M.ANBARASAN Modeler & Detailer (TEKLA Structures) NO: 7a AKBS Home Mahesh Wari Street Radha Nagar Main Rode Chomped, Chennai.600044 E-Mail Id: **********@*****.*** Mobile No: +919*********
Technical Qualification Profile:
Diploma in Mechanical Engineering Board of Technical Education, Tamil Nadu, India-2009,
And Passed With 79.6% Marks.
Dhanalaksmi Srinivasan Polytechnic College Perambalur.
Total Experience In 11 Year 2 Month
9 Years’ Experience In Tekla-Steel Structure Modeling And Detailing For Different In Indian, UK & INDIAN & AUSTRALIAN Standards
Current Experience Details:
Company : Press Mach Engineer’s Pvt Ltd, Chennai. (Mar 2019 to till date)
Designation : Tekla Modeler & Detailer
Company : Seyon Inovative Engineering Pvt Ltd, Chennai. (Jan 2018-Mar 2019)
Designation : Tekla Modeler & Detailer
Company : Bhanesh Engineering Pvt Ltd. (Feb2016-Aug2017)
Designation : Modeler
Company : Thermax Ltd, Chennai (Mar2015- Dec2015)
Designation : Modeler
Company : Cistron Infotek Pvt. Ltd., Chennai (Nev2012-Mar2015)
Designation : Junior Modeler
Company : Wabco (TVS) India Pvt Ltd., Chennai (Apr2011-Apr2012)
Designation : Quality Assurance (Technician Trainee)
Company : Wabco (TVS) India Pvt.Ltd. Chennai (Jul2009-Jul2010)
Designation : Quality Assurance Technician Apprentice)
Roles & Responsibilities & Tekla Modular & Detailer:
Responsible To Process The New Enquiries And Submit Product Drawing And Bill Of Material
Should Have Good Knowledge In TEKLA Software & Steel Structure
Experience in Commercial and Industrial Projects.
Able To Modelling And Detailing Individually.
Modelling With Respect To Structural Drawing & Architectural Drawings
Before Starting The Model, Should Check The Input Drawings With Latest Revision.
Knowledge Of Standard Connection, Macro’s And User Defines Connections As Per Client Requirements
Should Do the Preliminary Model Check and Clash Check.
After Complete The Model, Should Able To Find Out The Transportation And Erection Issues.
Abel to Identify the Similar Connection in Model.
Capable Of Raising And Preparation Of RFI
Good Knowledge in Repots Preparation With Respect To Client Requirement.
Should Generate The GA Drawings, Shop Drawings, Erection Drawings With Related Reports And NC Files.
Good Knowledge In Preparing Bill Of Material, Title Block As Per Client Requirement
Extraction of Erection & Fabrication Drawings and Checking.
Strong Detailing Skills As Per UK & INDIAN Standards
Experience In Preparing Steel General Arrangement Drawings Editing.
Fabrication Drawings, Connection Details & Marking Plan Would Be Desirable.
Should Have Hands On Experience In Drafting & Detailing Of Different Structures.
Create Erection Drawings To Be Used By The Erector To Assemble The Steel Structure.
Assists In Shop Drawing Editing, Verification As Needed By Project Schedule.
Preparation Of Single Part Drawings
Press Mach Engineer’s Pvt Ltd. (PEB Structure)
Client: L & T (Indian Standard).
Project: L&T MFF - New Office 200 seats - G+1 Site Office
Project: L&T MFF - Linde - G+1 Puff Panel Office
Project: G+1 Site Office Puff Panel -Mumbai
Project: Project Office Hydrocarbon-Visakhapatnam
Client: Tata Steel Ltd. (Indian Standard)
Project: Tata Arch shape shed
Project: OP Blast Furnace-Electrical Shed
Client: DLF & OLA
Project: DLF-Marketing Office Building (PEB STRUCTURE)
Project: OLA-Canteen Building (PEB STRUCTURE)
Client: Rane Group
Project: Rane Factory Building (PEB STRUCTURE)
Client: Indian Oil Corporation Ltd (IOCL)
Project: Grass Root Lube Complex, Chennai (PEB STRUCTURE)
1. Low Flash Additive Storage 2.Additive Heating Station 3.Search Tower
Client: Vedanta Covid Hospital
Project: PIR Sandwich Covid Hospital – Korba City Chhattisgarh
Client: Kamara Jar Port Limited
Project: Container Examination Structure and Yard (PEB STRUCTURE)
INDIAN Standard:
Client : Reliance Industries ltd.
Project : Center pipe rack (P000PR01S05 & H000PR06S05 & H000PR04S05) for cable tray supports
Project : Compressor shelter K000SH35S01
Project : Steel pipe rack E000PR10S01 supports
Project : Circular platform H000EQC040002
Client: Lamsan power corporation ltd, Philippines (Thermax Ltd.)
Project: PB1401 Boiler Structure
Client: Anjani Portland cement ltd.
Project: PA1421 Boiler Structure.
UK Standard:
Client: FLSMOTH (UK Standard.)
Project: Blue Water Pederstrain Bridge.
Client : Petrofac Clean Fuels
Project : LA Amine Absorber V-153—101 Hyosung Corporation.
Project : 141A-V-A01 Initrogen Recever Detail of External Clips (Platform & Ladder)
Project : 141A-V-702 Instrument AIR Recever Detail of External Clips (Platform & Ladder)
Project : Ladder Clips Detail (314) Amine Regeneration Column
Client: West Kenya Sugar Limited (UK Standard.)
Project: Proposed Automative Workshop and Sugar Go Down In Kaka Mega.
Client: Tasco Industries Ltd, Uganda (UK Standard.)
Project: Proposed Factory Shed at Masese (Boiler Shed).
Client : Albawardi
Project : Midyan Gas Processing Facilities (Pipe Rack PR02A, PR02B, Process Pipe Rack PR1, PR2, PR3, PR4 & PR5 & PR02C)
Client: KNPC Clean Fuels (Kuwait Oil Company):
Project : Cement Mill & Cement Grainding Unit.
Project : Clean Fuels Project Kuwait Feed Surge Refinery Detail of Platform D-18-201.
Project : Clean Fuels Project Kuwait Minaral Ahmadi Refinery & Ladder Assembly -186-404
Client: Apollo Steel Llc (miscellaneous & structural steel) (US Standard.)
Project : Building 100 Renovation & Redmise
Project : River Rock Residences & Retail
Project: Northeast Behavioral Health Corpotion
DECLARATION
I Hereby Decaled That the Above All Information Is True and Best Of My Knowledge
Place: Yours Sincerely
Date: (M.Anbarasan)