Post Job Free
Sign in

Saudi Aramco Civil Engineer

Location:
Philippines
Posted:
February 21, 2022

Contact this candidate

Resume:

Marcelo M. Santos Jr.

CIVIL ENGINEER

PRC REG. NO. 0084738

*** *. *. ****** ********-3, Calipahan

**** ********, ***** *****

Philippines

Mobile No. : +639**-***-****

Email Address: ****************@*****.***

: ****.****@*****.***

YEARS OF EXPERIENCE: 22 years

1)Objective:

To be a part of a company which I can share and impart my service and promote advancement of my profession.

2)Work Skills:

Office Works:

Reviewing Bid Tender/Contract Documents and preparing Project Bid Synopsis.

Identifying scope of works, materials, manpower and equipment resources requirements.

Producing bill of quantities/quantity take-off for civil/roads/ earthwork/site/underground utility/ landscaping, various civil structures of residential, commercial, industrial oil and gas on-shore and offshore, architectural and mechanical steel structures.

Interpreting Plans, Drawings and Contract specifications.

Preparing materials or subcontract cost inquiry/quotation base on Drawings, specifications and other contract conditions and coordinating with materials supplier or subcontractor.

Evaluate tenders and preparing Bid Queries and Clarifications.

Analyzing Equipment & Man Hour productivity rate.

Preparing comparative cost report of materials and subcontract price from different Suppliers and Subcontractors.

Estimating Cost of materials, labor and equipment on master format spreadsheet.

Preparing project activity schedule.

Attend site visit and prepare site visit report.

Works on claims

Preparing Weekly and Monthly Progress Report

Prepare and evaluate Monthly billing for subcontractors

Update schedule using Primavera

Preparing detail drawings using auto-cad software

Preparing various construction documents, drawings, specifications, etc.

Correspondence, method statements etc.

Site Works:

Site office: Evaluating subcontractors monthly progress billing, preparing daily, weekly and monthly progress reports, preparing transmittals, wms, rfi, site inquiry, ncr, site instruction, commissioning package, correspondence etc.

Project site: Subcontractor or Direct Manpower Supervision, Work Permit, Materials and Work Quality Inspection, Land Surveying.

3)Computer skills:

MS Word & Excel, AutoCAD, SketchUp, Primavera & basic Staad Pro.

4)Project Site & Bid Experience:

Industrial: BID EXPERIENCE -Saudi Aramco, Royal Commission of Jubail, Sabic, Saudi Kayan, Ma’aden, etc.

SITE EXPERIENCE – QAFCO-5&6 Qatar Fertilizer Project, Borouge-3 Abu Dhabi Polymers Project.

Commercial: BID EXPERIENCE -Malls and Shopping Center, Hotels, Hospitals, Universities and Colleges, Banks, Government Buildings, Commercial Buildings and Offices.

Residential: BID&SITE EXPERIENCE -Socialized and High-End Subdivision Project (Housing, Land Development and amenities), villas, residential building.

Horizontal Projects: SITE EXPERIENCE -Roads, Small Water Impounding Projects, Mini Dam, Box Culverts-Bridge, Drainage, Marine Jetty Site Office Works, Retaining Wall and other Civil Works.

5)Work Experience :

July 2013 - up to present (Head - Eng'g. and Const. Department)

Company: AMPARO REALTY & CONST. CORP. (North Grove Project)

Employer: MR ALFREDO G. LIBUNAO JR.

Project: HIGH END SUBDIVISION

Project Location: Valdefuente, CABANATUAN CITY

Project Engineer

Checking building drawings, design, bill of materials, specifications, and other permit requirements documents.

preparing requirements for acquiring local government Building Permits.

Preparing construction schedule and monitoring progress of work.

Preparing quantity takes off and cost for the projects.

Checking weekly progress payment.

Preparing work schedule of engineering team.

supervising engineers and architect for project.

checking the accuracy of lot plan and measurements.

decide on details

Oct 2012 - Jan 2013 (CONTRACTOR)

Employer: MR & MRS. JM & BABY JANE DUMARAOS

Project: 2-Storey Building with Amenities

Project Location: Banaba South BATANGAS CITY

Project Engineer

Preparing building drawings, design, bill of materials, specifications, and other permit requirements documents.

Acquiring local government Building Permits.

Preparing construction schedule and monitoring progress of work.

Preparing quantity takes off and cost for the projects.

Direct supervision of the project.

Preparing materials purchase order for the projects.

Preparing daily work schedule and manpower daily activities.

Direct supervision for project

May 2012 – up to present (CONSULTANT)

Company: MARJHONE CONSTRUCTION

Office Address: San Leonardo Nueva Ecija Philippines

Project: Roads and Drainage Project Cabanatuan City

Project Manager

Preparing budget requirement and cost for the projects.

Preparing work schedule and manpower requirements.

Preparing technical staff requirements and their respective duties and responsibilities.

Directing engineering staff in their weekly and monthly target schedule.

Checking and reviewing contract documents, specifications and correspondences.

April 2011 – May 2012 (13 months)

Company: HYUNDAI ENGINEERING AND CONSTRUCTION (HDEC)

Office Address: P.O. BOX 46101 Ruwais Abu Dhabi, UAE

Project: Borouge-3 Abu Dhabi Polymers Company

Civil Section –Quantity Surveyor – Planning Engineer onS/ofS

Preparing daily, weekly and monthly progress report.

Checking subcontractor’s monthly progress billing.

Quantifying materials for civil structures.

Quantifying earthworks for site preparation and excavation.

Recording and preparing reports of delivery notes for concrete, steel reinforcement and anchor bolts.

Preparing weekly 3-weeks look ahead.

Works on claims

February 2009 – February 2011 (24 months)

Company: HYUNDAI ENGINEERING AND CONSTRUCTION (HDEC)

Office Address: P.O. BOX 50167 Mesaieed, QATAR

Project: QAFCO-5&6 Qatar Fertilizer Company

Jetty Section – Quantity Surveyor – Planning Engineer onS/ofS

Civil Section - Civil Engineer - Supervisor

Jetty- preparing daily progress report and checking monthly progress billing.

Preparing document requirements, discuss and obtaining Permit to Work from (Kahramaa) Water & Electricity and (QP) Qatar Petroleum.

Preparing, filing and organizing of documents (site transmittals, FDN, correspondences, etc.).

Coordinating for the preparation and close-out of punch lists

Jetty/Civil - preparing documents like Work Method Statement, Non-Conformance Report, correspondence etc.

Preparing pre-commissioning and commissioning packages.

Site supervision for civil works.

Works on claims

April 2007 - December 2008 (20 months)

Company: MODERN ARAB CONSTRUCTION COMPANY LTD. (MAC)

Office Address: PO BOX 855 AL-KHOBAR 31952 KSA

Projects: Saudi Aramco, Royal Commission of Jubail, Sabic, Saudi Kayan, Ma’aden, etc.

Estimator/Quantity Surveyor - Estimator

Preparing Project Bid Synopsis and Clarification.

Preparing Materials and Subcontract Price Inquiry.

Measuring materials on Site, Civil, Building, Structural, Underground Utilities and Architectural Works.

Preparing the Estimate Cost of Materials, Labor and Equipment on Master Format spreadsheet.

Attend Site Visit and preparing written report.

Reviewing Bid Tender Documents, Scope of Works, Contract, Specifications, etc.

May 2005 - February 2007 (21 months)

Company: AL SWAYEH COMPANY LTD.

Office Address: PO BOX 2003 RIYADH 11451 KSA

Projects: Malls and Shopping Centers, Roads, Hotels, Hospitals, Universities and Colleges, Banks, Government Buildings, Commercial Buildings and Offices.

Estimator / Quantity Surveyor - Estimator

Preparing Project Information Sheet.

Measuring quantity of materials for Landscaping, Site, Civil, Building, Structural, Utilities and Architectural Works.

Reviewing Bid Tender Documents, Scope of Works, Contract, Specifications, etc.

June 1996 – Sept 2000 & July 2003 - Feb. 2005 (70 months)

Company: AGL REALTY AND DEVELOPMENT CORPORATION (AGL)

Projects : AGL HEIGHTS-II, Cabanatuan City and AGL Heights-GSIS CITY, Urdaneta City

Project Engineer / Project Manager

Preparing budget requirement and monitoring control of the time, quality and cost for the projects. Meeting the Company objectives, identifying and mitigating the risk.

Preparing work schedule and manpower requirements.

Preparing technical staff requirements and their respective duties and responsibilities.

Directing engineering staff in their weekly and monthly target schedule.

Preparing contract documents, specifications and correspondences.

Verifying and negotiating with contractor’s contract proposal.

Jan 2003 - May 2003 (4 months)

Employer: MRS. CATALINA OANES

Project: 2-Storey Residential Unit

Project Location: Narra 1, Bitas CABANATUAN CITY

Contractor

Preparing building drawings, design, specifications, and contract documents. Permits and others building documents requirements.

Preparing construction schedule and monitoring progress of work.

Preparing quantity takes off and cost for the projects.

Preparing work schedule and manpower requirements.

Managing cost control.

Direct supervision for project implementation.

Feb 2002 – Sept 2002 (7 months)

Company: McDARMONT CONSTRUCTION INTERNATIONAL INC. (MCI)

Project : TOSHIBA Building, Laguna Techno Park, Sta Rosa- Biňan LAGUNA

Project Engineer

Conducting interview and selecting applicants to hire for the supply of manpower requirements in the project.

Preparing materials requirement, budget cost and duration schedule.

Monitoring progress work and directly supervising labor force.

Preparing materials list for purchase order and manpower payroll.

Preparing safety requirements for workers and working environment.

Cost controlling and project progress work monitoring.

Dec 1993 – March 1995 & April 2001 - Dec 2001 (23 months)

Company: DVF CONSTRUCTION AND DEVELOPMENT CORP. (DVF)

Projects: DVF HOMES/PALUDPOD BRIDGE/ SWIP - Mini Dam

Project Locations: Lupao, NUEVA ECIJA / Talavera NUEVA ECIJA

Project Engineer

Preparing quantity takes off and controlling cost for the projects.

Preparing work schedule and manpower requirements.

Controlling quality based on drawings and specifications.

Control of materials, manpower and equipment utilization.

Preparing weekly report and contractors billing.

Direct supervision for the project.

Provide survey control and references using survey equipment.

Nov 2000 – March 2001 (4 months)

Employer: MR& MRS RAYMUNDO AGUILAR

Project: 2-Storey Residential Unit

Project Location: GAPAN CITY

Contractor

Preparing building drawings, design, specifications, contract documents, permits and others building documents requirements.

Preparing take off, project cost and duration schedule.

Cost controlling and monitoring progress work accomplishment.

Preparing materials purchase order for the projects.

Preparing daily work schedule and manpower daily activities.

Direct supervision for project

May 1995 – May 1996 (12 months)

Company: OMICO CORPORATION/DVF CONTRUCTION & DEV’T CORP.

Project: OMICO HOMES

Project Location: Sta Rosa, Nueva Ecija

Project Engineer

Inspecting daily work of subcontractor and workers under administration.

Monitoring work progress and preparing daily progress report.

Preparing quantity take off and budgetary cost of the project.

Preparing weekly work schedule and manpower requirements.

Preparing and verify weekly contractors billing.

Preparing weekly summary progress report.

Preparing shop and detailed drawings.

March 1993 – Sept 1993 (6 months)

Employer: PHILIPPINE RICE RESEARCH INSTITUTE (PRRI)

Projects: STAFF HOUSING, ROADS AND DRAINAGE

Project Location: MUŇOZ SCIENCE CITY

Site Engineer

Inspecting the daily work schedule on site and its quality workmanship.

Assigning daily work activity schedule and supervising site workers.

Prepare shop and detailed drawings

Providing elevations and reference lines using survey instruments.

Monitoring quality of materials and workmanship for the project.

Dec 1991 – Aug 1992 (8 months)

Employer: RAMTRANSIT INCORPORATION (RAMTRANS)

Project: RAMTRANS BUS TERMINAL

Project Location: M. dela Cruz Street PASAY CITY

Site Engineer

Inspecting the daily work activities on site and check the quality workmanship

Assigning daily work schedule of activities for manpower

Supervising workers on site

Prepare detailed drawings and plans for the project

Preparing all the documents requirements for permits and licenses

Preparing materials take-off and requisition

June 1990 – June 1991 (12 months)

Employer: CIC CONST. / ASIA KONSTRUCT / TAISEI CORPORATION

Project: PHILIPPINE RICE RESEARCH INSTITUTE

Project Location: Maligaya MUŇOZ SCIENCE CITY

Land Surveyor / Site Engineer

Assigning daily work activity schedule on site

Checking the quality of works and workmanship

Supervising workers on site

Provide controls for layout using surveying instruments

I hereby confessed that the above information are true and correct to the best of my knowledge.

MARCELO M. SANTOS JR.



Contact this candidate