Post Job Free

Resume

Sign in

Power Plant Electrical Engineer

Location:
Ahmedabad, Gujarat, India
Posted:
February 26, 2022

Contact this candidate

Resume:

Career Timeline

*) Arni Engineering Tech(P) Ltd at JSW(PORT) site of Jaigad Ratnagiri Maharastra from 21 jan 2022 to Till now.

2) Innove Source private limited

At JSW site of Jaigad Ratnagiri Maharastra

From 26 oct’2020 to till 20 jan 2022.

3) Reliance Industries Limited

Jamnagar Gujarat from oct’ 2018 to oct’ 2020.

4) Powermech projects limited at site of CGPL (Tata Power) from sep’2016 to sep’2018 Mundra Gujarat.

5) Chennai Radha Engineering works private limited at site of CGPL (Tata Power) from AUG’2015 to AUG’2016 Mundra Gujarat.

6) KGPS Mechanical Private Limited at site of CGPL (Tata Power) from JUL’2014 to JUL’2015 Mundra Gujarat.

Profile Summary

Offering over 7+ years of experience

Expertise in providing direction & structure for operating units in the field of Power Distribution and HT Sub-Stations / Thermal Power Stations,, Oil & Gas, PORT Material Handling system.

Excellent knowledge in maintenance planning for total productive & Utility maintenance, & Deft in Material Handling Equipment Maintenance.

Experienced with the concepts of maintenance of all electrical equipments to achieve maximum availability

Developed competency in directing & supervising the execution of the electrical minor changes in accordance with company standards

Proficient in managing operation & maintenance and troubleshooting of Power System Products/ EPC Power Project Activities involving resource planning, in-process inspection, team building in co-ordination with Internal / External Departments; proven competency in diagnosing & repairing major faults and breakdowns

Management and preparation of CBM, Predictive and Preventive maintenance schedules, checklists, job safety analysis, Hira,Hitra standard operating procedures, Standard Maintenance Procedures and spares list

Experience in coordinating with electrical subcontractors, providing timely work fronts, supervising & validating their work progress; possess expertise in understanding the status of site progress and supporting the Site Team during execution

An effective communicator with excellent relationship management skills and strong analytical, problem-solving & organizational capabilities

Core Competencies

Day to Day PM,CBM & troubleshooting

Project Management

Shutdown Planning & Management

Operations and Maintenance

Spare Management for Reducing Breakdown

Cross-functional Coordination

Statutory/Regulatory Compliance

Site Management

Reporting & Documentation

Organization Experience

Since 26 Oct’ 2020 At site of JSW Port Ratnagiri Maharastra as Electrical Engineer

Operation and maintenance of Electrical Systems in JSW port Jaigad Maharastra

Key Result Areas:

Planning & implementing the preventive & breakdown maintenance schedules for improving overall reliability and safety.

Conducting failure investigation analysis to identify gaps & take corrective measures so as to reduce equipment downtime & maximise plant availability.

Identifying areas of obstruction / defects and conducting service and repair to rectify the equipments through the application of troubleshooting tools.

Operation & Maintenance, Erection/Testing/Commissioning of all electrical equipment including HT/LT Switchboards, HT/LT Motors, Power & Distribution Transformer, ACB, VCB etc.

Taken ownership in 5s, safety TPM activity & Energy Management to maintain safe and healthy work environment by enforcing standards.

Accountabilities-

Troubleshooting & Maintenance of Conveyor safety device PCS, BSS, ZSS, RD.

Operation &Maintenance of FLSMIDTH & ZPMC made Stacker cum Reclaimer.

Belts weigh scale controller settings and calibrations & tarring done .

Operation & Maintenance of Material handling system.

Day to Day PM & trouble shooting of Electrical & Instrumentation equipments.

Oct’2018 to 24 Oct’ 2020 with Reliance Industries Ltd., Jamnagar as Electrical Maintenance Engineer

Operation and maintenance of Electrical Systems in Sulphur Complex of Reliance Refinery in Jamnagar

Key Result Areas:

Managing and Planning of Effective Conditioning & Monitoring, Predictive and Preventive Maintenance Schedules and supervising site activities

Monitoring and executing projects with respect to budgeted cost, demand forecasts & time overruns to ensure their timely execution

Troubleshot and maintained Oil type and Dry Type Transformers up to 31.5MVA, HV and LV Switchgears (11KV, 6.6KV and 0.415KV), Protection/Control Panels

Managed effective maintenance of electrical equipment like Circuit Breakers VCB, ACB, CT, PT, LA, Relays, HV and LV Motors, Bus Ducts, NGR,, Battery Chargers, Battery Banks and UPS, DG Sets, Air Compressors, Air Drier units and its Control Panels

Conducting cost benefit analysis of the projects including feasibility studies, assessment of the requirements, interface and Maintenance

Anchoring on-site erection & commissioning of plants and ensuring effective resource utilization to maximize the output; ascertaining compliance to safety, economical and technical assessments to secure the best economical results.

Oct’16-Sep’18 with POWERMECH PROJECS Ltd., Mundra TATA POWER (CGPL) Plant Maintenance Engineer

Key Result Areas:

Administrated Operations and Maintenance of 11KV / 415V Substaions.

Troubleshot and maintained Dry Type Transformers up to 1600KVA, HV and LV Switchgears (11KV, and 0.415KV), Protection/Control Panels.

Managed effective maintenance of electrical equipment like Circuit Breakers VCB, ACB, LBS, Isolators, VFD Siemens (G120,G130), CT, PT, Relays, HV and LV Motors, APFC Panels, Bus Ducts, NGR, Battery Chargers, Battery Banks and UPS, DG Sets, Air Compressors, and its Control Panels.

Experienced in permit to work system, hazards related to working area, authorized to do works like Electrical, Mechanical, Hazardous, Confined, Hot, Height, LOA works.

Measured the performance of equipment through CBM and improvement tools like TPM, and IMS.

Prepared daily and monthly energy consumption reports, maintenance history, trip reports of all the equipment, CBM activity, TPM, 5S, safety and internal audits.

Highlights:

Directed managing, planning of Effective Conditioning & Monitoring, Predictive and Preventive Maintenance Schedules and supervising of site activities.

Trained Technicians and Workers for Job Safety Analysis, Hira, Permit to Work System, LOTO and standard operating and maintenance procedures on daily basis to Achieve ZERO HARM CULTURE and achieve Maximum Availability of Equipment.

Aug’15-Aug’16 Chennai Radha Engineering Works Private Limited Mundra as Electrical Engineer

Managed work related to engineering, Operation & Maintenance of 5 Units of 800*5 MW Coal handling Thermal Power Plant Mundra CGPL (A Company of TATA Power).

Aug’14-JUL’15 KGPS Mechanical Private Limited Mundra as Electrical Engineer

Managed work related to engineering, Operation & Maintenance of 5 Units of 800*5 MW Coal handling Thermal Power Plant Mundra CGPL (A Company of TATA Power).

Key Result Areas:

Conduucted TBT, Talks with technicians and workers for safety awareness on a daily basis.

Troubleshooting & Maintenance of Conveyor safety device PCS, BSS, ZSS, RD, Control Valves/MOVs, Auma Actuators, SOVs,Coal feeder instruments, pressure switches, RTD’s & FDAS system.

Operation &Maintenance of FLSMIDTH made Stacker cum Reclaimer, (6800 MT stacking & 4500 reclaiming capacity).

Belts weigh scale controller settings and calibrations & tarring done .(Schenck make).

Operation & Maintenance of 14 KM long coal handling system (with 6 Substation).

Day to Day PM & trouble shooting of Electrical & Instrumentation equipment’s.

Acting as a responsible COORDINATOR between client and our company for planning and Execution of Electrical Activities in time with Safety. Ensuring necessary method statements, quality and safety Documentation are developed and are approved before start of work.

Responsible for day-to-day break down problems.

Responsible to prepare shud-down planning and execution.

Responsible to maintain proper safety at work place.

Responsible to prepare daily reports and check lists.

Responsible to maintain the logbook.

Responsible to supervise the electrician etc.

Performed:

Inspection of control & relay panel and preparing test reports for power plant testing

Erection, testing, pre-commissioning checks and commissioning of:

Power Transformers and Dry type Transformers up to 1600 KVA

HV & LV Switchgears (0.415KV and 11KV)

HV & LV Motors up to 1 MW

Checking stability of power transformer, HT motors and generators

Troubleshooting of Electrical control and protection circuits

Scheduled monitoring and Preventive maintenance of Switchgears, Circuit Breakers, Transformers and Motors to achieve maximum availability of drives during operations

Engaged in fault finding & analysis of fault and corrective maintenance during breakdown

Tested and commissioned:

Relay Protection Panels and Electrical Control Panels

All electrical equipment up to 11KV

Starter Panels for DC Auxiliaries, Variable Frequency Drives.

Highlights:

Operation & Maintenance of FLSMIDTH make Stacker-Reclaimer & Conveyor System.

LT Motor with Siemens make 1000 KW VFD for Conveyor System.

All Power & Distribution Transformers, HV & LV Switchgears, Electrical Control Panel, HV & LV Motors and MLDBs in BOP of all 7 Substaion in time frame.

Battery Banks, UPS and Battery Charger.

Ensured the implementation of engineering lessons learnt from past projects & Maintenance and value-added engineering for a high net-worth project.

Academic Details

B.Tech in Electrical & Electronics Engineering from Venkateswara Institute of Technology, Meerut (Uttar Pradesh) affiliated to Uttar Pradesh Technical University with First Grade in the year 2014.

Completed 12th examination from S.B.M.I.C.D Nagar Naini Allahabad (U.P), and secured First Grade in the year 2009.

Completed 10th examination from Shivaji I.C.P. Nagar K. Khurd Allahabad (U.P) and secured First Grade in the year 2007.

Equipment Purview

Hands on Experience of:

ABB, SIEMENS, SCHNEIDER, L&T make Circuit Breakers and MICOM, SIEMENS and make Relays, LT & HT substation all equipments, Stacker & Reclaimer all equpments, LOTO system and procedure.

IT SKILLs: MS-Office Applications, Permit in SAP system & Internet surfing etc.

Personal Details

DOB: 10th JULY 1992

Languages Known: English, Hindi

Passport – Available if Required

Address: Harwari Lakhapur Post –Palpatti Meja Prayagraj India Pin Code- 212106

ANURAG SHUKLA

ELECTRICAL MAINTENANCE ENGINEER

Result-oriented professional, targeting challenging assignments in Erection, Testing& Commissioning, Operation & Maintenance with an organization of high repute

adqb4y@r.postjobfree.com

+918*********

+919*********



Contact this candidate