Post Job Free

Resume

Sign in

Qc piping inspector

Location:
Gainesville, GA
Posted:
February 27, 2022

Contact this candidate

Resume:

CARLO I. TAÑADA

**** ********** *****, ********** ** 30504

E-Mail Address: adqcly@r.postjobfree.com

Mobile Number: 770-***-****

Position Desired

oQA/QC PIPING INSPECTOR/ SENIOR QC ENGINEER

Objective

oTo serve as a challenging and rewarding position wherein my inner and outer personal relationships will be utilized.

oTo utilize my professional experience in a progressive growth-oriented company to work for organization that recognizes individual abilities, talents and accomplishments.

QUALIFICATIONS:

oBachelor of Science in Mechanical Engineering with more than 10 years of experience in Oil and Gas industries in the Philippines and overseas (Saudi Arabia, Africa, Qatar, UAE and Turkmenistan).

oExtensive Knowledge with Inspection, Corrosion/NDT functions.

oExtensive knowledge of P&ID and Isometric drawing symbols and development.

oStudy of Inspection guides, codes, standards, Inspection manuals, Inspection work list, and Inspection Reports.

oExtensive knowledge in piping (Seamless & ERW) and very well versed in standards such as API, ASTM and ISO 9001 (QMS).

oHandled three disciplines of engineering duties such as Mechanical, Structural/Civil and Piping works.

oConversant with the standard computer software packages. Proven communications and interpersonal skills and customer-orientated approach and ability to use MS office to provide written reports and maintenance of QC records.

oManage own work, time and development.

oWork effectively in Teams.

oCommunication and Presentation.

oProblem Solving and decision making

oHandling conflict and stress.

oLeadership and Motivation.

oEnglish Language Proficiency

WORKING EXPERIENCE:

NAME OF EMPLOYER : HYUNDAI ENGINEERING

PROJECT TITLE : HYUNDAI TGEM PROJECT

PROJECT ADDRESS : KIYANLY, TURKMENISTAN

INCLUSIVE DATE : February 17, 2014 – DECEMBER 23, 2015

POSITION : QA/QC PIPING INSPECTOR

MATERIAL INSPECTOR

NAME OF EMPLOYER : GS ENGINEERING

PROJECT TITLE : RRE2 SMP1 ALRUWAIS

PROJECT ADDRESS : Al Ruwais, ABU DHABI

INCLUSIVE DATE : August 13, 2011 – June 16, 2012

POSITION : QA/QC PIPING INSPECTOR

NAME OF EMPLOYER : KENTZ MADAGASCAR

PROJECT TITLE : AMBATOVY PROJECT

PROJECT ADDRESS : AFRICA MADAGASCAR

INCLUSIVE DATE : NOVEMBER 9, 2010 – MARCH 2, 2011

POSITION QA/QC PIPING INSPECTOR/

SENIOR QC INSPECTOR

NAME OF EMPLOYER : GAMA QATAR Linde Shell

PROJECT TITLE : PEARL (GTL) GAS TO LIQUID PROJECT

PROJECT ADDRESS : Ras Laffnn Industrial City, Qatar

INCLUSIVE DATE : June 3, 2008 – June 19, 2009

POSITION : QA/QC PIPING INSPECTOR

NAME OF EMPLOYER : CONSOLIDATED CONTRACTORS WLL PROJECT TITLE : KHURSANIYAH GAS PLANT PROJECT

PROJECT ADDRESS : JUBAIL, KINGDOM OF SAUDI ARABIA

INCLUSIVE DATE : JANUARY 16, 2006 – JANUARY 16, 2007

POSITION : QA/QC PIPING INSPECTOR

NAME OF EMPLOYER : ENGINEERING & EQUIPMENT INC. (EEI)

PROJECT TITLE : BTX – PROJECT

PROJECT ADDRESS : LIMAY, BATAAN, PHILIPPINES

INCLUSIVE DATES : JULY 1998 – MAY 2005

POSITION : SENIOR QC ENGINEER

JOB DUTIES AND RESPONSIBILITIES:

MAIN RESPONSIBILITY:

Responsible for the monitoring of suppliers/contractor’s inspection activities relevant to the process and utility piping and mechanical systems to ensure that Project installation, fabrication and commissioning requirements are met. Attend to inspections and tests, according to the approved ITP, verifying the inspection reports and validating the results.

OTHER ACTIVITIES:

Maintaining contacts with other disciplines for QC issues inner his Team and Inspection on-site.

Assess Contractor’s QC team performances on site(s) and the share assessment report with project QC Coordinator. Provide QC and Inspection input as required.

JOB DESCRIPTION/RESPONSIBILITIES:

oEnsure that Contractor personnel attend Safety Talk prior work commencement and adhere to all relevant local HSE requirements/procedures. Ensure that relevant PPE is used.

oReview piping and mechanical work-pack Documentation Requirements for Installation, Fabrication, Testing and Inspection to ensure that all the verifications have been carried out and the appropriate check list been completed and signed off properly;

oReview specifications, codes, standards, procedures and verify where exceptions are taken together with the necessary engineering approval sign off. Ensure all referenced documents (latest revisions) are included in the work pack and that the Installation/Fabrication Contractor understands and complies with the requirements for specification and quality;

oReview the Isometric drawing for the piping and mechanical installation to ensure that the latest revision of the isometric drawings is included in the work pack.

oVerify that Contractors material traceability and inspection/testing documentation is properly developed in accordance with the Project procedures. Verify materials correlation with certificates and compliance with codes and approved specifications. Review the material list for the work pack with respect to the Isometric Drawing definition description

oMonitor suppliers/contractors works for compliance to ensure that all required NDT examination are carried out by the contractor in accordance to the approved ITP, review and approve the reports issued. Ensure that the respective NDT level inspectors witness UT and review Radiographic films where required by the ITP ensuring that NDT results meet the specified requirements.

oCoordinate and inspect the piping mechanical arrangement and alignment are in line with the design parameters definition requirements. Monitor the final visual and dimensional checks of completed piping systems;

oAttend hydro testing of piping and mechanical systems and sub-systems.

oInspection of unfired pressure vessels, heat exchanges, Condenser, Coolers, Direct-Fired Boilers, Auxiliary Equipment, Fired Heaters, and Stacks, Pumps, Compressors, Blowers, and their Drives, Pipes Valves, and Fittings.

oCoordinate and review the work pack completion inspection and documentation required for final acceptance and contract close out. Where requirements for Punch Listing ensue, develop work pack Punch List closes out. Ensure that the mechanical completion dossier is duly completed.

oAdvise promptly QA/QC Engineer of any quality related problem, deviation or non-compliance.

oDefine requirements for preservation of the piping and mechanical installations prior to commissioning, start up and hand over of the work pack as part of a system or sub-system.

oShutdown preparation including Shutdown Inspection work list preparation.

AMAZON October 2021 – January 2022

WAREHOUSE ASSOCIATE

ADECCO January 2022 – February 2022

ASSEMBLER

TRAININGS / SEMINARS:

Title : Housekeeping and Safety

Venue : Khursaniyah, KSA

Date : October 11, 2006

EDUCATIONAL ATTAINMENT:

COLLEGE : MANUEL L. QUEZON UNIVERSITY

COURSE : BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING

Quiapo, Metro Manila, Philippines

SCHOOL YEAR 1986-1993

SECONDARY : BATAAN NATIONAL HIGH SCHOOL

Roman Super Hi-way, Balanga City, Bataan Philippines

SCHOOL YEAR 1982-1986

ELEMENTARY : CALAGUIMAN ELEMENTARY SCHOOL

Samal, Bataan, Philippines

SCHOOL YEAR1976-1982

PERSONAL INFORMATION:

Date of Birth : September 22, 1969

Place of Birth : Calaguiman, Samal, Bataan Philippines

Age : 51 years old

Civil Status : Married



Contact this candidate