R E S U M E
MANOJ KUMAR GUPTA (ELECTRICAL ENGINEER)
E-mail:********@*****.*** (Aramco Approved) SAPNo.80005487
Mob. +919*********; +977**********
Summary of Experience: Possess over Twenty (20) years of progressive experience in various industries such as Oil & Gas, Refinery, Power Generation Power Plant, Petrochemical, Residential/Commercial Buildings & High Rise Buildings for Design, Estimates, Installation, Implementation, Quality Assurance, Quality Control, Pre-commissioning, Testing & Commissioning, Start-up as well as in Operations & Maintenance of Commercial Buildings and Industrial Plant, and with almost (13) years’ experience in Qatar, Saudi Arabia. I have work experience for various disciplines such as Construction E & I Engineer, E & I QA/QC Engineer, QA/QC Electrical Inspector, and Field Engineering for E & I Systems for various facilities, encompassing various fields in Electrical & Instrument Engineering, in the Field of Quality Control and Inspection.
multi-billion US Dollars Mega Projects in Saudi Arabia, pertaining to 380KV, 230KV, 132KV, 13.8KV, 4.16K Power Substations, Combustion Gas Turbine Generator, Steam Turbine Generator, Heat Recovery Steam Generator, 380KV, 230KV, 132KV Gas Insulated Switchgears, LV & MV Switchgears, 13.8KV & 0.48KV Diesel Generator sets, 380KV, 230KV, 132KV Auto-Transformers, 380KV GSUT, LV & MV Power Transformers, Dry-type transformers, Isolated Phase Bus Duct, AC & DC Bus Duct, MCC's, EHV, MV & LV Power cables, LV & MV AC/DC Motors, Air Compressors, HRGR, DC System, Lighting system, Power Distribution system, Power for HVAC system, Earthing & Lightning Protection system, Aviation warning light system, Cable tray & conduit system, Sump Pump Control System, landscape lightings, underground distribution and duct banks for Power & Telecommunications, and Low Current systems such as Public Address/General Alarm system, CCTV, Security Access Control system, Fire Alarm & Gas Detection system, Lighting Control system, UPS System, etc.
Professional Qualifications: Master of Science in Electric Power Engineering - 1999
Minsk, Belarus (Former USSR)
Ph.D. in IT (energetic) -2001
Minsk, Belarus (Former USSR).
Computer Skills: Ms-Office, FORTRAN, PASCAL, Internet & Email
Operating System Ms Dos
Languages Known: English, Hindi, Russian, Nepali, and Arabic
Driving License Valid Saudi Arabia Driving License
EMPLOYMENT HISTORY:
COMPANY : SEPCO Electric Power Construction Corporation
-Saudi Arabia
Position : QA/QC Inspector (Electrical)
Project : SEPCO for Saudi Aramco –Jazan Integrated Gas Combined
Cycle Projects-Power Block Package # 04, Jazan
Period : August 2017 to March 2021.
COMPANY : El Seif Engineering Contracting Company
-Saudi Arabia
Position : QA/QC Inspector (Electrical)
Project : SADARA –SDL Buildings Package-Al-Jubail
Period : Aug 2014 toJune 2017
34.5/4.16 kV substations which is feeding from redundant feeder by 400 sq mm cable by SEC, redundant feeder by 400 sq mm, installation &eraction of 34.5/4.16 KV power cabledistribution transformer, 34.5 & 4.16 KV switchgear metal clad with sf6 circuit breaker, 4.16KV motor control center, power factor panel, interposing relay panel, LV switchgear & lighting,earthings system. Also involve in pre-commissioning & commissioning activity on relevant system in substation
Sub-station building work including relay panel and patch panel, fire alarm system
Annuciator panel, bus duct installation 4.16 kV & 480 volts and ups, battery charger, also Involvement in annunciation alarm testing, DCS function loop checks from MCC to DCS
issue the punch list
COMPANY : El Seif Engineering Contracting Company
Position : QA/QC Inspector (Electrical)
Project : Hyundai ElseifJoint venture for Saudi Aramco –KingAbdullah
Sports City, Jeddah
Period : March toJuly 2014.
COMPANY : Eastern Trading & Construction Est. (ETE)- Saudi Arabia Position : QA/QC Inspector (Electrical)
Project : JEDDAH STORM WATER DRAINAGE PROGRAM
PACKAGE-8 AIRPORT OUTFALL
Period : Jan 2013 to Oct 2013.
Tracer wire installation, splicing & continuity test
Enclosure installation
Reinstate the HV,MV,LV cables
Installation of street light pole,Termination, splicing of cable, grounding rod installation
Grounding test,continuity test, Megeer test
Make the punch list
Receiving inspection of material
COMPANY : Technip Saudi Arabia Ltd - Saudi Arabia
Position : QA/QC Inspector (Electrical)
Project : SATROP (SAUDI ARAMCO TOTAL Refining & Petrochemical
Company) for –JUBAIL EXPORT REFINERY PROJECT PAKAGE
2A CONVERSION
Period : May to August 2012.
Installation of wiring, conduits, panels, transformers and switchgear, distribution panels.
Motor control center,instrumentation metering and monitoring display system, installation switch yard transformer
Installation of medium and low voltage lighting termination emergency lighting system.
Installation of Sub-station equipment 13kv, Substation and all inside cable laying, Switchgear and MCC panel control cable laying and wiring termination.
Installation of 13kv.brass bar transformer to switchgear, substation LC & RC panels
Installation and termination of low voltage transformer and dry type.
Company : Othman Saleh Al-Ghamdi Contracting - Saudi Arabia Position : QA/QC Inspector (Electrical)
Project : OSG for Saudi Aramco –EXPAND EMERGANCY MEDICAL
FACILITES, Udhailiyah
Period : November 2011 to May 2012.
Material receiving inspection/electrical equipment,meager test of cable
Insulation, continuity of cable.
Preparation of inspection reports and testing
Installation of switchgear and control gear
HV/MV Cable splicing
Hi-Pot test and meager test
Company : Shan International - Saudi Arabia
Position : QA/QC Inspector (E& I)
Project : Replacement of HVACs system @ kfsh phase -2
Period : July 2011 to Oct 2011.
Responsibilities:
Preparation of inspection reports and testing
Surveying of installation and report preparation prior to the pre-commissioning
Cable pulling on tray, induct bank, drowpit, mandreal test of duct bank, High potential test of cable, power cable splicing, control cable splicing, Covering of cable tray.
Installation of VFD & Motor 3 phase in different load.
Installation of AHU, FHU and termination of equipment
COMPANY : Petrofac Saudi Arabia limited – Saudi Arabia
Position : Electrical &Instrument Supervisor
Project : Petrofac for Saudi Aramco –Karan Project, Khursaniyah
Period : December 2010 to June 2011.
Responsibilities:
Initial Project meeting with the management & superintendent to ensure the entire requirement
Utilize and control the manpower in accordance to given the work schedule to subcontractor.
Periodic monitoring time to time to subcontractors supervisor and foreman and supervise.
Preparation of material as per site requirement and project specification given by Saudi Aramco.
Provide work scheduled as per priority of requirement of project according to management.
Always conscious about the quality control of workforce as per work scheduled and priority.
Monitoring and preservation all of the olefins projects for requirement such of Power Transformer LV &Mv motor, distribution transformer, 13.8 Kv& low voltage switchgear.
Effective manage interfaces between new and existing facilities, ensure adherence to company golden HSE policies and aramco specification, without effective the MMG subcontractors schedule
Nature of work Industrial electrification
This project is involved on construction of 135 Megawatt co-generation power projects with laying of 115 kv high voltagefrom existing GIS substation 10 to power transformer, installation &eraction of 16.5/250 Mva power transformer, 5000 ampere isolated bus duct from CGTG to transformer, low voltage & medium voltage cable laying, cable tray for power & lighting welding outlet, field lighting, also glanding termination in switchgear, motor and solo run test low & medium voltage motor
COMPANY : National Blue Corporation – Saudi Arabia
Position : Electrical Engineer/QC Inspector (E&I)
Project : Hadeed expansion project –Jubail
Period : August 2010 To November 2010
Responsibilities
Material receiving inspection/documentation of instruments,
Electrical equipment, fabricated steel supports, and other
Construction materials.
Inspection of the depths, widths & orientation of cable trenches,
Cable duct bank and Cable draw pit
Checked sand bed, sand and soil backfill, placement of warning
Red tiles/yellow plastic tapes, and trench cable route markers.
Inspected cable trenching, cable trays/ladders, conduits,
stub-ups, convenience outlets, welding outlets, circuit breakers,
lighting poles, supports, and bolts/nuts/washers, earthing
electrodes, exothermic cad Welding joints, and earthing
Bonding jumpers.
COMPANY : NEPAL BOARD COMPANY – NEPAL
Position : Electrical Engineer
Period : July 2009 to July 2010
Responsibilities
To take care about whole electrical material & instrument
Production like cable, distribution panel, disconnect
Switch,Breakermccb, mcb, cable tray, cable lugs etc.
COMPANY : SAMEER AIR CONDITION AND ELECTRICALS - QATAR
POSITION
:
Electrical Engineer
PERIOD
:
March 2007 to May2009
PROJECTS
:
Real State Village at AL-KHARTIYAT: supply & distribute
the electrical power from the Government (Qatar
Electrical & Water Corporation) to the each compartment.
RESPONSIBILITIES
:
Directly responsible for the supervision of construction activities & Quality of work with high grade Safety Point of View by following all rules & regulation.
Coordinate with the KAHARMA. Engineer, Inspector, Contracts Engineer operation department & loss Prevention during execution of project for improvement of quality with safety. Preparation of technical queries & proposal for materials of the project for submission to the KAHARMA Engineer & Technical support unit.
Preparation & submission of accomplishment report & other related information to the KAHARMA Engineers of Qatar for related different type of projects.
Direct responsible for the preparation of operations & the maintenance manual of the project as on the requirement of Qatar rules & regulation.
Prepare other related engineering works of Qatar such as estimating, site visit & job monitoring as required in a certain project. Direct responsible for the project from the beginning from the line of job explanation to the final inspection of the project.
Directly responsible for all the electrical projects of the company from beginning (Biding) up to the final inspection of the projects.
COMPANY : NARITA INDUSTRIAL & COMMERCIAL INTERPRISES-BELARUS
POSITION
:
Manager
PERIOD
:
May 2003 to Oct 2006
RESPONSIBILITIES
:
As manager of sales and marketing department of All the production of different industries, different countries to bring on market of the Soviet Union on the competitive manner & competitive supplier
COMPANY : CHAUDHARY ELECTRIC COMPANY - NEPAL
POSITION
:
Electrical Engineer
PERIOD
:
April 2001 to April 2003
PROJECTS
:
Installation of Equipment & Power Supply at multi Story’s buildings
RESPONSIBILITIES
:
To take new project & according to requirement of the factory newly designed & erected the plant, during designing strictly considered the load of factory, motors capacity, the rating of cables, the capacity of generators, transformers, fuses, suitable control system for the operation in order the rules & regulations of the government of Nepal and the Nepal Electricity Authority & follow the all safety requirement of Nepal Electricity Authority which is applied for the erection of factories in the safely, reliable & economically manner for the better output ratio of the factories.
Personal Details:
Date of Birth : 18/11/1969
Nationality : Indian
Civil Status : Married
Passport Details:
Passport No : Z6807772
Place of Issued : (PATNA) India
Date of Issued : 04/05/2022
Expiry Date : 03/05/2032