Post Job Free

Resume

Sign in

Wind Farm Foster Wheeler

Location:
Batam, Kepulauan Riau, Indonesia
Salary:
45.000.000 IDR
Posted:
January 19, 2022

Contact this candidate

Resume:

`

MAIRIZON

: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: adpyz6@r.postjobfree.com REFERENCE AVAILABLE ON REQUEST

CURRICULUM

VITAE..doc

Personal Detail

Full Name : Mairizon

Address : Perumahan Bukit sakinah blok Toriqh 1 no.14 Batuaji, Batam Island. Birth Place/Date : Solok 11,November 1976

Marital Status : Married

Nationality : Indonesian

Email mail : adpyz6@r.postjobfree.com, adpyz6@r.postjobfree.com Contact Number : +62-813******** /+62-821********

Passport No : A1542163

Professional Qualification

Senior Welding Inspector CSWIP 3.2.1

MP/PT ASNT Lev.II

RI ASNT Lev.II

UT ASNT Lev.II

T-BOSIET

Carrier Summary

Having more than 15 years in Inspection & Quality Control including supervision, inspection, engineering & prepares quality control procedure and responsible for general quality control activities to confirm that they comply with specified procedure, Client or Customer requirement.

Summary

Course and Training

Welding Inspector CSWIP 3.2.1 TWI LTD, Granta Park, Great Abington, Cambridge, UK. Certificate no. Waiting Certificate

Welding Inspector CSWIP 3.1 TWI LTD, Granta Park, Great Abington, Cambridge, UK. Certificate no.57927

`

MAIRIZON

: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: adpyz6@r.postjobfree.com REFERENCE AVAILABLE ON REQUEST

Expiry Date :31/07/2021

Welding Inspector CSWIP 3.0 TWI LTD, Granta Park, Great Abington, Cambridge, UK. Certificate no.35209

Expiry Date :26/07/2013

NDT LEVEL II

- Radiography interpration ASNT Level II

Cert. No. : 52/RI/Re/17

Expiry date :July 2022

- Liquid Penetrant Testing, ASNT Level II

Cert. No. : 120/PT/Re/17

Expiry date : July 2022

- Magnetic Particle Testing, ASNT Level II

Cert. No. : 128/MT/Re/17

Expiry date : July 2022

- Ultrasonic Testing, ASNT Level II

Cert. No. :UT-14051

Expiry date :10/04/2024

- BOSIET

OPITO Vantage No.1638594

Cert. No. :131157071305150490

Expiry date :05/12/2019

Working Experiences

PT.SMOE

January 2019 ~ Present

Project : Gallaf2 (Topside,Jacket and Bridge)

Client : North Oil Company

Position: Lead QC Inspector

Project : Hornsea II Offshore Wind Farm (Topside)

Client : Orstead

Position: Lead QC Inspector

Responsibility:

Reporting to QA/QC manager for all inspection activities and coordination for NDT subcontractor.

Ensuring that the inspectors are aware of all Quality requirements for each project and are in possessions of or have access to the latest revision of project Inspection and Test Plants.

Ensuring that the inspectors progressively inspect fabricated items.

Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.

Coordinating all inspection activities being undertaken in the area involved.

`

MAIRIZON

: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: adpyz6@r.postjobfree.com REFERENCE AVAILABLE ON REQUEST

BEREAU VERITAS INDONESIA

November 2017~ October 2018

Client : BHGE

Position: BHGE third Party

Responsibility:

Reviewed Document as per VGS (Vetco Gray spec ) and ITP.

Verification Material before assembly for casing hanger, Subsea tree, wellhead hosing, Intermediate joint( BOX Connector,PIN Connector and Pipe)

Verification Material Inconel for Over lay for hosing.

Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection.

Monitor Drift test for Intermediate joint, Function test.

Monitor production activities to confirm compliance with procedural and client requirement.

Whiteness Hardness test .

Whiteness Hydrotest.

Reviewed NDT report, Coating Report, Painting Report. Heat treatment( Free heat, Post heat and PWHT), Phosphating Report).

Reviewed Hydrostatic Report.

MRB Reviews

Report to QA/QC Coordinator end of day of day.

ABS Consulting

August 2017~ November 2017

Client : BHGE

Position: BHGE third Party

Responsibility:

Reviewed Document as per VGS (Vetco Gray spec ) and ITP.

Verification Material before assembly for casing hanger, Subsea tree, wellhead hosing, Intermediate joint( BOX Connector,PIN Connector and Pipe)

Verification Material Inconel for Over lay for hosing.

Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection.

Monitor Drift test for Intermediate joint, Function test.

Monitor production activities to confirm compliance with procedural and client requirement.

Whiteness Hardness test .

Whiteness Hydrotest.

Reviewed NDT report, Coating Report, Painting Report. Heat treatment( Free heat, Post heat and PWHT), Phosphating Report).

Reviewed Hydrostatic Report.

MRB Reviews

Report to QA/QC Coordinator end of day of day.

SIEMENS

December 2016~ May 2017

Project : YAMAL LNG Project

Client : YAMGAZ

Position: QA/QC Inspector

Responsibility:

Reviewed welding document such as WPS and ITP

Responsible in all piping erection on Module

`

MAIRIZON

: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: adpyz6@r.postjobfree.com REFERENCE AVAILABLE ON REQUEST

Review all P&ID and ISO drawing prior to installation piping

Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection

Arrange and witness NDT Inspection Arrange.

Coordinating all inspection activities being undertaken in the area involved

Monitor production activities to confirm compliance with procedural and client requirement.

Line walk

Witnessed of all pressure testing (hydrostatic, flushing and drying)

Arrange and reviewed NDT inspection and report

Arrange all document related, during and after fabrication

Reinstatements

Preparing the punch List and closing.

Report to QA/QC Coordinator end of day.

PT.SMOE

June 2016 ~ 31-August 2016

- Project : YAMAL LNG Project

Client : YAMGAZ

Position: Field Welding Engineer

Responsibility:

Reviewed welding document such as WPS and ITP

Responsible in all piping erection on Module

Review all P&ID and ISO drawing prior to installation piping

Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection

Arrange and witness NDT Inspection Arrange and witnessed PWHT chart and witnessed thermocouple location by subcontractor

Coordinating all inspection activities being undertaken in the area involved

Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.

Witnessed of all pressure testing (hydrostatic, flushing and drying)

Arrange and reviewed NDT inspection and report

Arrange all document related, during and after fabrication

BECHTEL,Batam Module yard

July 2015 ~ may 2016

- Project: Wheat Stones LNG Project

Client : Chevron

Position: Field Welding Engineer

Responsibility:

Read and understanding project specification.

Executes the specific inspections equipment and constuction / installation activities on site, as per quality control and/or inspection test plan(s).

Issues the relevant and countersigns Quality records and when necessary.

Controls daily welding consumables Welding activities.

Maintain availability of AFC drawing and control their revision issue for piping.

Check material traceability.

Inspection of all aspect of related to Structural and Piping welding before, during & after welding.

Ensure and monitoring that all NDT requirement have been done as per project standard and specification.

`

MAIRIZON

: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: adpyz6@r.postjobfree.com REFERENCE AVAILABLE ON REQUEST

Line walk for piping with client.

Test pack review & ensure that all data and report are maintain and cover for final dossier and packages.

GLOBAL PROCESS SYSTEM

October 2012 ~ June 2015

- Project: Varanus Island Compressor Project

Client : Apache Energy Limited

Position: QA/QC Coordinator

Responsibility:

Reporting to QA/QC manager for all inspection activities and coordination for NDT subcontractor.

Ensuring that the inspectors are aware of all Quality requirements for each project and are in possessions of or have access to the latest revision of project Inspection and Test Plants

Ensuring that the inspectors progressively inspect fabricated items

Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.

Coordinating all inspection activities being undertaken in the area involved

- Project: Top Side FPSO BUKIT TUA

Client : M3 Energy

Position: QA/QC Coordinator

Responsibility:

Reporting to QA/QC manager for all inspection activities and coordination for NDT subcontractor.

Ensuring that the inspectors are aware of all Quality requirements for each project and are in possessions of or have access to the latest revision of project Inspection and Test Plants

Ensuring that the inspectors progressively inspect fabricated items

Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.

Coordinating all inspection activities being undertaken in the area involved.

- Project: Top Side FPSO LAMSON PROJECT

Client : PTSC ( petrovietnam )

Position: QA/QC Inspector

Responsibility:

Reviewed welding document such as WPS and ITP

Responsible in all piping shop and erection

Review all P&ID and ISO drawing prior to installation piping

Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection

Arrange and witness NDT Inspection Arrange and witnessed PWHT chart and witnessed thermocouple location by subcontractor

Witnessed of all pressure testing (hydrostatic, flushing and drying)

Arrange and reviewed NDT inspection and report

MDR Review.

Arrange all document related, during and after fabrication

`

MAIRIZON

: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: adpyz6@r.postjobfree.com REFERENCE AVAILABLE ON REQUEST

WASCO ENG INDONESIA

Feb 2012 ~ September 2012

Project : GLNG PLANT PROJECT

Client : SIEMENS

Owner : BECHTEL

Position : QA/QC Coordinator

Responsibility:

Reporting to QA/QC manager for all inspection activities and coordination for NDT subcontractor.

Ensuring that the inspectors are aware of all Quality requirements for each project and are in possessions of or have access to the latest revision of project Inspection and Test Plants

Ensuring that the inspectors progressively inspect fabricated items

Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.

Coordinating all inspection activities being undertaken in the area involved

Preparation PQR and WPS for new project as per client requirement

Conduct and witness welder test

PT. Mc. Connell Dowell INDONESIA

May 2010 ~ Feb 2012

1.Project: Toka Tindung Gold Project (Project No.5356&5431) 24 April 2010-25 july 2011 Owner: MSM/TTN

Position : QA/QC INSPECTOR (SMP-Structural, Mechanical and Piping) Responsibility:

Reviewed welding document such as WPS and ITP

Responsible in all piping shop and erection

Review all P&ID and ISO drawing prior to installation piping

Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection

Arrange and witness NDT Inspection Arrange and witnessed PWHT chart and witnessed thermocouple location by subcontractor

Witnessed of all pressure testing (hydrostatic, flushing and drying)

Arrange and reviewed NDT inspection and report

Arrange all document related, during and after fabrication 2.Project: Martabe Gold Project (Project no.5444 10 august 2011- 09 February 2012 Owner: Agincourt Resources

Client : Ausenco

Position : QA/QC INSPECTOR (SMP-Structural, Mechanical and Piping) Responsibility:

Reviewed welding document such as WPS and ITP

Responsible in all piping shop and erection

Review all P&ID and ISO drawing prior to installation piping

Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection

Arrange and witness NDT Inspection Arrange and witnessed PWHT chart and witnessed thermocouple location by subcontractor

Witnessed of all pressure testing (hydrostatic, flushing and drying)

`

MAIRIZON

: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: adpyz6@r.postjobfree.com REFERENCE AVAILABLE ON REQUEST

Arrange and reviewed NDT inspection and report

Arrange all document related, during and after fabrication

PT. Mc. Connell Dowell SEA

September 2009 ~ April 2010

Project: SINGAPORE PARALLEL TRAIN

Client : FWP

Owner: EXXON MOBILE

Position : QA/QC – Piping

Material: Carbon Steel, Stainless Steel, Alloy, LTCS,DSS Responsibility:

Ensure that the requirements for all weld, welder and welding activities are correctly specified and carried out in accordance with the relevant codes, client specifications and contract standards.

Controlling Dimensional before and After Welding As Per Drawing Requirement.

Checked Dimensional and Pipe Spools Orientation As Per Approved Drawing

Carried Out Welding Visual Inspection.

Controlled Consumables Handling and Storage

Release complete spool.

Monitoring NDT Activity and checked NDT Status of Pipe Spools Before Shipment.

Issued Relevant Reports and Counter Sign Quality Record

Coordinates with the construction regarding punch list and quality control activities

PT.Karya Budi Indah as QA/QC Inspector

At Dry Dock Work Graha

December 2008 ~ August 2009

Project: JACK UP DRILLING (L-2004)

Responsibility:

Monitoring all Fabrication actifity

Verified material grade against drawing requirement and material traceability

Checked dimensional prior and after welding

Monitoring Welding actifities and maintain preheat

Inspected all piping spool weld visual prior to nde/Ndtas follow ASME B31.3

Release all piping spool that Visual and Ndt accepted

CV.MITRA BUANA as QA/QC Inspector

At ROTARY ENGINEERING INDONESIA

December 2006 ~ December 2008

Project: -Crude and petroleum storage & it’s related facilities,Universal terminal(s)Pte.Ltd

-Marine loading arm(Emco wheaton)

-Pipe rack (SI Project)

-Ningaloo Vision FPSO(Prosafe)

-Spec Meg Project(foster Wheeler)

Responsibility:

Monitoring all Fabrication actifity of piping, structural

Verified material grade against drawing requirement and material traceability

Checked dimensional prior and after welding

`

MAIRIZON

: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: adpyz6@r.postjobfree.com REFERENCE AVAILABLE ON REQUEST

Monitoring Welding activities and maintain preheat

Inspected all piping spool weld visual prior to nde/Ndtas follow ASME B31.3

Release all piping spool that Visual and Ndt accepted Reference Detail

-Apriza Amir

Fabrication Inspector NOC

Mobile +62(0)812********

-Mr.Retno Saputra

Fabrication Inspector TYRA Project

Mobile +62(0)813********

-Mr.Achmad Nasir

QA/QC Manager of DSAW

Mobile +62(0)816-***-****

-Mr.Iwan tri Prasetyo

Fabrication Inspector Formosa

Mobile +62(0)819********

-Salwarman

QA PT.SMOE

Mobile +62(0)812-***-****

-Mr Kim Kittrell

Lead Welding Engineer of Bechtel Batam Module yard Email:adpyz6@r.postjobfree.com, adpyz6@r.postjobfree.com Original Copy of Certificate and other Document related will be present if and when Required. I hereby declare that all statements given in my application are true and correct to my best of knowledge and belief. Education

1995 – 2002: Diploma III in Japanese art of Bung Hatta University, Indonesia. Other Information

Expected salary is negotiable.

`

MAIRIZON

: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: adpyz6@r.postjobfree.com REFERENCE AVAILABLE ON REQUEST



Contact this candidate