Post Job Free

Resume

Sign in

Phillips Chemical Chevron

Location:
Houston, TX
Posted:
May 25, 2022

Contact this candidate

Resume:

LARRY D. HARDY

**** ********* ***** *****

Houston, Tx 77035

936-***-****

adq6ks@r.postjobfree.com

OVERVIEW

I am currently looking for a position to that will utilize my skills

I have worked in various industries which include Oil & Gas, HVAC,

Telecommunications, Human Resources, Mortgage and Loan, Defense,

Railroad, Insurance, Medical, Manufacturing, Personnel Services, General

Labor, Event Services and Facilities Management.

EDUCATION

Houston School of Carpentry

Graduated April 2021

HVAC

Curriculum included:

Core understanding of system operations to sustain efficiency and comply with technical specifications,

manufacturer instructions and local procedures and codes.

Understanding of the pressure-temperature chart for common refrigerants and the typical use for each.

Skilled in electrical fundamentals and troubleshooting.

Technical support, expertise in hand and power tools, blueprint and schematic understanding and

Equipment installation.

Practical experience with brazing, soldering, recovery, evacuation/dehydration and system charging.

Solid understanding of basic controls of both comfort cooling and refrigeration systems.

Certificate of Completion: Heating, Air Conditioning, Refrigeration Installation and Repair

HVAC Technician Certification EPA Clean Air Section 608

TDLR - HVAC

USGC Craft Training

Graduated March, 2017

Instrumentation

Curriculum consisted of training in the Instrumentation Craft. This training consisted of 480 hours of hands on instruction, which concluded with knowledge and performance verification examinations. NCCER credentials were acquired upon completion of scheduled modules.

Training courses:

NCCER Construction Site Safety Orientation

NCCER Core Curriculum

NCCER Electrical Level 1 & 2

NCCER Instrumentation Level 1 & 2

Activities included:

Creation and utilization of Ladder Diagrams for Start Stop wiring with respect to relays,

contacts, 3 phase motors and emergency stop operations

Wiring and Calibration of the following:

AT900 Transmitter

Foxpro 35A DP Transmitter

Rosemont IDP Smart Transmitter

Rosemont 3051 Pressure Transmitter

Rosemont 3144 Temperature Transmitter

Utilization of Emerson 475 Hart Communicator

Utilization of FLUKE 789 Multi-meter

Performance of Piping and Tubing operations

A.A.S. COMPUTER SCIENCE, 1983

TEXAS STATE TECHNICAL INSTITUTE

CAREER CHRONOLOGY

04/21 – 07/21

Tuan Nguyen (HVAC Contractor)

Assisted with HVAC requests for maintenance and repair and installations. Requests were performed for both residential and professional customers.

05/18 – 06/19

Flour (Stork-Huntsman Petrochemical Company)

Responsible for assisting in achieving I/E Technician responsibilities of the maintenance team, with respect to the needs and requirements of the company. Duties involved instrumentation and electrical services. These duties involved installation, troubleshooting and repair of various instruments and electronic devices (i.e. sensors, transmitters, valve, meters, and probes). Bench and field testing were perform to assure equipment function. PH testing. VFD installation and configuration. Utilization of PLC and DCS. Installation and calibrating limit switches. Instrument tubing and conduit fabrications and installation. Calibration and preventive maintenance duties were also performed. Also, performed lighting installation and repair.

04/17 – 12/17

Flour (Chevron Phillips Chemical Plant)

Responsible for assisting in the construction of the new Ethylene unit of the plant, located in Baytown, Tx.

As part of the Instrumentation Craft group my responsibilities include all aspects of the instrumentation process. Duties initially involved the instrument fitting process, which included the layout, fabrication and installation of tubing, fittings and instrumentation systems ( sensors, transmitters, valves). The next phase involved instrument commissioning which required the installation, troubleshooting and various repairs of instrumentation equipment. These duties required the reading and understanding of electrical and instrumentation prints and loop drawings, utilizing hand held communicators and testing equipment. Also, performed additional duties as assigned.

All activities were performed as assistance to journeymen.

04/16 – 11/16

SOGO Industries

Primary responsibility was to deliver company manufactured as well as additional merchandise to customers. Additionally I would pick up merchandise. Those customers were local as well as regional. Duties also, included loading and unloading trucks with merchandise, assisted in manufacturing and assembly of products, utilizing forklift for movement of merchandise.

11/15 – 04/16

Pacesetter Personnel Services

Provide temporary services for clients on an as need basis. Services

include construction, assembly, banquet and general labor. Utilized

mechanical equipment such as lifts, pallet jacks, forklifts as needed.

07/07 – 01/15

Kingdom Builders Center

Responsible for assisting with the maintenance of the Kingdom Builders Center

(KBC) which included insuring proper functioning of facilities through

ongoing inspection and coordination with management. Assist in the

completion of day-to-day activities, involving the maintenance of the

building/facility, equipment and tools including HVAC, building lighting

systems, grounds keeping, security and overall facility appearance.

Assist the Facility manager with safety and related items. Coordinate

with event staff when facilities are used for client events. These

events included meetings, weddings, concerts, conferences as well as

specialized events. Coordinated/supervised support staff when events

were scheduled as well with daily activities. Utilized equipment such as

scissor lifts, forklifts, pallet jacks as necessary to complete duties.

05/04 – 07/07

Pacesetter Personnel Services

Provide temporary services for clients on an as need basis. Services

include construction, assembly, banquet and general labor. Utilized

mechanical equipment such as lifts, pallet jacks, forklifts as needed.

1984 – 2003 Various positions within the IT industry.



Contact this candidate