CURRICULUM VITAE
Name: MUSTHAFA MEERASHA
Post:- Sr.Panel Operator
Contact. No.: -
UAE :+971-*********
India:+919*********
E-mail ID/Skype ID: -
********@*****.***
Personal Data: -
Date of Birth : 01/06/1990
Nationality : Indian
Qualification: B.TECH (Chemical Engineering) & DIPLOMA (Petro chemical engineering)
Languages Known: -
English,Tamil,Hindi
Malayalam.
Marital Status: - Married
TRAINING
Honeywell Experion 450 DCS training
Good level work with Maximo
Elementary First Aid.
Fire preventing and Fire Fighting (FPFF)
Personnel Survival Technique (PST)
Elliot Compressor Operation and Troubleshooting.
Approved Gas Tester by GASCO Safety.
Confined space entry.
Fire and Safety Level 2 by ADNOC Safety
Objective
A Chemical Engineer with 9+ year of OIL &GAS experience seeking to associate with a frontline oil and gas company that offers scope to apply my multi-tasking abilities, for self & organizational advancement
Experience
Around 9+ Years of experience in
OFFSHORE EXPERIENCE
GOOD KNOWLEDE AND EXPERIENCE IN HONEYWELL EXPERION
SHUTDOWN, START-UP ACTIVITIES OF THE PROCESSING PLANT.
SOUR GAS TREATMENT UNIT (GAS SWEETENING PROCESS)
CRUDE STABILLIZATION
GAS DEHYDARATION AND MOLE SIEVE BEDS
NGL RECOVERY PLANT STARTUP AND SHUTDOWN ACTIVITIES
REVERSE OSMOSIS UNIT
EFFLUENT TREATMENT UNIT
WATER INJECTION FACILITY
CRUDE DESALLINATION
EXPERIENCED IN ABB VFD DRIVEN GAS COMPRESSOR, GAS TURBINE DRIVEN ELLIOT GAS COMPRESSORS.
CAREER SUMMARY:
COMPANY
FIELD
LOCATION
YEAR
POSTITION
Abu Dhabi Gas Industries Ltd
(GASCO)
NGL RECOVERY AND GAS COMPRESSION
ASAB,
ABUDHABI
April 2012 to Still date
Panel Operator
PURE ENVIRO
Pvt-Ltd
CPCL-CHENNAI PETROLUEM
CORP LTD
CHENNAI- INDIA
JULY-2012-AUG- 2014
Shift in-charge
GASCO, Abu Dhabi On shore
ACT-Panel Operator, (FEB 2015-till date)
Reporting to: Shift Controller and Shift Supervisor
Unit Assigned- NGL Recovery/Gas Compression by VFD/Gas Turbine Driven
Responsibilities:
Units Handled: NGL Recovery, Gas Dehydration, Separation and NGL Extraction, GE turbine driven Elliot gas compressors startup and shutdown, Propane refrigeration VFD Driven gas compressors startup and shutdown, NGL pumping, Residue gas and NGL transfer lines pigging activities.
450 MMSCFD Associated gas feed capacity and 8000 TON NGL Production Extraction plant
16.5 MW Gas turbine driven gas compressor capacity of 256 MMSCFD HP gas compression
11.5 MW VFD Driven gas compressor capacity of 185 MMSCFD HP gas compression
11.5 MW VFD Driven gas compressor capacity of 185 MMSCFD Diversion gas compression
16.5 MW Gas turbine driven Propane gas compressor capacity of 63.86 MMSCFD
4.5 MW Motor driven IP gas compressor capacity of 32.5 MMSCFD.
11.5 MW VFD Driven gas compressor capacity of 61.6 MMSCFD LP gas compression
11.5 MW x 3 VFD Driven gas compressor capacity of 33.5 MMSCFD Booster gas compression
Demethanizer column operation
Propane Refrigeration Unit
Turbo Expander Operation
Gas dehydration by Molesives
Key Deliverables
Operate, monitor and control the plant through DCS /ICS system safely and efficiently without any product loss and within emission limits.
Operate and monitor Distributed Control System (DCS) for all units.
Manage loop checking, function test for EDP/ESD; DCS graphics punch points and clearing, mechanical run for turbine and compressor.
Operated the DCS (Distributed Control System) for plants startup operations and shutdown in order to meet Company’s objectives and gas production targets.
Checked Loops and DCS Graphics Punch Point as well as undertook corrections.
Make sure that all the capabilities of the integrated control system are fully utilized to improve plant efficiency product quality and safety.
Ensure plant integrity functional tests, changeover routines and other scheduled tasks are completed efficiently and maintain appropriate records and documents.
Control plant upsets and prevents minor emergencies escalating maintaining clear communication and coordination with other departments, GASCO sites and neighboring plants.
Monitor and control production volume supplies, conditions and specifications within the contractual and designated agreements
Ensure that the jobs are carried out as per operating procedures and standards with minimum production loss
Act on changing conditions as required in the day to day running of the plant
Interact with field Operators regarding plant operational parameters during regular operations, troubleshooting, start-ups and shut-downs
Develop and approve operational procedures such as isolation, tagging, PTW, MOC, daily logs, evacuation, flaring…etc
Prepare work plans and procedures as directed by the Senior control room operator and or operations lead
Work with O&M Lead to maintain safe operations and/or ongoing work processes
Report immediately abnormalities to other departments as required
Complete the daily report for review by supervisory personnel ensuring accuracy and detailed reporting of conditions
Assist field operations as required
Register all important parameters, plant conditions and events in plant log book
Ensure isolations are in place before any work begins
Ensure that all HSE standards and procedures (LOTO, PTW,) are implemented in the field and documented correctly in the control room
Ensure that regular daily, weekly, monthly and annually checks are followed up by the Field Operators based on the pre-planned schedules
Understand plant P & ID’s drawings, cause & effect matrix and Fire & Gas detection system
Comply with all GASACO HR, Quality, HSE, and all the Company policies, procedures, processes, work instructions and guidelines
Ensure clear communication between field operator supervisor and other departments.
Ensures full compliance to the HSE requirements and identifies opportunities for improvement in terms of safe working practices.
Enforces that work on site is in line with ADNOC code of practice and ensures strict compliance by staff to the requirements (e.g. Radiography etc.).
Ensure that the HSE critical equipment.
Made F&G presentation which covers all smoke Detectors, UV detectors, H2 sensors, H2S sensors & heat sensors (with range of LEL/HEL), water Deluge system and covers location of fire hydrant and foam monitors? Also plan for isolation of fire water ring.
Daily plant activities plan and assign work to Plant operators for different units.
Carry out pigging operation for three pipe lines which are supplying gas/Oil/water.
Carry out pigging operation for three pipe lines which are supplying gas/Oil/water.
Instruct operators to prepare equipment for maintenance by isolation, draining, pressurizing/depressurizing, N2 purging and water flushing.
GASCO On shore based – NGL Operations
Panel Operator Simulator /Technical Trainer/OJT - NGL Process for Operation staff.
Foundation Modules Classroom training and assessments.
Training and assessment for local and Expertise.
Preparing plans for local trainee development. Preparing Personal development plan and final assessments for 60 working days.
Tracking sheet for overall training progress and online monitoring.
Loop checking, Gas Compressor Solo run, Functional test.
Managing Operators for daily site activities and development.
Received an appreciation Letter from VP for long serving Acting in panel.
Awarded by Casco for Outstanding Performance during Commissioning and start up.
Developed and presented different types of emergency scenarios.
PASSPORT DETAILS:
Passport No : L5976182
Date of Issue : 31-10-2013
Date of Expiry : 30-10-2023
DECLARATION:
I do hereby affirm that the details provided above are true to the best of my knowledge and I shall provide the original proof of the above as and when required.
Place: ABU DHABI MUSTHAFA MEERASHA