

2019 June Project: AQAM Development Project and Associated Pipelines

Vessel: DP2 DSV Lichtenstein

Subsea Smart / Hot Tapping into Live 10” GL

Pipeline

Subsea Smart Flange’s installation

Subsea Spools Installations

DBB Valve Protection Frame’s Installations

Sleeper Installations / Relocations

Free Span Corrections with Grout bags

Grouting Operations on AQA Jacket

Pre-commissioning Activities (FCGH,

dewatering & Nitrogen Purging) subsea to

subsea, riser top to subsea

Double Block & Bleed Valves cycling operations

at Subsea Tie-in locations

Existing Spools recovery

2018 October – Client: Dubai Petroleum Establishment – UAE & Technip FMC

2019 February Project: Rashid D Development Project and Associated Pipelines

Vessel: DP2 DSV Picasso

Subsea Rigid Risers & Clamps Installations on RA & RC Platforms

Subsea Spool’s Installations at RA, RC, RD & SST

(Subsea Tie-in) Locations

Sleeper Installations / Relocations

Free Span Corrections with Grout bags

Grouting Operations on RD Jacket

Pre-commissioning Activities (FCGH, dewatering & Nitrogen Purging) subsea to subsea, riser top to

subsea

Double Block & Bleed Valves cycling operations at Subsea Tie-in locations

Valentine Maritime Gulf LLC

Project Methods Engineer / Senior Field Engineer

2018 June – Project: Various Projects

2018 September

Technical tender preparation

(coordinate/prepare preliminary method

statements, technical clarifications, execution

plan, feasibility study, etc.)

Project as-built documentation compilation

Development of Detailed Installation procedures

development for Typical Offshore Installations

2018 February – Client: ONGCL / LTHE – India

2018 May Project: Daman Development Project Barge: DLB 1600

Installation of 5 No’s Sub-Sea Rigid Pipeline Segments (Sizes vary from 8” – 18” with total approx.. length 70 KM)

As-laid Survey

Client: ONGCL / LTHE – India

Project: BW Pipeline Replacement Project – IV (BWPRP-IV) Barge: DLB 1600

Installation of 2 No’s Sub-Sea Rigid Pipeline Segments (12”x 16 KM)

As-laid Survey

2017 March – Client: KNPC / KIPIC & HSS JV – Kuwait 2018 January Project: Al-Zour New Refinery Project (NRP)- Package 5 Barge: DLB 1600

Subsea Rigid Pipeline Installation

1 no. 10” x 18 km

4 nos. 30” x 18 km (2 nos. Piggyback with 2 nos. FOC each)

Shore pulling 1.5 km (All Pipelines)

Braces with Clamps Installation

Stalk-on Riser Installation (1 no. 10” & 4 nos. 30”)

Flange Riser Installation (1 no. 10” & 4 nos. 30”)

J-Tube Installation (2 nos. 10” J-Tubes for 4 nos. FOC’s)

Tie-in Spool Installation (1 no. 10” & 4 nos. 30”)

4 nos. FOC’s pulling though J-Tubes & termination

2 nos. Riser Protector Installation

As-laid Survey & Free Span Correction

FCG & Hydro-testing of all Pipelines & As-built Survey 2016 May –

2017 February

Client: ADOC (Japan) – UAE & Technicas Reunidas (TR) Project: HAIL Surface Facilities EPS Project

Barge: Regina 250

Subsea Rigid Pipeline Installation between Mubarraz & Hail Islands (6”, 8” & 18” x 9.5 km /each)

Shore pulling 1.5 km at Hail Island

Shore pulling 0.8 km at Mubarraz Island

Normal lay till mid-line tie-in location (from both islands)

Surface / Mid-line Tie-in of all the Pipelines

4” Composite Cable lay x 9.5 km with DP-2 DSV

Concrete / Pipeline Stabilization Mattress Installation Cable Stabilization Blocks, Free Span Correction & Buckle Mitigation Sleepers

Cable Stabilization Blocks, Free Span Correction & Buckle Mitigation Sleepers

Pre-commissioning Activities & As-built Survey

Client: ADMA & Petrofac

Project: SARB-3 Project

Approx. 200 KM Pipeline Segments

(12” – 48”)

2014 October –

2016 April

Client: ONGCL – India

Project: MHNRD-III PLP

Barges: Regina 250 & Kruez Supporter

Vessels: DP2 DSV Kreuz Installer & DP2 DSV Seamec 2

Installation of 19 No’s Sub-Sea Rigid Pipeline Segments

(Sizes from 6” – 20”) of total approx... length 170 KM

Umbilical Piggyback with 20” P/L and SSIV installation (Welded to 20” P/L while laying)

Laterals & Piggable Wye with Protection Cages Installation

Riser Protector’s & Boat Landing Installations

PLEM (Pile Driven) Installation

Riser’s, Sump Caisson & Fire Water Pump Demolition

Risers & Spools Installation

Free Span Correction & Crossings

Pre-commissioning Activities (FCG Dewatering &

Nitrogen Purging)

Leighton Offshore Construction Pte. Ltd

Project Engineer/ Installation Engineer

2013 October – Client: South Oil Company - Iraq

2014 September Project: Sealine Project (Phase-3)

Barge: DLB 1600; Vessel: DP2 HLV / DLV Oceanic 5000 Installation of:

Valve Station-1 (VS-1) Jacket & Boat Landing

Valve Station-1 (VS-1) Topside (Single Lift - MSF Deck, Module 1, Module 2, Module 3) 3250 MT

Valve Station-2 (VS-2) Substructure

Valve Station-2 (VS-2) Topside & VS-2 Boat landing

VS-1 to existing LQ Bridge Support Sub-Structure

VS-1 to existing LQ Bridge Support Topside

VS-1 to existing LQ Bridge

VS-2 to existing KAOOT Bridge

2013 April –

2013 September

Client: Shell Eastern Pte Ltd – Singapore

Project: Shell Bukom 48” Pipeline Repair Project

Barge: Leighton PLB Stealth

Vessel: DP2 DSV Altus Exertus

De-oiling of Existing SPM, PLEM, Hoses and 48” Pipeline (5.2 KM)

Removal & Transportation of Existing SPM, Old PLEM and Hoses

Removal of 50mtr of Existing pipeline for Midline Tie-in with New Pipeline Segment

Inspection of Existing Mooring Chains (in-situ)

Installation of new 48” pipeline (2.7 KM), FCG and Hydro testing

Installation of concrete mattress

Install Midline tie-in spool,

New PLEM (Gravity based) and tie-in spool with P/L

Re-installation of refurbished SBM, Subsea and Floating Hoses & Final leak test of SBM

Removal of Existing 2.7 KM 48” pipeline (Using DWCM) 2011 October –

2012 March

2012 April –

2013 March

Client: ONGCL – India

Project: B193 SS & PP PLP

Barge: Swiber PLB Concorde & Swiber PLB Conquest

Installation of 7 No’s Sub-Sea Rigid Pipeline Segments (Sizes from 12” – 24”) of total approx... length 90 KM with Rigid P/L (2” & 3”) Piggyback Pipelines

Riser Protector’s Installation

Client: ONGCL

Project: Cluster-7 PLP

Barge: Swiber DLB 1MAS 300

Installation of 16 No’s Sub-Sea Rigid Pipeline Segments (Sizes from 4” – 20”) of total approx... length 140 KM

Riser Protector’s Installation

PLEM (Pile Driven) Installation

Client: ONGCL & ESSAR - India

Project: D1 Development Project

Barge: Swiber DLB PJW 3000 & DP2 HLV Magnificent

Installation of D1-B Jacket & Topside

Installation of D1-C Jacket & Topside

Installation of D1-D Jacket & Topside

Installation of D1-B – Existing D1 Bridge

Installation of associated Riser Protectors & Boatlanding’s 2010 June –

2011 September

Client ONGCL - India

Project: MHNRD-II Project

Barge: PLB Swiber Conquest

Installation of 14 No’s Sub-Sea Rigid Pipeline Segments (Sizes from 6” – 16”) of total approx... length 75 KM

Client: Cairn Energy & ONGCL – India

Project: North Tapti Project

Barge: Accommodation Work Barge Swiber Victorious

Installation of 6 No’s 18” Stalk-On Risers with Pile Supports

Removal and Re-Installation of Riser Protectors

References

Paul Elliott (Senior Project Manager, Fugro);

*.*******@*****.***

+974-****-****

Mark Impey (QHSSE Manager, Fugro);

*.*****@*****.***

+974-****-****

Hemant Patil (Project Manager, Fugro);

*.*****@*****.***

+91-730**-*****

Ghassan Joudeh (Senior Project Manager, Jacobs); *********@*****.***

+971-**-***-****

Resham Lal (Senior Construction Manager, Subsea7); *********@*****.**.**

+966-**-***-****

Ramesh Polnaya (Offshore CSR, ADNOC);

************@*****.**.**

+91-636**-*****

A V Ramana Rao (Senior Project Manager, NPCC);

***********@*****.***

+91-817**-*****

Vijay Verma (Senior Project Engineer, Technip FMC); ***********@*****.***

+91-983**-*****

Kim Stephen Elliott (Senior Barge Superintendent); *******@*****.**.**

+34-67-323-****

I hereby certify that all the information that has been provided above is true and to the best of my knowledge.

Sandeep Gangavaram



Contact this candidate