Contact no: 009**-********
*****.********@*****.***
1
MUHAMMAD SAJID HUSAIN
LAND SURVEYOR
Omani driving license holder
CAREER OBJECTIVE PERSONAL PARTICULARS
Seeking a challenging, performance based and rewarding position in a reputed and progressive organization with an aim to enhance the credibility and goodwill of the organization and to develop professional skills and expertise on continuous basis. ACADEMIC QUALIFICATION
2004 Matriculation
Board of Intermediate & Secondary Education Multan. PROFESSIONAL QUALIFICATIONS
Diploma Surveying.
Skill development council Multan
INSTRUMENTs USED
• GPS Sokkia & Level Machines
• Different Types of Total Station
Topcon GPT 7500
Leica Bulder 503
Leica ts 06
Leica Builder R300 and TS09
Sokkia Rx 350 &Sokkia Rx 310
GPS Topcon
Electronics and digital level machine.
WORK EXPERIENCE
1. Name of Employer: SPECIAL GOLDEN BRIDGE TRADING. Position held: Land Surveyor
Location: Oman
Period: November 2019 to till November 2021.
Project: Upgradation of Water Pumping Station in Rustaq and Awabi Wilayats. This Project is under direct authority of Public Authority of Water and Electricity (PAEW). It comprises upgradation of pumping stations in Rustaq and Awabi Wilayats. It involves works of Excavation, Pipe lining, Flow meter chamber Manholes construction, Pump foundation etc.
Job Description
• Responsible of all works from execution till commissioning including all survey & Supervision works.
2. Name of Employer: MALIK CONSTRUCTION COMPANY.
Position held: Land Surveyor
Location: Pakistan
Period: Aug 2017 to October 2019
Project: Miscellaneous Building Projects
Contact no: 009**-********
*****.********@*****.***
2
Job Description
• Responsible of all works from execution till commissioning including all survey works
3. Name of Employer: FERROVIAL AGROMAN & FEDERICI STIRLING BATCON JV. Position held: Land Surveyor
Location: Oman
Period: January2014 to June2017
Project: Construction of Batinah Expressway Package 5 The Batinah Expressway project comprises the construction of an expressway class road with a dual 2x4 lane configuration through the Batinah region. The Package.5 comprises part of main expressway from KM 180+000 to 221+000 (41km of expressway) The Construction works include the following major structures:2 Cloverleaf interchanges at Falaj al Qabail at 196+500 &Sohar industrial area at 205+100, 1 Partial Cloverleaf interchange at Liwa at 213+500, 3 Wadi Bridges: Wadi Al Jizi – Wadi Bani Umer – Wadi Fizh, 4 Underpass Bridges: U.P Bridge1 – Gas Line U.P – Sohar U.P – Railway U.P, 1 Flyover Bridge at 183+200, 4 Weigh Stations, 2 Service Areas and 4 Rest Areas and comprises 130 single and multi-cell reinforced concrete box culverts, median drainage system, dykes and embankment protections
Job Description
• Demarcation of bridges and Culverts.
• All kind of Simple lay out and give level for Excavation and Shuttering.
• Give the line for walls and level for Concrete Shuttering.
• One Internal link Road work and Topo Survey.
• Cross Section and as built Drawing works.
4. Name of Employer: FEDERICI STIRLING BATCO.
Position held: Land Surveyor
Location: Oman
Period: January 2013 to December 2014
Project: Construction of Wadi Adai Interchange
The Wadi Adai Interchange Project comprises the replacement of an Existing roundabout by the establishment of a Third Level trumpet arrangement that facilitates left turns and an under bridge signalized intersection.
The Construction works include the followings:
- A third level steel structure tow twin Bridges of Steel Box Girder structure with 2 RC Abutments and 7 twin decorative high piers, resting on Cast-in-Situ bored piles.
- Road works: The scope of work includes:
- Widening of the existing pavement with necessary camber corrections and new carriage way constructions, curbs, sidewalks, signing, marking, utilities and relocation, drainage, street lighting and safety barrier for works needed to deliver an appropriate finished pavement in designated areas, Changing the roundabout into a signalized at-grade intersection, Constructing two new “Loop” roads and approach roads, Mechanically Stabilized Earth (MSE) Walls, Construction of double Cell Box Culvert size 2 x (3mx4m) for a length of almost 1000 lm in a very urbanized and a utility congested area, under and adjacent to active Governmental buildings and life roads. Job Description
• All kind of Simple lay out and give level for Excavation and Shuttering.
• Give the line for walls and level for Concrete Shuttering.
• One Internal link Road work and Topo Survey.
• Cross Section and as built Drawing works.
Contact no: 009**-********
*****.********@*****.***
3
5. Name of Employer: FEDERICI STIRLING BATCO.
Position held: Land Surveyor
Location: Oman
Period: June2011 to December 2012
Project: Dualization of Road: Zurub to Al-Buraimi Hospital Roundabout The project will allow the dualization of an existing single carriageway. A 17 kilometers dual carriageway and service road of a total length of 27 kilometers will be constructed. Description of work:
• Construction of a 90 meters long post-tensioned three-cell box girder flyover bridge
• Construction of two 53 meters long post-tensioned four-cell box girder interchanges bridges
• Construction of four pedestrian underpasses 4 m x 4 m x 45 m
• Road works including road stretching to approximately 1,000 m
• Construction of a road leading to the UAE’s border check post
• Water drainage, asphalt works, signing and marking
• Public utility service and traffic diversion andprotection Job Description
• All kind of Simple lay out and give level for Excavation and Shuttering.
• Give the line for walls and level for Concrete Shuttering.
• One Internal link Road work and Topo Survey.
• Cross Section and as built Drawing works.
PERSONAL INFORMATION
Father Name : Muhammad Sabir
Date of Birth : 01 Feb 1990
Nationality : Pakistani
Religion : Islam
Whatsapp : 009**-********
LANGUAGES KNOWN
English
Urdu
Arabic