Post Job Free

Resume

Sign in

Gas Co Mechanical Supervisor

Location:
Cairo, Cairo Governorate, Egypt
Posted:
May 29, 2022

Contact this candidate

Resume:

Page * of **

MOHAMMAD ABD AL SALAM AL GINDI

E-Mail: adq706@r.postjobfree.com

adq706@r.postjobfree.com

Mobile: +2-012********

Home Tel.: +202 – 44782085

__

PERSONAL INFORMATION

Date of Birth: October 13th 1956

Marital Status: Married

Passport No.: A03014455

Language: Arabic-English-French

EDUCATION

B.Sc. Mechanical Engineering – Helwan University, Egypt 1980

Master in Management Science-Sadat Academy, Egypt 1998

Diploma Engineering in Metal Corrosion &Protection- AL Azhar University, Egypt 2004

Good computer skills including experience with MS Excel & MS Word PROFESSIONAL QUALIFICATIONS

CSWIP 3.1 Welding Inspection-WIS 5 EG.

Aircraft manufacturing inspection course, Embraer CO-Brazil,1985.

Welding technology course, Arabic institute of technology, A.O.I- Cairo,1989

First middle east international quality assurance conference, Bahrain,1990.

Quality measurement tools calibration course-NIS,1993.

Painting & coating inspection course, 1994. Arabic institute of technology, A.O.I-Cairo

External &Internal quality system auditor, ISO 9000-TUV 1995. Egypt

Quality management representative Course-TUV 1995, Egypt

Visual inspection course for welding, 1995.Quality control CO.

Dye pent rant testing, Level II of ASNT.

Magnetic particle testing, Level II of ASNT.

Radiographic testing level II of ASNT.

Ultrasonic testing level II of ASNT.

Environment QS auditor Course-Cairo university 1999.

Environment QS lead auditor Course- BSI, 2000.Egypt

Direct management skills, Training petroleum sector - Egypt 2006. Page 2 of 12

API 510(Pressure vessel inspection code maintenance) Training course – Moody International-Egypt-May .2008.

Personal Survival Techniques, search and rescue on board offshore units

- Arab Academy for science, Technology& Maritime Transport - June.2008

Radiation and protection training course - National institute of standards

- Egypt from 29th June to 29th July 2008.

Management skills Training course-petroleum sector training centre- Egypt2008.

Certification of achievement HSE and Safety performance, ABB Co./Pakistan 2009.

HSEQ recognition award, OMV Co/Pakistan 2009.

Induction training in Hydrogen sulphide safety, OMV Co/Pakistan 2009

Total Quality Management Skills Training course-petroleum sector training centre - Egypt-October2010.

ASME Section IX Welding & Brazing Training course-SA International- Egypt-Jan.2013

Advanced H2S Gas course - Level II-MAERSK H2S Safety services - Egypt- December 2017

SUMMARY OF EXPERIENCE

Monitoring standard of fabrication, welding, installation, erection and alignment for steel structure, tanks, piping and pipeline carried out in accordance with specification as detailed in contract and drawing

Check the material and equipment used are in accordance to specifications.

Carry out dimensional checks during steel structure, tanks, piping and pipeline fabrication, alignment, erection according related drawings, specification and client requirements.

Check, review, interpretation and witness PT, MPI, UT, AUT AND RT for welding of steel structure, tanks, pressure vessels, piping and pipelines according approved procedures and codes.

Understanding and using AWS, API, ISO, ASTM, ASMI AND ANSI standards for material receiving, fabrication, installation and erection, welding and NDT, H.T and destructive tests.

Supervision of qualification tests for welders.

Responsible for supervision of all heat treatment requirements inspection during fabrication and installation, of all mechanical construction& pipe work and associated supports.

Responsible for quality control, radiography and all other N.D.T testing & interpretation of test results.

Responsible for sandblasting, painting, coating & wrapping inspection.

Responsible for keeping welding records and daily reports.

Onshore & offshore experience for storage tanks, pressure vessels, Separators, heaters, mechanical construction work, piping& pipe lines, decks, Jacket, piles, offshore platforms and lifting equipment.

Quality appraisal of material and equipment

Page 3 of 12

Planning and follow up internal and external audits and its corrective actions.

Prepare& implement on job training for existing and new inspection staff.

Knowledge in tender’s review, scope identification technical commercial terms, contract understanding

Monitoring tenders technical and commercial evaluation.

Inspection, maintenance rational program (I.M.R) with cathodic protection retrofitting and marine growth removal for offshore structures

(templates and platforms).

Pre commissioning, commissioning and startup testing for mechanical systems & subsystems for onshore gas project.

Good oral and written communications skills.

Ability to multi-task several CSU groups performing different testing and maintenance activities simultaneously while planning future activity and documenting results.

Ability to track tasks and complete assignments on schedule.

Understand the required result of testing, pay close attention to details of test, thoroughly document and delivery of test results in a timely fashion.

Ability to plan and execute work in order to meet deadlines.

Detail oriented and possess good organizational skills.

Previous Startup / Commissioning Experience in a Gas Plant Required and Previous experience in LOTO Systems and Training required

Good knowledge & experience in PTW, STARRT, JHA, LOTO procedures & practices.

Good leadership skills & able to supervise mechanical equipment for testing, startup and operations activity.

Good knowledge of and prior experience in using Bechtel's SWPPs and STCPs to govern work activities.

Good knowledge & experience of gas production equipment and mechanical equipment systems.

Page 4 of 12

AUGUST2017 TO JUNE 2020

POSITION: MECHANICAL COMMISSIONING SUPERINTENDENT

COMPANY: RINA

LOCATION: ZOHR ONSHORE DEVELOPMENT PROJECT (PETROBEL / ENI - PORTSAID-EGYPT)

SCOPE OF WORK:

The Commissioning & Startup Lead is responsible for overall organizing and directing of the CSU team activities including co-ordination with contractors, sub-contractors, and suppliers. Coordinate mechanical equipment pre- commissioning, commissioning and startup testing. Responsible for mechanical systems and components under care, custody and control of the commissioning team. Responsible for ensuring all safety procedures and policies are in place and adhered to for all mechanical systems and components under care, custody and control of the Commissioning Team

DUTIES:

Plans and conducts work requiring judgment in the evaluation, selection, application, adaptation, and modification of standard techniques, guidelines, procedures and criteria. Devises new approaches to startup, maintenance, operation, or testing.

Provide supervision for a wide range of mechanical equipment and system testing & commissioning activities to the CSU team. Duties include, but are not limited to the following:

From an execution perspective, assure the preparation of CSU testing & commissioning procedures, work packs & documents is complete by team.

Participate in walk down of systems for turnover from Construction to CSU to Client.

Direct CSU Supervisors during testing & commissioning phase in support of System Engineers.

Coordinate with Construction team during testing & commissioning phase to ensure safe execution.

Work with CSU contractors, subcontractors, supplier representatives & other discipline teams during testing commissioning phase to ensure proper documentation of testing.

Support LOTO activities by review during work preparation, and 100% compliance of equipment sign on/off during execution of work.

Support home office activities, including input to the Execution Plan, Staffing Plan, CSU Strategy, etc.

Work with Engineering during Model Reviews.

Plans, schedules, conducts, or coordinates detailed phases of startup, operations, or maintenance for a project, including reviews of designs for plant operability and safety and jobsite pre-commissioning and start-up assignments as directed. Performs work that involves conventional Page 5 of 12

practice but may include a variety of complex features such as conflicting requirements, unsuitability of conventional methods, or difficult coordination requirements.

Assists with the preparation of operations manuals.

Plans, guides, or prepares project administrative and technical documents as required for startup, maintenance, operation, or testing.

Coordinates startup between project engineering, construction, specialty staff groups, contractors, and vendors.

Assumes a lead role over other engineers for specific tasks as assigned. May direct overall startup activities on specific assignments.

Perform Job Safety Analysis (JSA) and toll box talk to executing the activities

Inspect and ensure all construction activities are completed prior to taking up the system for commissioning and ensure the setting up of safety procedures

Perform & guide various activities related to rotating equipment likes lube oil flushing, alignment, lubrication, vibration checks, start-up, etc.

Perform & guide various activities related to static equipment likes proper installation of internal inside the vessels as per drawing & specifications

Perform & guide in air blowing, flushing, leak testing, drying & inerting of various piping

Perform & guide in various activities such as mechanical interlock, pipeline pigging activities, spring support, hot & cold setting

Assist in HAZOPS / SIMOPS Reviews.

NOV. 2016 TO JULY2017

POSITION SR STRUCTURAL & NDT ENGINEER

COMPANY: BUREAU VERITAS CO.- EGYPT.

LOCATION: MARIDIVE 233 OFFSHORE PROJECT (M.O.P)

SCOPE OF WORK:

Inspection, maintenance rational program (I.M.R) with cathodic protection retrofitting and marine growth removal for no.16 of Belayim offshore structures. BELAYIM PETROLEUM CO.(PETROBEL) RED SEA-EGYPT.

DUTIES:

Inspection and survey work for 16 installations at Belayim offshore oil fields to collect data and take measurements on the jackets (above water) relevant to:

The geometry of the connections (brace-chord intersections)

Nondestructive testing(NDT)for the joint connections

Defects of the connections (length & depth), damage &pitting survey

(position, width &depth).

Out of straightness (distance &deviation),

Page 6 of 12

Joints welding details.

The detailed geometry for the above water decks of templates

&platforms related to elevation from the water surface at the low tide, dimensions, members section type and size.

Conductors location with respect to the center of the structure and detailed connections between the conductors and the structures (above water).

The equipment locations (C.G), dimensions (length, width and height) with its estimated weights.

MARCH 2006 TO OCTOBER 2016:

POSITION: QA/QC/ Sr. Inspection Engineer/Inspection Mgr./Assistant Maint. General Mgr.

COMPANY: Suez Oil &Gas CO (SUCO).

LOCATION: ZB, RB, RF, DS Oil& gas Fields/Cairo Main Office - Egypt. SCOPE OF WORK:

Fire equipment’s, pressure vessels, storage tanks, pipelines and piping work system and protective safety Devices, Suez Oil& Gas CO.(SUCO). DUTIES:

To implement, follow and manage QA/QC/Inspection staff& activities as follow:

Welder and welding qualification tests.

Fabrication, welding& installation of steel structure, tanks, mechanical construction work and piping work. Mechanical and destructive tests.

Visual inspection for welding.

NDT testing & interpretation for welding.

Dimensional check for fabrication, welding and erection steel structure, tanks, pressure Vessels, piping and pipeline activities.

Witness positive material identification (PMI).

Assessment of corrosion problems.

Field corrosion monitoring.

Hydrostatic testing & Pressure testing.

Offshore & Onshore sand blasting, painting, touch up, strip coating and Wrapping inspection.

Daily & weekly reports.

prepare& implement on job training for existing and new inspection staff for NDT, Corrosion, pressure vessels, static equipment’s & painting

Auditing CO.& Subcontractors Quality & Env. systems as per ISO 9000

&14000 ST.

Monitoring nonconformity, corrective action &preventive action Activities.

Prepare & Review Inspection& Test Plan (ITP).

Prepare& Review Work procedures& Instructions for fabrication, welding and erection of steel structure, tanks, vessels piping and pipeline. Page 7 of 12

Knowledge in tenders’ review, scope identification technical commercial terms, contract understanding.

NOVEMBER 2008 TO OCTOBER 2009(one-year permission from previous co.)

POSITION: QA/QC Site Manager

COMPANY: ABB Process solutions& services S.p.A-Italy. LOCATION: Sawan Gas Field Compression-OMV Co. /Pakistan. SCOPE OF WORK:

Civil work, Steel Structure work, piping work, Mechanical work (Static &Rotary Equipment), Electrical& Instrumental work, Wrapping, Painting &Insulation work, Pre commissioning and Commissioning work. PROJECT, Engineering, procurement, supply, construction and commissioning of the Sawan gas field compression project at Pakistan.

DUTIES:

To implement, follow and manage QA/QC/Inspection staff& activities as follow:

Civil Activities:

Earth & Buildings concrete works:

o Check of availability of document/drawing in last revision. o Check and review the reinforcement mill test certificates. o Check of the cement, aggregates and water test certificates. o Check concrete mix design test certificates.

o Check on earth work: Topographic excavation check, compaction of bottom excavation level.

o Preliminary checks on concrete casting: Lean concrete, form works, reinforcements, all embedded items (conduits, pipes, ducts, etc.), water stop, joints and anchor bolts.

o Check during concrete casting: concrete class, type, slump test sampling, cube test sampling, concrete temperature, pouring method, compaction, vibration and check Line leveling after pour. o Check after concrete casting: form works removal, final surfaces finishes, cracks or Damage.

o Check concrete curing: curing method and period. o Check back filling: material approval, thickness layer, compaction and level.

o Final check for test report, documentation and punch list closing subject for final Dossiers.

Embankment:

o Check of availability of document/drawing in last revision. o Check the material for embankment (fill, gravel, etc.), material classification and determination of the moisture density relation certificates.

Page 8 of 12

o Check before the fill activities: elevation, slope, drainage, subgrade and layer field density test and surface finishing elevation/final level.

o Final check for test report, documentation and punch list closing subject for final Dossiers.

Building finishing:

o Check water proof and heat insulation.

o Check electrical, telephone, instrumental works. o Check finishing works interior, exterior and roof as masonry, blasting, door fixing and Painting.

Roads:

o Check work execution and tests: position and routing, stripping, sub base, base Course canals, road crossing, bituminous mixes approvals, prime coat and asphalt.

Steel Structure erection:

o Check material certificates.

o Check erection activities: foundation, bolted joints. o Tighten check, dimensional check, plumb and level check.

Steel piping prefabrication and erection:

o Check pipes, fitting& flanges material certificates. o Check and review welding procedure qualifications. o Check welder qualifications.

o Check N.D.T technician’s qualifications.

o Check operating activities: welding material, welding equipment, visual &dimensional check of joints fit up and welding, checks NDT execution on welded joints.

o Check post weld heat treatment (PWHT) if required. o Piping release to wrapping, painting and erection activities. o Check line completion and identification.

o Check pipelines pressure tests and review test packs. o Final check for test report, documentation and punch list closing subject for final Dossiers.

Fiber Glass Epoxy pipes(GRE):

o Check of material certificates.

o Check operating activities: Joint preparation, adhesive bonded joints.

o Check line completion and identification.

o Check pipelines pressure tests and review test packs. o Final check for test report, documentation and punch list closing subject for final Dossiers.

Under Ground lining pipes:

o Check on material.

o Check pipes surface preparation, wrapping and painting application according specification requirements.

o Release pipes spools to erection.

o Check trenches preparation.

Page 9 of 12

o Check coating application and pipes lining, thickness coating and holiday test.

o Check backfilling.

Insulation:

o Check insulation material for equipment’s and piping. o Check before installation (completeness of welding, structural supports installation, surface treatment completion). o Check insulation and cladding activities.

o Check the seals and overlaps.

o Check remedial work.

Static and rotating equipment installation:

o Check of subcontractor method of statement.

o Check installation activities: equipment identification, civil work accuracy &cleaning, equipment positioning, elevation and leveling. o Check of shaft coupling alignment, grouting, anchor bolts tighten and earthling system connections for gas turbine and centrifugal compressor.

o Check mechanical completion: air cooled refrigerant centrifugal pump, volumetric pump, diesel motor, gear box, fan and centrifugal compressor and oily transfer pump.

o Check installation, level alignment for tanks, vessels, manual valves, in line filter, strainer, heat exchanger, air dryer, suction& discharge air cooler, inlet separators, fuel gas skid& generation package, fuel gas cooler-scrubber& heater, instrument& service air receiver.

Electrical and instrumental cable installation:

o Check installation activities: cable marking, correct positioning, fixing on racks, conduits, trays.

o Check cables sealing joints and fireproof compound. o Check of cables terminals connection and tighten. o Check of earthling connections.

o Check mechanical completion (cable ways).

o Check Pre commissioning: HV, MV&LV Cables.

Electrical Equipment’s Installation:

o Check installation activities: panels, identification and storage condition, correct positioning and fixing, cables sealing joints and fireproof compound, earthing connectors.

o Mechanical completion checks: Dry power transformer, H.V and M.V switch gear, control panel, UPS board (direct &alternative current), battery set, distribution panel, junction box, lighting alternator, AC motors and socket system.

o Pre commissioning check.

Page 10 of 12

MARCH 2005 TO MARCH 2006:

POSITION: Industrial Surveying Engineer for inspection and certification COMPANY: Registro Italiano Navale (RINA Co.)

LOCATION : RINA Egypt. - Cairo-Egypt.

PROJECTS: Offshore/ Onshore industrial installations. DUTIES:

Checking of design, supervision, and testing and trials during construction and installation, as well as in-service inspections, for the purpose of assessing performance and residual operating life in the field of offshore Onshore industrial & installations. Asset integrity assessment.

JULY 2003 TO FEB.2005:

POSITION: Sr. Inspection Engineer

COMPANY: J.T.S Japanese Contracting CO. Ltd.-Libyan Branch a subsidiary CO. of

JGC (Japan gas corporation),Tecnimont & Sufregazz

LOCATION: Wafa Plants, Desert, Libya.

PROJECTS: Western Libya gas &oil project, Desert plant (36 wells). Job code 0-2465-20.

OWNER: AGIP Gas pv Libyan Branch.

DUTIES:

To implement &follow Inspection activities as follow:

Welder and welding qualification tests.

Fabrication & installation, welding, erection and alignment of steel structure& mechanical Construction work and pipe work.

Visual inspection for welding.

NDT testing & interpretation for welding.

Dimensional check for fabrication and installation for steel structure work.

Witness positive material identification (PMI).

Hydrostatic testing & Pressure testing for piping and pipelines.

Daily & weekly reports.

Auditing CO. & Subcontractors Quality& Env. systems as per ISO 9000

&14000 ST.

Monitoring nonconformity, corrective action &preventive action Activities.

Prepare & Review Inspection& Test Plan (ITP).

Prepare& Review Work procedures & Instructions.

JUNE 1994 TO JULY 2003:

Page 11 of 12

POSITION: Sr. Welding inspector, mechanical supervisor, Sr. plant inspector. COMPANY: Quality Control CO., Opco CO.& First CO. for inspection & N.D.T of Petroleum projects and operations.

LOCATION: Cairo-Egypt.

PROJECTS:

Timsah gas pipeline, Petrobel CO, Port said.

Gas pipeline, San-Massr CO,6 October city.

Timsah Platform, Petrobel CO, Port-said.

Pipelines welding Inspection, Gupco CO, Ras-Shokeir.

Pipeline repair welding inspection, Petrobel CO, Port-said

Gemsa upgrading Platform, Gemsa CO, Zeit bay.

Pipelines, steel structure work, Tanks welding inspection and mechanical supervision, Petrobel Coat Abu-Rudis Abou Madi-PortSaid fields.

Fire equipment’s, pressure vessels, storage tanks, pipe work system and protective safety devices, Suez Oil & Gas Co. (Suco), Zeit bay. DUTIES:

Welder and welding qualification tests.

Review and check material receiving acc. specification and client requirements.

Fabrication, welding, installation and alignment of steel structure and mechanical construction work.

Visual inspection for welding.

NDT testing & interpretation.

Dimensional check for fabrication and erection of steel structure and piping work.

Hydrostatic testing & Pressure testing.

Offshore & Onshore sand blasting, painting, touch up, strip coating and wrapping

Inspection.

Daily & weekly reports

APRIL 1990 TO MAY 1994:

POSITION: Welding inspector, mechanical supervisor, plant inspector COMPANY: Arab inspection CO. for inspection & N.D.T. LOCATION: Kingdom Saudi Arabia.

PROJECTS: Power station units -Sea water desalination plants-piping & pipelines -Lifting

Equipment’s, fire equipment’s, pressure vessels &storage tanks. DUTIES:

Welder and welding qualification tests.

Receiving material inspection as per standards and client requirements. Page 12 of 12

Inspection for fabrication, welding installation and alignment of steel structure to power station and desalination projects.

Inspection for piping and pipeline fit up and welding work.

Visual inspection for welding.

NDT testing & interpretation for welding activities.

Hydrostatic testing & Pressure testing.

Daily & weekly reports.

Hot dip galvanizing inspection.

Auditing of quality & environmental systems as per ISO 9000, 14000 ST.

APRIL 1983 TO APRIL 1990:

POSITION: Q. C & Q.A Engineer

COMPANY: Arab organization industries A.O.I (Kadder factory). LOCATION: Nasr City, Cairo.

PRODUCTS: sheet metal & steel structure work as containers, vessels, tanks and

Military products as armor vehicles, aircrafts, bombs and plastic products.

DUTIES:

Welder and welding qualification tests.

Fabrication & installation of mechanical construction work and pipe work.

Mechanical and destructive tests.

Visual inspection for welding.

NDT testing & interpretation.

Dimensional check steel structure work.

Daily and weekly reports.

Assembly and alignment check

1980 TO 1983:

Military services officer



Contact this candidate