MURUGAN THILLAI JAYARAMAN
Mobile:
=+919****-***** / +919****-*****
*********@**********.***
Position Applied : SENIOR ELECTRICAL ENGINEER
Availability : One Month
Date of Birth : 30th JULY1968
Nationality : Indian
Languages : English
PROFILE
Have more than Twenty PLUS (20+) years of Oil& Gas experience(14 YRS) these includes Construction & Commissioning /START UP Experience in executing are supervising work in India and Overseas in all aspects of Electrical & Instrument related to Onshore/ Offshore Oil and Gas Industries and Ship conversion industry (Marine). Have extensive experience in Erection, Installation, Pre-commissioning, Commissioning, Start-up and Operations of Gas and Oil processing platforms, Petrochemical export refinery,, FPSO, FSRU and Bulk carrier vessels and GTL (Gas to LIQUID PROJECT)
Have worked on HV – 33KV/11KV/6.6KV/3.3KV also worked on Electrical Distribution and installations /pre-commissioning with HT/LT transformer
Have worked as Construction/ Commissioning /Start up (E&I ) including of Maintenance
Have worked for Client & EPC Companies SAUDI ARAMCO /PETROBRAS Brazil, Sonangal- Angola, ENI services Italy, Saipem - Italy/Dubai, SHELL Qatar
Worked for morethan 14 years on offshore projects and onshore projects
QUALIFICATIONS
1991 Bachelor of Engineering (Electrical-&Electronic Engineering)
Computer Skills: Ms Word, Excel, Spreadsheet, Outlook Express, Internet, AutoCAD, Adobe
TRAININGS
Basic Sea survival coarse approved by OPITO –Abu Dhabi including Huet, Fire fighting, EBS & H2S –
SAUDI ARAMCO WORK PERMIT HOLDER
WORK EXPERIENCE
March 2014 to Till date Lead Electrical Engineer
Project : Al Wasit Project Hasbha & Arabiyah onshore & offshore facility – Saudi Arabia
Client : Saudi Aramco (Wasit Gas program)
Offshore : more than one year (Marjan and Hasbha / Arabiyah offshore )
Involving complete hook up activities of all the Hasbha and Arabiyah offshore well head platforms electrical activities including
cathodic protection
24 Volts batteries charger
13.8 Kv submarine umbilical composite cable installations and splicing
Involving and co-ordination of pre-comm activities
Complete earthing activities
Well head platforms lightings and helideck lightings
Get along with engineering for design issues to solve the problems arriving at site.
Participating in the preparation of all offshore commissioning activities related to the Electrical discipline in cooperation with sub - contractors and vendors.
Ensuring necessary HSE reviews are undertaken and identified actions completed. Monitor lockout & tag out procedure was followed by appointing trained personnel in the switchgear.
Coordinating and supervising the team executing the discipline work activities and assisting with relevant technical support as required, including mentoring
The commissioning and start-up test was performed in the presence of Contractor Representative and Vendors.
April 2012 to Dec 2013 Lead Electrical Engineer
Project : FSRU LNG Project (Dubai Dry-docks & Italy offshore)
Client : Offshore LNG Toscana- Italy
Offshore : Six Months
Supervise during the electrical discipline aspects of mechanical completion, commissioning & startup activities of HV/LV distribution (6.6Kv/460V), which includes HV/LV switchgears/MCC, HT/LT Transformer, AC/DC UPS, Navigation Aids, Lighting, VFD & process systems.
Commissioning power generations systems like 6.6 KV Steam generators/ 6.6 KV Diesel gensets using inductive and resistance combination load bank.
Get along with engineering for design issues to solve the problems arriving at site.
Participating in the preparation of all offshore commissioning activities related to the Electrical discipline in cooperation with contractors and vendors. This includes preparation of commissioning procedures & OTP; Check & Record sheets and detailed commissioning schedules.
Ensuring necessary HSE reviews are undertaken and identified actions completed. Monitor lockout & tag out procedure was followed by appointing trained personnel in the switchgear.
Coordinating and supervising the team executing the discipline work activities and assisting with relevant technical support as required, including mentoring and on the job training of junior personnel.
Participating in daily & weekly meetings within the commissioning team & preparing weekly status report to the nominated commissioning system engineers and to resolve any shortcomings.
Supervises commissioning services contractor’s personnel and vendors representatives.
Ensuring that relevant documentation is prepared and made ready for system hand over thereby checking the check sheets and record sheets to Production & Maintenance organization.
Contributing to Commissioning support for Start-up using the WINPCS methodology.
Participating in and assisting with the co-ordination of the Project’s performance test(s).
Ensuring that any outstanding actions for system hand over to commissioning are duly recorded and are effectively cleared as per the technical requirements.
Liaise with Contractors and Consultants to clear the punches issued during construction, commissioning and start up as per the standards and handover to operation team.
Commissioning and Start-Up activities:
-preparing the PTW according with Dubai Dry Dock requirements and rules
-preparing the Temporary LV Power Supply
Three Diesel Generators synchronized, parallel connection (two DG live, one DG in stand-by) connected to Main MV bus bar.
-preparing the daily technical and HSE meeting according with the planned activities
-preparing the necessary design documents (drawings, layout, electrical interconnection, data sheet)
-preparing the Test Sheets and OTP’s performing for followings equipment and systems:
1.
6.6 KV HV distribution boards including protection relay setting (AREVA . ABB VD4 breakers with primary and secondary injection).
Bus bar HV insulation tests (5 kV Megger), continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value)
Secondary DC circuits test for each cabinet and energizing
Secondary injection for relays settings (Omicron Injection kit)
Primary injection for differential protection testing
Automatic Transfer Source (ATS) logic test
Testing of Intertrip / Interlock logical
DCS communication test (alarms, status)
2 LV distribution boards including protection relay setting (AREVA P127, P141, with primary and secondary injection).
Bus bar LV insulation tests (1 kV Megger), continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value)
Secondary DC circuits test for each cabinet and energizing
Secondary injection for relays settings (Omicron Injection kit)
Energizing the LV Distribution Board from Temporary LV Power supply (2x1250 kVA Diesel Generators)
Automatic Transfer Source (ATS) logic test
Testing of Intertrip / Interlock logical
DCS communication test (alarms, status)
3 LV Variable Speed Drivers (VSD Schneider)
Crane Motor and Air Compressor Main Motor
4 Dual UPS systems (2x 120kVA; Chloride)
Battery bank load test (charging / discharging using load bank)
By-pass working test
Power transfer for maintenance test
DCS communication test (alarms, status)
5Emergency Diesel Generator
Power quality test (Voltage, current, frequency, harmonics)
Endurance test on the load banks
Starting dual battery bank tests
Auto / Man Synchronization with the main power
Power sheering test
Automatic Transfer Source (ATS) logic test
DCS communication test (alarms, status)
6Emergency LV Distribution Board
Bus bar insulation tests (1 kV Megger), continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value)
Secondary DC circuits test for each cabinet and energizing
Secondary injection for relays settings (Omicron Injection kit)
Energizing the LV Distribution Board from Main Distribution board
Automatic Transfer Source (ATS) logic test with EDG
Testing of Intertrip / Interlock logical
DCS communication test (alarms, status)
7Dual Battery rectifier (110V DC; Chloride)
Battery bank load test (charging / discharging using load bank)
Power transfer for maintenance test
DCS communication test (alarms, status)
8MCC panels
Protection relays settings using secondary injection kit according with the design for motors, coolers, pumps
DCS communication test (alarms, status)
Phase rotation test (on the panels and field)
Power cables insulation, continuity, drop voltage tests
Motors vibration and temperature measurements
9Normal and emergency lighting
LV cables testing (insulation, continuity, connections)
Lighting fixtures checking
JB sealing and connection checking
Energisation and light level measurements
10Lightning and grounding
continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value
11Trace heating system
LV Distribution Panel checking (leakage current protection test)
Insulation test
Energisation and temperature control checking
DCS communication test (alarms, status)
126 x 2 MVA transformers 6.6 kV / 460 V
Primary and secondary winding insulation test
Primary and secondary winding continuity and resistance
Marshaling box checking (oil temperature, oil level, gas pressure)
Oil breakdown voltage test (laboratory test)
Transformer ratio check
Energisation from Temporary Power Supply and OTP performing
13HV Motors
HV Power cables insulation, continuity,
Protection Areva relay setting
Phase rotation test (on the panels and field)
Motors vibration and temperature measurements
DCS communication test (alarms, status, control)
14DG Load Testing
Steam Turbine Generators 6.6 KV, 10 MW performance load test using load bank
Main Diesel Generator 6.6 KV, 3,3 MW performance load test using load bank
Steam Turbine Generators 6.6 KV, 3.3 MW performance load test using load bank
Load test with step of 25%,50%,75%,100% & 110%
Load rejection test from 100% to 50%to 0%
Load rejection test from 100% to 0%
Syncho Checks using load bank for two more generators
15PMS Test
Remote Synchronization between the two or more generators
Load Sharing test
Load Shedding test
Preferential shedding test
DG Auto start for back up test
Remote start and stop MV Motors
Remote start and stop LV Motors
Remote Open/close the MV breakers
Remote Open/close the LV breakers
Monitoring Active and reactive power
Earth fault monitoring of MV switch boards
Earth fault monitoring of LV switch boards
Monitoring UPS Systems
Monitoring of Nav Aids systems
The commissioning and start-up test was performed in the presence of Contractor Representative and Vendors.
Mar 2011 to Nov 2011 Senior Electrical Engineer
Project : FPSO AQUILA -II (Dubai Dry-docks & Italy offshore)
Client : ENI Services - Italy
Offshore : Four Months
Supervise/Perform the electrical discipline aspects of all installation, inspections, mechanical completion, commissioning & startup activities of HV/LV Power generation (11kV/460V) & distribution, and Offshore Oil & Gas Production at offshore Italy
Conversion done at Dubai Dry Dock
Ensuring all Electrical/Instrumentation work packs (mechanical completion Check sheets) and pre-commissioning/commissioning documentation & dossier is available from contractor in accordance with progress requirements.
Allocation of tasks for all the Electrical Engineers in reviewing and completion of the punch list items prior to the Pre-commissioning and Commissioning activities.
Coordinate with WinPCS team during the preparation of pre-commissioning & commissioning check sheets & record sheets.
Manage the commissioning activities of the electrical discipline as per the project schedule and execute the activities successfully.
Liaise with Contractors and Consultants during the commissioning of HV/LV switch gear & transformer, UPS, lighting, power distribution, F&G, PA/GA, alarm monitoring and grounding systems.
Participating in daily & weekly meetings within the commissioning team & preparing weekly status report to the nominated commissioning system engineers.
Ensuring that relevant documentation is prepared and made ready for system hand over to Production & Maintenance organization.
Perform tests for HV Switchgear, transformer, LV switchgear, UPS according to SMC methodology.
Developing the Nationals by sharing the practical Experiences and knowledge, involving nationals in critical jobs by proving the required trainings.
Monitor the Isolation/ De-isolation of switchgears with lockout & tag out procedure.
The electrical Commissioning activities:
-preparing the Temporary LV Power Supply
Two Diesel Generators, parallel connection ( one DG live, one DG in stand-by) connected to Main MV bus bar.
-preparing the daily technical and HSE meeting according with the planned activities
-preparing the necessary design documents (drawings, layout, electrical interconnection, data sheet)
- preparing the Test Sheets and OTP’s performing for followings equipment and systems:
1.HV Switchgear (IMESA -ITALY)
Bus bar HV insulation tests (5 kV Megger), continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value)
Secondary DC circuits test for each cabinet and energizing
Secondary injection for relays settings (Megger Injection kit)
Testing of Intertrip / Interlock logical
DCS communication test (alarms, status)
2.HV / LV transformer
Primary and secondary winding insulation test
Primary and secondary winding continuity and resistance
Marshaling box checking (oil temperature, oil level, gas pressure)
Transformer ratio check
3.LV Switchgear (IMESA -ITALY)
Bus bar insulation tests (1 kV Megger), continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value)
Secondary DC circuits test for each cabinet and energizing
Secondary injection for relays settings (Megger Injection kit)
Energizing the LV Distribution Board from Temporary Power Supply
Testing of Intertrip / Interlock logical
DCS communication test (alarms, status)
4.Lighting Transformer (dry type)
Primary and secondary winding insulation test
Primary and secondary winding continuity and resistance
Transformer ratio check
5.MCC testing and relay setting (Areva secondary injection)
Protection relays settings using secondary injection kit according with the design for motors, coolers, pumps
DCS communication test (alarms, status)
Phase rotation test (on the panels and field)
Power cables insulation, continuity, drop voltage tests
Motors vibration and temperature measurements
6. DC Charger for Emergency Lighting (Chloride)
Battery bank load test (charging / discharging using load bank)
DCS communication test (alarms, status)
7.UPS systems (120 kVA; CEG/ITALY)
Battery bank load test (charging / discharging using load bank)
By-pass working test
Power transfer for maintenance test
DCS communication test (alarms, status)
8.Normal Lighting Distribution Board and System
LV cables testing (insulation, continuity, connections)
Lighting fixtures checking
JB sealing and connection checking
Energisation and light level measurements
9.Emergency Lighting Distribution Board and System
LV cables testing (insulation, continuity, connections)
Lighting fixtures checking
JB sealing and connection checking
Energisation and light level measurements
10.Heat Tracing Distribution board and System
LV Distribution Panel checking (leakage current protection test)
Insulation test
Energisation and temperature control checking
DCS communication test (alarms, status)
11.Navigation System (SICE-ITALY)
Battery bank load test (charging / discharging using load bank)
Lighting fixture checking
Beacon radar checking
12.Lightning and grounding installation
continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque
13DG Load Testing
Steam Turbine Generators 6.6 KV, 10 MW performance load test using load bank
Two Main Diesel Generator 460 V, 1 MW performance load test using load bank
Load test with step of 25%,50%,75%,100% & 110%
Load rejection test from 100% to 50%to 0%
Load rejection test from 100% to 0%
14Syncho Checks using load bank for two more generators
The commissioning and start-up test was performed in the presence of Contractor Representative and Vendors.
Jan 2010 to Dec 2010 Shell GTL Projects – QATAR
Senior Electrical Engineer
Projects: GTL PROJECTS (Gas to Liquid)
Client : Shell – Qatar –Raslafan city –Qatar
Supervise during the electrical discipline aspects of mechanical completion, commissioning & startup activities of HV/LV distribution (33KV/ 6.6Kv/680V), which includes HV/LV switchgears/MCC, HT/LT Transformer, AC/DC UPS, Navigation Aids, Lighting, VFD & process systems.
Get along with engineering for design issues to solve the problems arriving at site.
Participating in the preparation of all offshore commissioning activities related to the Electrical discipline in cooperation with contractors and vendors. This includes preparation of commissioning procedures & OTP; Check & Record sheets and detailed commissioning schedules.
Ensuring necessary HSE reviews are undertaken and identified actions completed. Monitor lockout & tag out procedure was followed by appointing trained personnel in the switchgear.
Coordinating and supervising the team executing the discipline work activities and assisting with relevant technical support as required, including mentoring and on the job training of junior personnel.
Participating in daily & weekly meetings within the commissioning team & preparing weekly status report to the nominated commissioning system engineers and to resolve any shortcomings.
Supervises commissioning services contractor’s personnel and vendors representatives.
Ensuring that relevant documentation is prepared and made ready for system hand over thereby checking the check sheets and record sheets to Production & Maintenance organization.
Contributing to Commissioning support for Start-up using the WINPCS methodology.
Participating in and assisting with the co-ordination of the Project’s performance test(s).
Ensuring that any outstanding actions for system hand over to commissioning are duly recorded and are effectively cleared as per the technical requirements.
Liaise with Contractors and Consultants to clear the punches issued during construction, commissioning and start up as per the standards and handover to operation team.
standards and handover to operation team..
Jan 2008 to Dec 2009 Electrical Engineer
Project : FPSO GIMBOA (Dubai Dry-docks & Angola offshore)
Client : Sonangal- Angola
Offshore : Seven Months
Carry out Installation, Erection, Testing & Commissioning of Electrical & instrument systems and equipment.
Carry out execution of electrical commissioning activities on the LV/MV MCC/SWGR Power Management System and related equipment viz. (Protective relays)
Perform preventive maintenance activities on electrical systems involved in rig (offshore).
Attend break downs/system malfunctioning of 690 Volt Power generation & distribution (480/230/110v), Switch gears/MCC's, VFD's, drilling equipments includes National Oil well Mud pumps, Draworks & Top drive, HVAC and Utility systems.
Prepare Job Safety Analysis and adhere of electrical safety rules.
Supervise the assistant electricians for new installations onboard
Do inspection for third party equipments. Hookup cables and other electrical related issues of Client and report to Maintenance Supervisor/OIM
Sourcing of critical spares required for normal operation
Update AMOS system (PMS) and work accordingly.
Commissioning power generations systems like 6.6 KV Steam generators/ 6.6 KV Diesel gensets using inductive and resistance combination load bank.
16 x 2 MVA transformers 6.6 kV / 460 V
Primary and secondary winding insulation test
Primary and secondary winding continuity and resistance
Marshaling box checking (oil temperature, oil level, gas pressure)
Oil breakdown voltage test (laboratory test)
Transformer ratio check
Energisation from Temporary Power Supply and OTP performing
2 HV Motors
HV Power cables insulation, continuity,
Protection Areva relay setting
Phase rotation test (on the panels and field)
Motors vibration and temperature measurements
DCS communication test (alarms, status, control)
3DG Load Testing
Steam Turbine Generators 6.6 KV, 10 MW performance load test using load bank
Emergency Diesel Generator 460V, 450 KW performance load test using load bank
Load test with step of 25%,50%,75%,100% & 110%
Load rejection test from 100% to 50%to 0%
Load rejection test from 100% to 0%
Syncho Checks using load bank for two more generators
4PMS Test
Remote Synchronization between the two or more generators
Load Sharing test
Load Shedding test
Preferential shedding test
DG Auto start for back up test
Remote start and stop MV Motors
Remote start and stop LV Motors
Remote Open/close the MV breakers
Remote Open/close the LV breakers
Monitoring Active and reactive power
Earth fault monitoring of MV switch boards
Earth fault monitoring of LV switch boards
Monitoring UPS Systems
Monitoring of Nav Aids systems
The commissioning and start-up test was performed in the presence of Contractor Representative and Vendors.
Oct 2006 to Nov 2007 Electrical Engineer
Project : FPSO VITORIA-II (Dubai Dry-docks &Brazil offshore)
Client : Petrobras-Brazil
Offshore : 12 Months
Review of ITP and Commissioning test procedures and apply for electrical systems.
Ensuring that any outstanding actions for system hand over to commissioning are duly recorded and are effectively cleared as per the technical requirements.
Coordinate witness and perform trial run tests of Marine during construction of Cargo vessels at shipyard.
Start up and energization of generators, transformers and several motor control centers.
Perform hipot test for HV switchgears and verify the protection device parameters of starter.
Provide inspection status, defect list status, trial and progress status to all concerned.
Involved in Inspection and pre-commissioning of: Power Generation and Distribution systems; HVAC systems, UPS & Lighting systems; Fire/Gas system, Public Address system; & ESD and Utility systems.
Commissioning power generations systems like 11 KV Steam generators/ 11 KV Diesel gensets using inductive and resistance combination load bank.
1.
11 KV HV distribution boards including protection relay setting (AREVA . ABB VD4 breakers with primary and secondary injection).
Bus bar HV insulation tests (5 kV Megger), continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value)
Secondary DC circuits test for each cabinet and energizing
Secondary injection for relays settings (Omicron Injection kit)
Primary injection for differential protection testing
Automatic Transfer Source (ATS) logic test
Testing of Intertrip / Interlock logical
DCS communication test (alarms, status)
2 LV distribution boards including protection relay setting (AREVA P127, P141, with primary and secondary injection).
Bus bar LV insulation tests (1 kV Megger), continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value)
Secondary DC circuits test for each cabinet and energizing
Secondary injection for relays settings (Omicron Injection kit)
Energizing the LV Distribution Board from Temporary LV Power supply (2x1250 kVA Diesel Generators)
Automatic Transfer Source (ATS) logic test
Testing of Intertrip / Interlock logical
DCS communication test (alarms, status)
3 LV Variable Speed Drivers (VSD Schneider)
Crane Motor and Air Compressor Main Motor
4 Dual UPS systems (2x 60kVA; Chloride)
Battery bank load test (charging / discharging using load bank)
By-pass working test
Power transfer for maintenance test
DCS communication test (alarms, status)
5Emergency Diesel Generator
Power quality test (Voltage, current, frequency, harmonics)
Endurance test on the load banks
Starting dual battery bank tests
Auto / Man Synchronization with the main power
Power sheering test
Automatic Transfer Source (ATS) logic test
DCS communication test (alarms, status)
6Emergency LV Distribution Board
Bus bar insulation tests (1 kV Megger), continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value)
Secondary DC circuits test for each cabinet and energizing
Secondary injection for relays settings (Omicron Injection kit)
Energizing the LV Distribution Board from Main Distribution board
Automatic Transfer Source (ATS) logic test with EDG
Testing of Intertrip / Interlock logical
DCS communication test (alarms, status)
7Dual Battery rectifier (110V DC; Chloride)
Battery bank load test (charging / discharging using load bank)
Power transfer for maintenance test
DCS communication test (alarms, status)
8MCC panels
Protection relays settings using secondary injection kit according with the design for motors, coolers, pumps
DCS communication test (alarms, status)
Phase rotation test (on the panels and field)
Power cables insulation, continuity, drop voltage tests
Motors vibration and temperature measurements
9Normal and emergency lighting
LV cables testing (insulation, continuity, connections)
Lighting fixtures checking
JB sealing and connection checking
Energisation and light level measurements
10Lightning and grounding
continuity and contacts quality (Low Resistance Ohmmeter / Ductor, torque value
11Trace heating system
LV Distribution Panel checking (leakage current protection test)
Insulation test
Energisation and temperature control checking
DCS communication test (alarms, status)
126 x 2 MVA transformers 6.6 kV / 460 V
Primary and secondary winding insulation test
Primary and secondary winding continuity and resistance
Marshaling box checking (oil temperature, oil level, gas pressure)
Oil breakdown voltage test (laboratory test)
Transformer ratio check
Energisation from Temporary Power Supply and OTP performing
13HV Motors
HV Power cables insulation, continuity,
Protection Areva relay setting
Phase rotation test (on the panels and field)
Motors vibration and temperature measurements
DCS communication test (alarms, status, control)
14DG Load Testing
Steam Turbine Generators 6.6 KV, 10 MW performance load test using load bank
SOLAR Turbine Generators 6.6 KV, 10 MW performance load test using load bank
Load test with step of 25%,50%,75%,100% & 110%
Load rejection test from 100% to 50%to 0%
Load rejection test from 100% to 0%
Syncho Checks using load bank for two more generators
15PMS Test
Remote Synchronization between the two or more generators
Load Sharing test
Load Shedding test
Preferential shedding test
DG Auto start for back up test
Remote start and stop MV Motors
Remote start and stop LV Motors
Remote Open/close the MV breakers
Remote Open/close the LV breakers
Monitoring Active and reactive power
Earth fault monitoring of MV switch boards
Earth fault monitoring of LV switch boards
The commissioning and start-up test was performed in the presence of Contractor Representative and Vendors.
2004 to 2006 ABB LIMITED – Bangaluru -India
Site Engineer
Projects : WIPRO SOFTWARE PARK -BANGALURU AND WOCKHARD HOSPITALS
Client : WIPRO / WOCKHARD
Department : Building Division and Building Automation Division
Lead a team for calibration, loop checking and pre-commissioning of power and instrument systems involved during the construction of vessels.
Attend FAT’s and check the performance of the system as per IEEE/IEC standard.
Commissioning of utility and HVAC systems.
Coordinate with clients and certifying agencies for daily inspection activities.
Test the I/O points for vessel monitoring systems.
Review the check sheets and confirm with the vendor data provided by the contractor.
Preparation of Test reports. Review of Schematic drawings & Cable schedule. Preparation of Testing and Commissioning activities Schedule. Preparation of work procedure for modification work. Preparation of as built drawings. Vendor co-ordinations Preparation of Job Safety Analysis (JSA) Co-ordination with clients and work force supervisors Preparation of work schedule and start-up co-ordinations Preparation of work permit and co-ordination of execution Total electrifications work including erection, testing and commissioning of Transformers, HT switchgears, LT switch gears, Diesel Gensets and 3000 A sand wich busduct and SCADA system
1995 to 2004 PETRON ENGINEERING CONSTRUCTION LIMITED –MUMBAI
Electrical Engineer
Client : ACC CEMENTS LIMITED/ MANALI PETROCHEMICALS LIMITED
Perform mechanical completion & commissioning activities for electrical & instrument equipments.
Coordinating and supervising the team executing the discipline work activities and assisting with relevant technical support as required, including mentoring and On the job training of junior personnel
Participating in and assisting with the co-ordination of the Project’s performance test
Do calibration and loop checking, megger testing of HV/LV power cables.
Perform megger test and measure the winding resistance for all electrical motors.
Assist vendor during commissioning of generators, MCC, UPS, F&G, PAGA and utility systems
Implement all activities in accordance with company safety procedures and manufacturer’s recommendations in hazardous and non hazardous area classification.
1994 to 1995 APPRENCESHIP TRANIEE-Office of the Chief Electrical Inspector to Government- CHENNAI/INDIA
Undergone training in the Government Electrical standards laboratory to calibrating the Rotating sub standard meters. KWH meters, RSSKVArh meters, Trivector meters, measuring instruments such as ammeters, voltmeters, tong testers, earth testers, insulation testers, and testing of motors, high voltage transformers, and high voltage cables.
1992 to 1993 ASSISTANCE