Curriculum Vitae
TAPAN PARMAR B.E. Electrical &Electronic Engg.
Email: *****.**********@*****.***
Mo : 849******* / 816*******
ADDRESS
House No.8, Pn-48-50/A, Manibhadra Society, B/H. Trimurti Mandir, Airport Road, Bhuj - 370001
OBJECTIVES
To obtain a challenging position in a progressive organization, which expects a high level of performance and commitment from it’s successive, whereby I can apply acquired knowledge and skills working in a team environment. ACADEMIC QUALIFICATION
Exam Year of Passing University Percentage
Degree EEE
8th Sem
2012 C.U. SHAH College
Of Engg.,
Wadhwan
7.18 SPI
Degree EEE
7th Sem
2011 C.U. SHAH College
Of Engg.,
Wadhwan
6.73 SPI
Degree EEE
6th Sem
2011 C.U. SHAH College
Of Engg.,
Wadhwan
5.5 SPI
Degree EEE
5th Sem
2010 C.U. SHAH College
Of Engg.,
Wadhwan
5.3 SPI
Diploma Electrical June 2009 A.I.T.S, Rajkot 68.50% H.S.C. March 2006 G.S.H.E.B 71.43 %
S.S.C. March 2004 G.S.E.B. 65.43 %
WORK EXPERIENCE
1. Current Organization :-
ADANI GREEN ENERGY LTD (OMS Dept) –Ratadiya (Payroll - MANPOWERGROUP SERVICES ) ( 27/11/19 to conti..)
750 MW WIND FARM Pulling substation (150 MVA *4 )
AREA- Power system operation and maintenece & Power transmission and distribution.
1) 33kv/220 kv SCADA monitoring And Data Acquisition,Day ahead AVC,Drawing Reading, Operation and Maintenance SCADA Base Electrical EHV Equipment. Also 33 KV Line maintenance., Hourly Reading.
2) Feeder shutdown LOTO, DGR & TML Data collect,Energy report and MIS Report, Thermography of LV-HV Switchgear
3) Specific inspection and Maintenance of Transformer prime component and their peculiarities. HV (33 KV) & LV distribution operations (Load monitoring, isolation for maintenance.Upto 33 kv
4) RCA(Route cause analysis for repetitive faults and problems) Also Responsible for transformer oil filtration process of up to 2300 KVA transformer, BDV test, DGA analysis
5) Inspection of substation equipment and distribution network and reporting abnormalities and alarms. Preparation of inspection reports
2. Organization :-Suzlon power Infrastructure Ltd (08/10/18 to 25/11/2019)
Designation :- Engineer (Section in charge)
Duration :- 08/10/2018 to 25/11/2019
Current CTC :- 3.30 Lacks Per Annum + 8k other Allowance Key Responsibilities :
220 kv line inspection of TL. Site execution activity (Foundation,Erection and Stringing) as per customer (ENEL GREEN POWER) Tender condition Fqp's phase wise quality.
Check implementation of IMS System at site.
Conducting safety programs its better the way to make employee as a positive mind on safety
Designated as the first responder for emergencies based on EMT training and charged with overseeing all medical response (GWO Training) Substation :
I have Associated With Earthing System of Switch Yard and Equipment of a Sub-Station.Preparation of single line diagram,Taking TML,daily monitoring and loging report on scada
Construction Erection of Electrical Equipment Like Protection CT & PT, CVT, Power & Distribution Transformer, Erection, Commissioning.
Taking of Preventive Maintenance work at 66/11 KV line & Switch yard side.
220 kv Terminal Bay OUTDOOR HGIS Erection and Commissioning AT 765 KV PGCIL Substation.
Testing on Transformer –TEN DELTA,IR VALUE,WR,SC-OC Test
,Differcial Test
3. Organization :-L & T LTD AS SAFETY SUPERVISOR (22/05/2017 to 30/09/2018)
400 KV d/c Transmission line power line crossing Proposal
Tower Foundation, Erection And Stringing Execution Work
Footing Resistance check for Tower.
Current CTC :- 2.5 Lacks Per Annum
4. Organization : RIL HAZIRA SHUTDOWN (Rotostat Servise Pvt. Ltd. )
(06/03/2017 to 11/04/2017)
HT/LT Motor overhauling.
5 . Organization : RUSAN PHARMA `
(11/02/2016 to 30/09/2016)
Designation:Assistant Engineer at Kandla
Complet FAT Trial of lab machine at BLPT –Ankleswar -2016
Checking of construction Drawing,Documentation of all Process Equipment like URS, FAT, IQ, PQ.
Looking the Civil execution work, Maintenance of Utility Solid Oral Equipment like DG Set, Compressor, HVAC Coordinate with contractor for 11 KV transformer erect and commissioning and prepare Measurement sheet for bill payment.
6 . Organization : GRKS ENGINEERS PVT LTD
(12/05/2013 to 15/10/2015)
Cable gladding And Termination
Experience OF Erection Cable Tray Support, Structual Support
Cable laying of LT /HT Control instrument Proper Dressing and Clamping as per Cable schedule.
SOFTWARE SKILL
Computer Basics and Microsoft Office (Word, Excel, Powerpoint)
AUTOCAD - 2D
TRAININGS / CERTIFICATIONS
Also completed One month traning at 66 KV Substation Amreli. CURRENT CTC: 35000
EXPACTATION : 5.50 LACS
TOTAL EXPERIENCE : 7 YEAR ( Transmission line and 220\33 KV PSS Operation and Maintenance, Pharma and Oil gas )
PERSONAL PROFILE
Name - TAPAN C PARMAR
Date of Birth - 28/05/1988
Gender - Male
Languages Known - English, Hindi, and Gujarati.
Nationality - Indian
Hobby - Reading, Playing, Traveling.
Native Place - Amreli.
DECLARATION
I consider myself familiar with Electrical Engineering Aspects. I am also confident of ability to work in a team. I hereby declare that the above mentioned information is true to the best of my knowledge.