MAIRIZON
: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: *********@*****.*** REFERENCE AVAILABLE ON REQUEST
CURRICULUM
VITAE..doc
Personal Detail
Full Name : Mairizon
Address : Perumahan Bukit sakinah blok Toriqh 1 no.14 Batuaji, Batam Island. Birth Place/Date : Solok 11,November 1976
Marital Status : Married
Nationality : Indonesian
Email mail : *********@*****.***, *********@*****.*** Contact Number : +62-813******** /+62-821********
Passport No : A1542163
Professional Qualification
Senior Welding Inspector CSWIP 3.2.1
MP/PT ASNT Lev.II
RI ASNT Lev.II
UT ASNT Lev.II
T-BOSIET
Carrier Summary
Having more than 15 years in Inspection & Quality Control including supervision, inspection, engineering & prepares quality control procedure and responsible for general quality control activities to confirm that they comply with specified procedure, Client or Customer requirement.
Summary
Course and Training
Welding Inspector CSWIP 3.2.1 TWI LTD, Granta Park, Great Abington, Cambridge, UK. Certificate no. Waiting Certificate
Welding Inspector CSWIP 3.1 TWI LTD, Granta Park, Great Abington, Cambridge, UK. Certificate no.57927
`
MAIRIZON
: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: *********@*****.*** REFERENCE AVAILABLE ON REQUEST
Expiry Date :31/07/2021
Welding Inspector CSWIP 3.0 TWI LTD, Granta Park, Great Abington, Cambridge, UK. Certificate no.35209
Expiry Date :26/07/2013
NDT LEVEL II
- Radiography interpration ASNT Level II
Cert. No. : 52/RI/Re/17
Expiry date :July 2022
- Liquid Penetrant Testing, ASNT Level II
Cert. No. : 120/PT/Re/17
Expiry date : July 2022
- Magnetic Particle Testing, ASNT Level II
Cert. No. : 128/MT/Re/17
Expiry date : July 2022
- Ultrasonic Testing, ASNT Level II
Cert. No. :UT-14051
Expiry date :10/04/2024
- BOSIET
OPITO Vantage No.1638594
Cert. No. :131157071305150490
Expiry date :05/12/2019
Working Experiences
PT.SMOE
January 2019 ~ Present
Project : Gallaf2 (Topside,Jacket and Bridge)
Client : North Oil Company
Position: Lead QC Inspector
Project : Hornsea II Offshore Wind Farm (Topside)
Client : Orstead
Position: Lead QC Inspector
Responsibility:
Reporting to QA/QC manager for all inspection activities and coordination for NDT subcontractor.
Ensuring that the inspectors are aware of all Quality requirements for each project and are in possessions of or have access to the latest revision of project Inspection and Test Plants.
Ensuring that the inspectors progressively inspect fabricated items.
Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.
Coordinating all inspection activities being undertaken in the area involved.
`
MAIRIZON
: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: *********@*****.*** REFERENCE AVAILABLE ON REQUEST
BEREAU VERITAS INDONESIA
November 2017~ October 2018
Client : BHGE
Position: BHGE third Party
Responsibility:
Reviewed Document as per VGS (Vetco Gray spec ) and ITP.
Verification Material before assembly for casing hanger, Subsea tree, wellhead hosing, Intermediate joint( BOX Connector,PIN Connector and Pipe)
Verification Material Inconel for Over lay for hosing.
Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection.
Monitor Drift test for Intermediate joint, Function test.
Monitor production activities to confirm compliance with procedural and client requirement.
Whiteness Hardness test .
Whiteness Hydrotest.
Reviewed NDT report, Coating Report, Painting Report. Heat treatment( Free heat, Post heat and PWHT), Phosphating Report).
Reviewed Hydrostatic Report.
MRB Reviews
Report to QA/QC Coordinator end of day of day.
ABS Consulting
August 2017~ November 2017
Client : BHGE
Position: BHGE third Party
Responsibility:
Reviewed Document as per VGS (Vetco Gray spec ) and ITP.
Verification Material before assembly for casing hanger, Subsea tree, wellhead hosing, Intermediate joint( BOX Connector,PIN Connector and Pipe)
Verification Material Inconel for Over lay for hosing.
Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection.
Monitor Drift test for Intermediate joint, Function test.
Monitor production activities to confirm compliance with procedural and client requirement.
Whiteness Hardness test .
Whiteness Hydrotest.
Reviewed NDT report, Coating Report, Painting Report. Heat treatment( Free heat, Post heat and PWHT), Phosphating Report).
Reviewed Hydrostatic Report.
MRB Reviews
Report to QA/QC Coordinator end of day of day.
SIEMENS
December 2016~ May 2017
Project : YAMAL LNG Project
Client : YAMGAZ
Position: QA/QC Inspector
Responsibility:
Reviewed welding document such as WPS and ITP
Responsible in all piping erection on Module
`
MAIRIZON
: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: *********@*****.*** REFERENCE AVAILABLE ON REQUEST
Review all P&ID and ISO drawing prior to installation piping
Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection
Arrange and witness NDT Inspection Arrange.
Coordinating all inspection activities being undertaken in the area involved
Monitor production activities to confirm compliance with procedural and client requirement.
Line walk
Witnessed of all pressure testing (hydrostatic, flushing and drying)
Arrange and reviewed NDT inspection and report
Arrange all document related, during and after fabrication
Reinstatements
Preparing the punch List and closing.
Report to QA/QC Coordinator end of day.
PT.SMOE
June 2016 ~ 31-August 2016
- Project : YAMAL LNG Project
Client : YAMGAZ
Position: Field Welding Engineer
Responsibility:
Reviewed welding document such as WPS and ITP
Responsible in all piping erection on Module
Review all P&ID and ISO drawing prior to installation piping
Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection
Arrange and witness NDT Inspection Arrange and witnessed PWHT chart and witnessed thermocouple location by subcontractor
Coordinating all inspection activities being undertaken in the area involved
Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.
Witnessed of all pressure testing (hydrostatic, flushing and drying)
Arrange and reviewed NDT inspection and report
Arrange all document related, during and after fabrication
BECHTEL,Batam Module yard
July 2015 ~ may 2016
- Project: Wheat Stones LNG Project
Client : Chevron
Position: Field Welding Engineer
Responsibility:
Read and understanding project specification.
Executes the specific inspections equipment and constuction / installation activities on site, as per quality control and/or inspection test plan(s).
Issues the relevant and countersigns Quality records and when necessary.
Controls daily welding consumables Welding activities.
Maintain availability of AFC drawing and control their revision issue for piping.
Check material traceability.
Inspection of all aspect of related to Structural and Piping welding before, during & after welding.
Ensure and monitoring that all NDT requirement have been done as per project standard and specification.
`
MAIRIZON
: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: *********@*****.*** REFERENCE AVAILABLE ON REQUEST
Line walk for piping with client.
Test pack review & ensure that all data and report are maintain and cover for final dossier and packages.
GLOBAL PROCESS SYSTEM
October 2012 ~ June 2015
- Project: Varanus Island Compressor Project
Client : Apache Energy Limited
Position: QA/QC Coordinator
Responsibility:
Reporting to QA/QC manager for all inspection activities and coordination for NDT subcontractor.
Ensuring that the inspectors are aware of all Quality requirements for each project and are in possessions of or have access to the latest revision of project Inspection and Test Plants
Ensuring that the inspectors progressively inspect fabricated items
Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.
Coordinating all inspection activities being undertaken in the area involved
- Project: Top Side FPSO BUKIT TUA
Client : M3 Energy
Position: QA/QC Coordinator
Responsibility:
Reporting to QA/QC manager for all inspection activities and coordination for NDT subcontractor.
Ensuring that the inspectors are aware of all Quality requirements for each project and are in possessions of or have access to the latest revision of project Inspection and Test Plants
Ensuring that the inspectors progressively inspect fabricated items
Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.
Coordinating all inspection activities being undertaken in the area involved.
- Project: Top Side FPSO LAMSON PROJECT
Client : PTSC ( petrovietnam )
Position: QA/QC Inspector
Responsibility:
Reviewed welding document such as WPS and ITP
Responsible in all piping shop and erection
Review all P&ID and ISO drawing prior to installation piping
Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection
Arrange and witness NDT Inspection Arrange and witnessed PWHT chart and witnessed thermocouple location by subcontractor
Witnessed of all pressure testing (hydrostatic, flushing and drying)
Arrange and reviewed NDT inspection and report
MDR Review.
Arrange all document related, during and after fabrication
`
MAIRIZON
: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: *********@*****.*** REFERENCE AVAILABLE ON REQUEST
WASCO ENG INDONESIA
Feb 2012 ~ September 2012
Project : GLNG PLANT PROJECT
Client : SIEMENS
Owner : BECHTEL
Position : QA/QC Coordinator
Responsibility:
Reporting to QA/QC manager for all inspection activities and coordination for NDT subcontractor.
Ensuring that the inspectors are aware of all Quality requirements for each project and are in possessions of or have access to the latest revision of project Inspection and Test Plants
Ensuring that the inspectors progressively inspect fabricated items
Ensuring that the inspectors monitor production activities to confirm compliance with procedural and client requirement.
Coordinating all inspection activities being undertaken in the area involved
Preparation PQR and WPS for new project as per client requirement
Conduct and witness welder test
PT. Mc. Connell Dowell INDONESIA
May 2010 ~ Feb 2012
1.Project: Toka Tindung Gold Project (Project No.5356&5431) 24 April 2010-25 july 2011 Owner: MSM/TTN
Position : QA/QC INSPECTOR (SMP-Structural, Mechanical and Piping) Responsibility:
Reviewed welding document such as WPS and ITP
Responsible in all piping shop and erection
Review all P&ID and ISO drawing prior to installation piping
Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection
Arrange and witness NDT Inspection Arrange and witnessed PWHT chart and witnessed thermocouple location by subcontractor
Witnessed of all pressure testing (hydrostatic, flushing and drying)
Arrange and reviewed NDT inspection and report
Arrange all document related, during and after fabrication 2.Project: Martabe Gold Project (Project no.5444 10 august 2011- 09 February 2012 Owner: Agincourt Resources
Client : Ausenco
Position : QA/QC INSPECTOR (SMP-Structural, Mechanical and Piping) Responsibility:
Reviewed welding document such as WPS and ITP
Responsible in all piping shop and erection
Review all P&ID and ISO drawing prior to installation piping
Monitoring all fabricated activities such as Fit-up, Welding and Visual inspection
Arrange and witness NDT Inspection Arrange and witnessed PWHT chart and witnessed thermocouple location by subcontractor
Witnessed of all pressure testing (hydrostatic, flushing and drying)
`
MAIRIZON
: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: *********@*****.*** REFERENCE AVAILABLE ON REQUEST
Arrange and reviewed NDT inspection and report
Arrange all document related, during and after fabrication
PT. Mc. Connell Dowell SEA
September 2009 ~ April 2010
Project: SINGAPORE PARALLEL TRAIN
Client : FWP
Owner: EXXON MOBILE
Position : QA/QC – Piping
Material: Carbon Steel, Stainless Steel, Alloy, LTCS,DSS Responsibility:
Ensure that the requirements for all weld, welder and welding activities are correctly specified and carried out in accordance with the relevant codes, client specifications and contract standards.
Controlling Dimensional before and After Welding As Per Drawing Requirement.
Checked Dimensional and Pipe Spools Orientation As Per Approved Drawing
Carried Out Welding Visual Inspection.
Controlled Consumables Handling and Storage
Release complete spool.
Monitoring NDT Activity and checked NDT Status of Pipe Spools Before Shipment.
Issued Relevant Reports and Counter Sign Quality Record
Coordinates with the construction regarding punch list and quality control activities
PT.Karya Budi Indah as QA/QC Inspector
At Dry Dock Work Graha
December 2008 ~ August 2009
Project: JACK UP DRILLING (L-2004)
Responsibility:
Monitoring all Fabrication actifity
Verified material grade against drawing requirement and material traceability
Checked dimensional prior and after welding
Monitoring Welding actifities and maintain preheat
Inspected all piping spool weld visual prior to nde/Ndtas follow ASME B31.3
Release all piping spool that Visual and Ndt accepted
CV.MITRA BUANA as QA/QC Inspector
At ROTARY ENGINEERING INDONESIA
December 2006 ~ December 2008
Project: -Crude and petroleum storage & it’s related facilities,Universal terminal(s)Pte.Ltd
-Marine loading arm(Emco wheaton)
-Pipe rack (SI Project)
-Ningaloo Vision FPSO(Prosafe)
-Spec Meg Project(foster Wheeler)
Responsibility:
Monitoring all Fabrication actifity of piping, structural
Verified material grade against drawing requirement and material traceability
Checked dimensional prior and after welding
`
MAIRIZON
: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: *********@*****.*** REFERENCE AVAILABLE ON REQUEST
Monitoring Welding activities and maintain preheat
Inspected all piping spool weld visual prior to nde/Ndtas follow ASME B31.3
Release all piping spool that Visual and Ndt accepted Reference Detail
-Apriza Amir
Fabrication Inspector NOC
Mobile +62(0)812********
-Mr.Retno Saputra
Fabrication Inspector TYRA Project
Mobile +62(0)813********
-Mr.Achmad Nasir
QA/QC Manager of DSAW
Mobile +62(0)816-***-****
-Mr.Iwan tri Prasetyo
Fabrication Inspector Formosa
Mobile +62(0)819********
-Salwarman
QA PT.SMOE
Mobile +62(0)812-***-****
-Mr Kim Kittrell
Lead Welding Engineer of Bechtel Batam Module yard Email:*********@*******.***, **********@*****.*** Original Copy of Certificate and other Document related will be present if and when Required. I hereby declare that all statements given in my application are true and correct to my best of knowledge and belief. Education
1995 – 2002: Diploma III in Japanese art of Bung Hatta University, Indonesia. Other Information
Expected salary is negotiable.
`
MAIRIZON
: Perum.Bukit sakinah Blok Toriqhi I no.14 Batuaji.Batam Island. Indonesia 29943. : +628********** or +628********** E-mail: *********@*****.*** REFERENCE AVAILABLE ON REQUEST