Monathan Taylor
Warner Robins, GA. 31093
***********@*****.***
CORE COMPENTENCIES: Painting with high pressure paint guns, Certified forklift/truck lift operator, Material handler, operating a cold saw, worked with laser saws, Assembly line operations, Quality Control and inspection experience, Treatment engineering (wood), Maintenance and cleaning, Stocking and inventory, Shipping and receiving, customer service
PROFESSIONAL EXPERIENCES:
SANBORN TUBE SALES
COLD SAW OPERATOR April 2018-November 2020
Working with a cold saw and sometimes laser saws cutting metal pipes and tubing of all sorts
QUAD-GRAPHICS, SUSSEX, WI.
MATERIAL HANDLER JANUARY 2017-NOVEMBER 2017
Working as a material handler, loading magazines on skids, reading blueprints, troubleshooting robotic arm, cleaning
and maintaining press, assist other material handlers with trouble shooting and machine maintenance.
MARVAIR AIRXCEL, CORDELE, GA.
Painter, January 2016 – November 2016
Clean and paint heating and air conditioning coils, placed air conditioning and heating
coils in pre-packing area for packaging, crossed trained to build heaters and air conditioners, assisted with annual inventory, traveled to other plants when requested to rewire and repair air conditioning and heating units with missing
pieces for packaging.
STELLA JONES CORPORATION, CORDELE, GA.
Treatment Engineer, January 2014 – January 2016
Laborer responsible for stacking railroad ties and placing them in bundles. Operating a 360-truck lift to unload ties from flatbed for packaging and loading ties on the production line as well as stacking wood in the lumber yard to air dry. Trained treatment engineer responsible for turning valves to admit treating solution into retort and steam into heating coils. Operate locomotive, 360 forklifts, or winch to move tram loads of wood products in and out of retort. Quality and control.
LASCO BATHWARE
Gel Coat Operator August 2000, November 2007
Worked in the warehouse packaging bathtubs for shipment, used a high-pressure paint gun to paint the
bathtubs, sprayed pre-lamination over final coat of paint on bathtubs off the assembly line, prepped the
bathtubs by refining and smoothing the fiberglass in preparation to cut the bathtub from the mold, replace 500-pound paint drum and mix new batch of paint for use when paint drums were low.
E D U C A T I O N
Ogeechee Technical College General Education Diploma December 2011
REFERENCES AVAILABLE UPON REQUEST