CURRICULUM VITAE
Mudassar Sohail
Land Surveyor +Building Surveyor
Mobile Number: 052*******
E-mail ID :******************@*****.***
PERSONAL PROFILE:
Nationality: Pakistani
Date of Birth: 5th October, 1991
NIC NBR PAK:35404-6369435-1
ID NBR UAE:784-1991-1497215-3
Passport NBR: FB5194351
Marital status: Married
Languages known: English, Arabic, Hindi
PROFESSIONAL QUALI FICATIONS
3YEARS Diploma of Associate Engineer from ALI INSTITUTE OF TECHNOLOGY&TEXTILE, SHEIKHUPURA Punjab Pakistan.
SSC FROM GOVT, HIGH SCHOOL, GHANG SHEIKHUPURA, PAKISTAN.
CERTIFICATE OF TRAINING SOKKIA TOTAL STATION PUNJAB PAKISTAN
P R O F E S S I O N A L E X P E R I E N C E
(A). Organization:AL Habtoor Leighton group of company UAE
Project (1): AL HABTOOR CITY-RESIDENTIAL TOWERS (RESIDENCES)(DUBAI)
Contract value US dollar 395Million
Duration : January 2014 September 2018 Position: Building Surveyor
Responsibilities.
• Excavation of work at site as per drawing .
• layout and level work as per given drawing .
. Preparing the bar bending scheduled
. Calculate the material for site work.
. Manage the labour site.
• Calculation Coordinates, Preparing Survey Reports for Inspection
• Can check error in level Machine and Total Station
• Layout of any structure (curves &straight
• Traverse and triangulation to provide controls points for setting out
. Layout of core wall tower and mep base plates marking
. Columns and beams marking and check plumb
(B).
• : Descon Engineering Limited
•
• Position : Surveyor
• Duration: : December, 2012-December, 2014
. Responsibilities :
• Lay out of Bridge Piling Colum & Transom.
• Lay out of Horizontal & Vertical Curve
• To manage the site on a day to day basis that includes supervising and monitoring all survey
• To check drawings, plans, and other qualities to get an accurate calculation of the whole thing.
• Responsible for the preparation and approval of all survey report and revision.
• To act as main technical advisors.
• Closely coordinates with the consultant, district engineer and department head.
• Determine methods and procedures for establishing or re-establishing survey control.
• Execute total station for center line, benchmark, and contour points.
• Make survey report for cut and fill, top of Embankment, Sub grade/Aggregate materials, and BBC/BWC for asphalt pavement and cement for bridges
(C). current company DUBAI
AMANA Steel contracting @Building w L.L.C company UAE
PROJECT: EKFC DUBAI SOUTH
Position: land Surveyor
RESPONSIBILITIES:
Mep excavation of work At site as per drawing.
Calculate the material for site work
Manage the labour at site
Check all mep work at site as per drawing
Layout of columns @beams and staircase at site as per drawing
Layout of any structure at site as per drawing
Technical skills @instrument uses
Total station: Nikon Sokia, Topcon
Calculation Coordinates
Level: Auto level and Automatic level
Auto Cad 2d and Civil 3d, land Spacing
MS world MS Excel
Microsoft Word, Excel, Power point,
Complete Internet Proficiency
Computer skills
Auto CAD,2D
Microsoft word,excel,power point