Post Job Free

Resume

Sign in

Power Plant I

Location:
Pune, Maharashtra, India
Salary:
18000BD/PA
Posted:
May 09, 2022

Contact this candidate

Resume:

NAMDEV R GHODAKE

Mobile: +91-973*******

Email:- adq0mn@r.postjobfree.com

In quest of assignments in Project Management of EPC Projects, Field Quality Assurance and Supply material quality with an organization of high repute in, Technical, Power,Sugar & Cement Industries, preferably in African countries.(Tanzania, Zambia, Nigeria) & Middle East Iraq, Bahrain, UAE & Indian sectors(Maharashtra, Tamil Nadu, Rajasthan, Tripura & Gujarat)

• A result oriented professional with 10+ years of experience in: Project Management Erection Quality Assurance & Control Client Relationship Management Team Management Process Improvement

• Exhibits a strong and firm approach for sustaining / encouraging safe work environments and ability to streamline Erection, Field Quality Assurance control and supply material Quality including operations maintenance of EPC Power Projects and Signal transmission station of Indian sub marine.

• Applies continuous improvement principles to support suggested EPC Power Project improvements in Erection, Operation Maintenance process & Quality assurance control to make the system full proof and increase process, maintenance efficiency and company’s profits

• Skilled in diagnosing faults, rectification, planning & scheduling effective maintenance schedule for enhancing systems efficiency.

• Expertise in planning, engineering, managing & executing power plant projects including erection, operations maintenance and Quality assurance and control of the same.

• Holds the credit of executing & Quality assurance and control of 3000MW Combined cycle power plant including HRSG

(Baghdad Iraq), 1800MW Combine cycle power Project(Bahrain),1x10,3x30MW TPH of WHRB Boilers, 1x 25CFBC Boiler, 4X25 HRSG Boiler, 1 * 25 MW CPP EPC Project Tanzania & 1 *30 MW CPP EPC Project,Nigeria.

• Signal transmission system for Indian sub marine(India’s Tallest Guyed mast signal transmission tower with Lift/elevator arrangement & MTS (Main Signal transmission building & control building) & Admin Buildings)

• Proficient in managing overall project while ensuring high quality standards and meeting KPIs.

• An effective communicator with strong analytical and problem solving abilities. Core Competencies

Project Planning & Management

• Managing overall operations for executing projects within cost & time norms; participating in project review meetings for evaluating project progress & de-bottlenecking

• Preparing project schedules and monitoring projects with respect to cost, resource deployment, time over-runs & quality compliance to ensure timely execution of projects

Erection, Testing and Quality Assurance and control:

• Anchoring on-site installation, testing,commissioning and Quality assurance control activities to ensure completion of project effective resource utilization to maximize the output; performing tests & inspections to ensure operational effectiveness of plant & utilities

• Carrying out overhauling work of equipment and major repairs to improve equipment efficiency by faultfinding; conducting performance trials of engineering equipment to establish standards before and after major repairs Field / Supply Quality Assurance and control

• Field quality assurance and control as per erection, testing manual, IS & IEC std and field quality assurance plan.

• Supply material quality assurance and control as per IS & IEC std, quality assurance plan, inspection and test reports. Organizational Experience

COMPANY:. TATA PROJECTS LTD

DIVISION : QUALITY SERVICES

DESIGNATION: QA/QC( E & I) INSPECTION ENGINEER

PERIOD: 15 June 2019 TO Till Date

Role /Highlights:

Inspection and Quality management:

Inspection of various commodities, equipment, packages at supplier / manufacturer place and on project site/field. Activities:

Raw Material Inspection.

Lab test witness.

Monitoring, witnessing of FAT.

Witness of Testing i.e. HV LV Switchgears, cables, Transformer, Motors, Generators etc.

Review of Raw material Test Certificates, Calibration equipment reports

Witnessing Temperature rise test on Motor and Transformer.

Witnessing Routine tests on Fire alarm and detection system packages.

Witnessing Surface preparation & painting Inspection

Reviewing Quality Control Procedures and Inspection Test Plans.

Responsible for Implementing of Quality control and Documentation of Quality Plan, Standards and codes.

Field quality inspection for Combine cycle gas Turbine & steam turbine plants, Gas RMS plant etc

Preparation of E & I power plant package ITP’s, checklists, method of statement, Quality assurance and Control plans & procedures

Expediting & Inspection of Following Components:

The list of equipment include,

Generator step up, Power & Distribution, Auxillary Transformers, Dry type power/lighting transformers

Combine cycle power project -33KV Switch Boards

MCC Panel, LV power Panel, Power DB’s, Junction Boxes, Lighting and small power panels

UPS, Inverter, converter Battery charger and Plant Batteries.

Electromagnetic Filters and overall system setup.

Controlling & Relaying panels

PLC & VFD Panels

Water treatment plant package

Public address, Data and voice system, door access and control system, Fire alarming and detection scheme.

Technical building setup.

Instrumentation monitoring system package.

Temperature, Pressure & level Gauges, Temp transmitter, Flow Transmitter & Pressure Transmitter etc.

HT/LT motors

Gas and steam turbine Generators.

Induction and synchronous Generators

Bus ducts

HT/LT Power cables

Control & instrumentation cables.

HT/LT Capacitor banks & panels.

BS IV Engine test lab E & I erection, testing and Quality assurance and control.

Oil and Gas Plant Equipment Inspection according to ATEX/COPAX.

Expediting : Responsible for Manufacturing Progress, Planning & Execution by continuous monitoring of the raw material progress, In process Assembly & Final product. COMPANY: GE & GAMA Power Systems Engineering and Contracting Inc. PROJECT: ALBA Line 6 Extension Power Station 5 (1800 MW CCPP) Project – Bahrain DESIGNATION: QA/QC LEAD E & I ENGINEER (ALBA, BAHRAIN APPROVED E&I ENGINEER) PERIOD: 2 FEB 2018 TO 15 June 2019

Role /Highlights:

Direct, supervise and coordinate electrical inspection/engineering QC activities with site supervision team

Highlights the areas of potential non conformity, and advises for preventive action.

Review and check submittals, shop drawings, equipment data, material samples and/or manufacturers for compliance with contract drawings and specifications. Coordinate with design team to resolve all electrical issues, and quality related conflicts.

Ensure that all requirements of the applicable specifications and drawings are complied with; and report on deficiencies and advise for the required corrections on site.

Establish and maintain robust procedures to develop standard documentation for the projects quality control and assurance; center and propose any improvements deemed necessary.

Assist the site supervision team, carry out & implement the QA/QC program, attend quality weekly meetings under the area manager.

Implement the QA procedures, coordinate electrical QC work with other technical disciplines to ensure safe and seamless management with all trades and activities, and communicate to respective team the QA system requirements.

Implement accident prevention plan. Promote safety goals and the culture of safety on the jobsite.

Coordinate testing and inspection of off-site materials storage and testing.

Coordinate testing and inspection of on/off-site materials used in atmospheric explosive area (ATEX).

Inspect all materials for compliance to submittals and drawings.

Monitor the performance of all control activities and tests on electrical systems including ATEX area.

Troubleshoot and resolve problems relating to electrical quality control.

Highlights deficiencies, shortfalls and indicates areas for improvements either within the construction activities or for documenting procedures and evaluate remedial procedures.

Identify non-conformances, lead its investigation with the relevant departments; and evaluate contractor’s submitted corrective & preventive action plan.

Flag all concerns regarding contractor’s deviations from the set and approved quality plan; raise necessary NCR’S and coordinate with the area/assistant area manager on the NCR’s acceptable closing procedure.

Participate in development of the commissioning plan, roles and responsibilities. Implement commissioning plan.

Participate in and conduct weekly coordination meetings with the client, construction team and contractor.

• Review, assist and facilitate daily report process and maintain the quality file system COMPANY: ENKA İnşaat ve Sanayi A.Ş.

PROJECT: 3000MW Baghdad Electrical Power Station-Baghdad, Iraq DESIGNATION: QA/QC E & I Inspector

PERIOD: 4-Sep-2016- 1 January 2018

Role/Highlights:

Site Inspection

Material receiving inspection for Electrical Panels, Motors, Transformers (Dry/Oil), Cables, Equipment’s, all types of JB’s and steel materials.

Inspection and monitoring of Power Transformers (Up to 330MVA) as per the Quality plan.

Inspection and monitoring the installation of various panels, such as MV & LV switchgears.

Inspection and monitoring the installation of isolated phase busduct, segregated phase busduct and Non-segregated phase busduct.

Inspection and monitoring the MV, LV Power and Control, signal and Fiber optical cables (U/G and A/G) installation, Splicing and termination.

Installation inspection of DC,UPS and Battery system

Inspection and monitor the lighting system and small power panel installation.

Inspection and monitoring the duct bank, cable tray and conduit installation.

Inspection and monitoring the cathodic protection system installation.

Inspection and monitoring the installation of Earthing & Lightning Protection system.

Installation inspection of Earth pit.

Installation inspection of LV & MV Motors.

Inspection and monitoring the Installation of Diesel Generator.

Inspection and monitoring the Installation of Electric Heat Trace System for Hot water/steam line, BOP/Firefighting lines

Inspection and monitor the Industrial drives, MOVs, Fire & Gas system and Heat tracing system.

Inspection and monitor the Electrical equipment and Instruments in Gas RMS and Turbine hall area which is under ATEX area.

Inspection of fire and alarm detection systems installation.

Installation inspection of instruments as per P&ID.

Calibration inspection for Flow, Pressure, Level and Temperature instruments.

Testing and pre-Commissioning Inspection

Testing inspection of Power transformers(Polarity test, Vector group test, Tan Delta test, SFRA test, Winding resistance test for different tape & set the tape to required voltage, Insulation resistance test, Ration test and Oil dielectric strength tests(BDV).

Testing inspection of MV & LV switchgears(Breaker functional test, Protective relay test by secondary injection, CT & PT test, Contact resistance test, Insulation resistance test, Dielectric strength test of breakers, Door, Earth switch interlocking test, Space heater and Thermostats test, High Potential test.

Testing inspection of Generator circuit breaker operation from all open, closes, trip test and checking of signaling and alarm.

Functional testing inspection of scheme and associated interlocks, reacceleration scheme and coordinate with upstream and downstream for inter trip functional test.

Inspection of protective relay on minimum, maximum and recommended setting and set the relay as per relay co- ordination chart.

Functional test and Illumination level testing of lighting system.

Testing inspection of motor (MV&LV).

Testing Inspection of Cathodic protection system.

Pre-commissioning and commissioning for Battery and Battery charger.

Testing inspection of earthing and lighting system. COMAPANY- Thermax Ltd., Pune

DESIGNATION-QA/QC E& I Engineer

PERIOD-: March 2014 to June 2016

Role:

• Understanding client needs, requirements & expectations, devising solutions accordingly, managing end-to-end operations, auditing process, etc.

• Building cordial relations with customers, contractors, consultants, sub-contractors & team successfully execution of Power Plant Projects.

• Inspection, testing and quality assurance control of as per customer requirement and IS/IEC/IEEE standards

• Investigate, analyze and resolve supplier quality problems by conducting audits, analyzing defect trends and leading continuous improvement

Highlights:

• Working with Thermax LTD (Head Office-Power division, Pune). As a Quality assurance and quality control Engineer for Supply material & Field Quality for Domestic as well as Export Projects.

• Review contract and project planning.

• Review and approval of supplier QAP.

• Prepare and control monthly inspection plan.

• Co-ordinate inspection agency to organize inspection as per MCI/Monthly schedule.

• Meet inspection and testing requirements as per MTD.

• Review of inspection reports.

• Interact with cross functional department to resolve any variation in Inspection.

• Update of inspection reports in ERP.

• Prepare MRN. NCR, GRN, ERP System, Weekly/monthly inspection schedule and any additional suitable assignments.

• Vendor assessment and selection of vendor.

• Shop inspection, document review and QAC clearance.

• QA/QC documentation of different projects. Documentation of all electrical and Instrumentation activities.

• Inspection and field quality control of following activities:

• HT switch gears, High voltage auxiliary Transformers, Dry type LT transformers, Different types of DB’S, Different Earthing systems, LT switch gears, Different types of cable tray networks, HT/LT Cables, small/large capacity HT/LT motors, control gears, Street lights, House hold and Industrial lighting System and Structural lightning protection system, UPS and Battery system, VFD drives, PLC system

,including of Electrical system related documentations like Erection protocols, SAR,CAR ‘s, system Check lists, weekly/monthly quality test reports, Site observation registers, MDR’s etc. June ’12 to March14

M/s. CEM Engineers and consultants.

Role:

• Oversaw entire Erection, testing and quality assurance control for signal transmission project of Indian submarine

• Identified & managed customer’s requisites, reviewed project progress and suggested improvements for the same

• Extended solutions for resolving critical issues at the earliest and supervised work progress with planned activities

• Updated reports & charts of process advancements on daily, weekly and monthly basis

• Monitored project activities and ensured no delays from start to finish for achieving the targets assigned Highlights:

• Installation, testing, Quality assurance/Quality control and commissioning of Power & distribution transformers.

• UPS and Battery system.

• HT/ LT panels and cables networks.

• HVAC system, Hot Water Generators, AHU and Cooling Towers.

• Fire Fighting and Fire Deduction System complete. +

• Variety of DG sets 125KVA Up to (2500KVA)2.5 MVA.

• Synchronizing panel and Larger Capacity of Load Banks 2.5 MVA.

• Internal electrical system of buildings up to main panel board including sub main wiring.

• External street light poles/fixtures & Internal Electrification work.

• Special Knowledge of EMP and HEMP Hardening of Technical buildings.

• Erection, testing and inspection of High Rise Guy wired VLF towers(470mtr heighten, India’s Tallest tower) with hoist and high mast aviation obstruction lights, Oil filled HT insulators.

• HEMP & EMP Testing of technical building with LRDE Scientists Bangalore.

• Overhead HT Transmission Lines and Underground HT/LT Cabling.

• Internal configuration with PA system, Door access / control system and Data voice system.

• Variety of Grounding/Earthing systems-Erection and testing.

• Modify/ co-ordinate the drawing as per site requirement, Load calculations, Preparation of As Built Drawings and Inventory. Preparation of Billing, Preparation of Detailed Estimation, Costing, Rate Analysis on contracts and Deviation Orders.

May2008-May2009 M/s. Vighnaharta Electricals and Developers, Miraj Role:

• Oversaw entire Erection, testing and quality assurance control for power transmission projects of MSDCL.

• Identified & managed customer’s requisites, reviewed project progress and suggested improvements for the same

• Extended solutions for resolving critical issues at the earliest and supervised work progress with planned activities

• Updated reports & charts of process advancements on daily, weekly and monthly basis

• Monitored project activities and ensured no delays from start to finish for achieving the targets assigned Highlights:

• Estimation,costing, execution, testing & commissioning of HT/LT Transformers, HT/LT Panels, Internal Electrification of Residential and Commercial buildings, Industrial HT/LT Cabling, Earthing system Over head HT power transmission work for MSDCL. Preparation of Technical Bids with Rate Analysis etc. Trainings

• Attended trainings in:

o 09MW Co-generation Plant at Pandurang SSK Ltd., Solapur in 2012 o 06MW Co-generation Plant at VD Sugar factory, Jath in 2012 Certifications

• Underwent certifications in:

o MS-CET certification in 2008

o Elementary grade Drawing Exam Certification in 2000. o Hands on experience of Oracle software/ERP

o State Government Electrical supervisory license in 2014 o Certification in (ATEX) Atmospheric Explosion by SAYIR AKADEMI,Turkey Education

2021 PGP PMP from NICMAR, Pune (First class :67.00%) 2012 BE Electrical from BMIT Solapur (First class with distinction 68.17 %), Solapur University 2008 Diploma in Electrical Engineering from Walchand college of Engineering Sangli, (First class 69.33%) MSBTE Personal Details

Date of Birth: 23rd February, 1985

Marital status: Married

Languages Known: English, Hindi, and Marathi.

Address: MAJESTIIQUE IMPERIA Building-A, Flat No-402,Opposite Abhay CNG pump, Behind power House, Phursungi 412 308,Dist-Pune, State-Maharashtra, INDIA Reference

Name: Lt.Cdr. (Rtd) BALSON VIJAISH (Project Manager, CEM Engineers, Delhi) Name: BERIKAN ALP (QA/QC SITE MANAGER –ENKA INSAAT VE SANAYI AS, Turkey) Name: ERDINC ERDOVAN (QA/QC SITE MANAGER-GAMA POWER SYSTEMS ENGINEERING, BAHRAIN) Name: CHANDRA MOHAN VAINALA (QA/QC SITE MANAGER- GE FRANCE)



Contact this candidate