Post Job Free

Resume

Sign in

Piping Designer Dow Chemical

Location:
Houston, TX
Posted:
May 19, 2022

Contact this candidate

Resume:

John W. Duffey

Piping Designer & Checker

Cell 281-***-**** Home 281-***-****

adq4cg@r.postjobfree.com

Qualifications

Education

Lamar High School – Basic Curriculum and Drafting –

Gulf Coast College – Design and Drafting Associate Degree

Houston Community College-Piping Design Drafting

Houston Community College-Autocad January 1984 – June 1985

Software/Other Skills

Microsoft Office, PDS, Naviswork, Bentley

AutoCAD, CADWorx, Smart Plant 3 D Piping. Modeling Model Review/Checking

Summary

Experience as a Senior Piping Designer & Checker. I’ve worked as Cad operator in the upstream and downstream oil and gas business as well as the process piping industry, and pulp and paper plants. Responsibilities include compressor stations, lube oil plants, pipe racks, offshore platforms and gas transmission software from Adev propipe proplant, plus Intergraph 2D, Micro-Training center in Huntsville, Alabama and 3D PDS training at Kellogg.

Experience

Strategy Engineering (September 2019 –Present)

Piping Designer & Checker/Cadworx

Principal designer and checker for Gas and Oil pipelines, Meter and Valve skids. The projects were onshore and offshore platforms. The software used was Cadworx, Naviswork and laser scans.

Solar Turbines (October 2015 –August 2019)

Structural Checker

Piping Designer & Checker

Principal piping designer and checker for Turbine job with Bentley Software and Naviswork Autoplant Gas compressor Modules Meter and Valve Skids. Created the models and then sent the models to Mumbai and we did all the piping and structural checking of the work that came back from India to Solar. .

Jacobs (September 2014 –April 2015)

PIPING DESIGNER/CHECKER

Principal checker of multiple projects. Oil & gas pipelines, meter skids, launcher, receiver skid, storage tanks field work to do walk down as-build drawings of meter skids, main line valve stations launch, receiver skids

MUSTANG (May 2008 –September 2014)

PIPING DESIGNER & CHECKER/Cadworx

Multiple projects for Oxy, Williams, Hess, Sunoco, Piping designer, checker, Oil & gas pipelines and facilities, Added 3 pressure gas compressors to existing platform for Hess. For Sunoco multiple sites, storage tanks, high pressure pumps. All of these projects where done using Cadworx 3d modeling to create Piping plans and extract ISO using isogen, and generated a BOM from model. I have also generated P&ID’s using Cadworx software. This was Hess oil project in 2011. We also modeled steel for the skids, meter skids and launcher/receiver skids

WASHINGTON GROUP (January 2008 – May 2008)

PIPING DESIGNER

Crude Plant Production (Tail Gas recover unit)

3D PDS equipment modeling and piping modeling along with Micro-station

CB&I (April 2007 – January 2008)

PIPING DESIGNER & CHECKER/LEAD

Compressor Station-Crude Plant Production

Gas Compressor Station-Crude Plant Production

BEK (July 2005 – April 2007)

PIPING DESIGNER/AUTOCAD/CADWORX

Gas Compressor Station, Crude Plant Production

Extensive Field Work Tie-in Connection, Field Routing

And Field Supports. I used Cadworx to model Equipment, piping

Steel and concrete. We used Cadworx to generate P&IDs and BOM

And to extract ISO’s

SNC-LAVALIN GDS, INC (February 2004 – July 2004)

PIPING DESIGNER/AUTOCAD / FLEX CAD

Lead Designer: Crude Production Plant

Extensive Field Work

Tie-in Connection, Field Routing & Supports

MEI/BEK (August 2002 – February 2004)

PIPING DESIGNER/AUTOCAD/ CADWORX

Gas Compressor Station, Crude Plant Production

Extensive Field Work Tie-in Connection, Field Routing

And Field Supports. I used Cadworx to model Equipment, piping

Steel and concrete. We used Cadworx to generate P&IDs and BOM

And to extract ISO’s

PRIDE INTERNATION (January 2002 – August 2002)

PIPING DESIGNER/ AUTOCAD / FLEX CAD

CDI (October 2001 – January 2002)

PIPING DESIGNER & CHECKER AUTOCAD / FLEX CAD

Celanese project, field verification, tie in, connections and routing.

Universal Ensco, Inc. March 2000 – July 2001

PIPING DESIGNER & CHECKER AUTOCAD

Field verification, tie-in connect, Layout & Design of equipment and associated piping

CDI (January 2000 – March 2000)

PIPING DESIGNER & CHECKER AUTOCAD /FLEXCAD

Field verification, tie-in connection, Layout & Design of equipment and associated piping

JACOBS (December 1994– March 1999)

PIPING DESIGNER & CHECKER/AUTOCAD

BECHTEL (June 1994 – August 1994)

AWD (December 1993 – June 1994)

DOW CHEMICAL (October 1992 – October 1993)

KELLOGG (June 1990 – October 1992)

BROWN & ROOT (October 1989 – June 1990)

HAWKER SIDDELEY (August 1988 – October 1989)

FLUOR/DANIEL (February 1988 – August 1988)

ASHLAND CHEMICAL, INC. (March 1987 – January 1988)

STONE AND WEBSTER (October 1986 – January 1987)

TEXAS EASTERN (February 1986 – June 1986)

READING and BATES (July 1985 – January 1986)

STEARNS CATALYTIC (November 1984 – June 1985)

www.linkedin.com/in/john-duffey-a4518494



Contact this candidate