Post Job Free

Resume

Sign in

Electrical Engineer

Location:
Madurai, Tamil Nadu, India
Posted:
January 02, 2022

Contact this candidate

Resume:

RAMESH SUBRAMANI

Electrical Engineer

Natham, Dindigul,TN, India-624401

E-Mail: adpsl6@r.postjobfree.com,

Mobile no:+919*********

Objective

With 12+ years of experience in the field of Site management, Execution, erections, Testing, and commissioning in EPC, Oil& Gas, Petrochemical, Power Generation T&D substation projects. I am looking forward to utilizing my skills and experience to help the company’s productivity where I can perform professionally excel and achieve professional milestones and rewards. Experience Summary

Total 12+ years(Abroad 5+ years) of Experience in the field of Installation, Maintenance, Testing and commissioning of all Electrical equipment from 480V to 33 KV System& Installation, Testing and commissioning upto 765 KV Power Transformer and 100 MVA Gas Turbine Generator Maintenance Test.

Company Designation Period

QAPCO/Mekdam Holding

Group, QATAR Electrical Engineer

May 2021 - November 2021

6 Months

Carlo Gavazzi Arabia Co Ltd,

SAUDI ARABIA

Electrical Engineer Nov 2016 – Mar 2021

4+ Years

IMP Powers Ltd, INDIA Electrical Engineer Aug 2013 - Oct 2016 3+ Years

Shree Abirami Engg Works,

INDIA Electrical Engineer

Sept 2009 - July 2013

4 Years

Professional Summary:

Responsible for all Installation, Testing and Commissioning activities in Substation, Oil& Gas, Water Desalination, Petro Chemical Projects which includes Power Transformers, Station Service Transformers, Shunt Reactors, Capacitor Banks, Neutral Grounding Resistors, Surge Arrestors, Power Cables, Current and Voltage Transformers, Metal Clad Switchgear, EHV & HV Gas Insulated Switchgear, Control Panel and Protection Panel, Power Demand Meters, Batteries and Battery Charger, AC and DC Distribution Panel, LV AC Auto- transfer Schemes, Design Review and modification etc.

Responsible for the Annual Maintenance, Break down Maintenance & trouble shooting of the same MV switchgear panels and their protections, Transformers, Generators, Control of LT panels and Motor control centers and Motors used for various purposes like Pumps, compressors, cooling fans, valves, conveyors etc.

Installation, Testing & Commissioning of Power Transformer, GIS & Switchyard(upto765KV, 132 KV).

Expertise to clear Technical variances with OEM support. Review scope of work and Technical specifications and Project drawings.

Installation, Testing of Power Transformer’s up to 500 MVA, Auxiliary Transformer’s, MV & LV motors up to 1500kW, Temperature sensors (RTD) located in Motors and Generators, Different types of motor Starters & Stand by Diesel Generator Set.

Involved commissioning activities of MV & LV Motors, MCC panels, MV switchgear Panels, Transformers and HV up to 132kV & 400kV (GIS and AIS).

Follow up the Electrical erection and installation works on-site to ensure correct installation according to the approved Work Method Statements and Issued Construction drawings

Responsible to arrange and attend the design review meetings with Clients and vendors.

Ensure that all construction drawings are updated, according to site modification, changes, etc., regularly.

Submission of As-built cable schedule, scheme drawing & test reports.

Coordinate with Contractor to follow the Standards in Installation & Testing Commissioning Activities, Inspect visually, existing hazardous area installations.

Co-ordinate with the Commissioning and Construction work teams and plan future work programs

Controlling &monitoring of resources, manpower, materials& equipments etc.

Ability to assess all risks before commencing work and have safe work practices.

Coordinate the subcontractor quality engineers and client engineers/third party inspectors to ensure that all inspections, witness and hold points are correctly identified and signed off as required/ Ensure corrective action is taken where necessary

Assisting Construction Superintendent in the coordination of the discipline scope and activity towards Company

Verifying and closing punch items in area of responsibility Projects Summary

AT QAPCO/MEKDAM HOLDING GROUP – QATAR

PROJECT 1:QATAR PETROCHECHIMCAL COMPANY(QAPCO) May 2021- Nov2021 EPCC of QAPCO Power Plant Upgrades works in Turnaround/shutdown 2021 Roles&Responsibilites:

The Existing protection relays cabinet and AVR control cabinet shall be replaced with one new compartment including the Generator and Unit transformer protection relays (G60 & T60), and a manual synchronizing unit for breakers and various generator metering devices.

• Decommissioning and removal of the existing cabinet

• Installation of new cabinet

• Re-termination, testing and commissioning

Installation of new UPS power supply cables and signal cables from GTG to Power plant substation.

Installation of new UPS, battery bank, battery breakers and associated interconnection cables

Laying and routing of new incoming cables from upstream switchboard to new UPS.

Extension of cable tray routing and supports wherever required to facilitate cable laying and termination for new UPS.

Disconnect the existing aluminum power cable 33 KV and termination kits from the power plant Switch Gear GIS side and at the Transformer terminal Box 33kV side.

Pull out and remove the old Aluminum cables and Laying of new cables in same cable trenches / routes with cable trays, hangers, supports, wherever required and providing MS cable markers and backfilling the trenches.

Re-terminate the new cables with new PFISTERER termination to GIS (Gas Insulated SIEMENS 33kV Switch Boards).

Lead electrical activities from construction, O&M side related to the implementation of any modification, including the activities related to the design, development, manufacturing and installation of any new or modified equipment.

To support operation and maintenance teams in troubleshooting issues related to electrical components or systems.

Supporting the management of the major outages of the plant through the provision of a gas turbine long-term service agreement, ensuring that the plant meets Safety, Environmental, availability, reliability, efficiency and budgetary targets. AT Carlo Gavazzi Arabia Co Ltd – SAUDI ARABIA Nov2016- Mar2021 PROJECT 1: INDEPENDENT WATER DESALIANATION PLANT

Shuqaiq 3 IWP Desalination Plant, Al-Shuqaiq, Saudi Arabia PROJECT 2:INTEGRATED SOLAR COMBINED CYCLE POWER PLANT WAAD AL-SHAMAL ISCCPP(1050 MW),TURAIF,SAUDI ARABIA PROJECT 3:HAWIYAH GAS PLANT(HGP),100MVA GAS TURBINE GENERATOR(Maint.), Saudi Arabia

PROJECT 4:WATER DESALIANATION PLANT

SHUAIBAH III EXPANSION II DESALINATION PLANT,SAUDI ARABIA PROJECT 5:REFINERY (SHUTDOWN&MAINTANCE) PROJECT

YASREF EXPORT REFINERY PROJECT, YANBU,SAUDI ARABIA PROJECT 6:GAS POWER PLANT PROJECT

PP13-COMBINED CYCLE POWER PLANT,RIYADH,SAUDI ARABIA PROJECT 7: UMM WU'AL PHOSPHORIC ACID PLANT PROJECT HANWHA SAUDI CONTRACTING CO. LTD,SAUDI ARABIA

PROJECT 8: RABIGH II-IK-EPC FOR COMMON UTILITIES

PETROFAC SAUDI ARABIA CO. LTD,SAUDI ARABIA

Roles&Responsibilites:

Installation, Testing &commissioning of oil filled Power transformers rating 110

/3.1/2.5/1.6 MVA, 132/13.8/0.5 KV.

Installation of all Transformer Accessories including Vacuum, Oil dry out process

Assists of Vendor for Installation& Testing of 132 KV Gas Insulated Switchgear electrical Equipments like CT, VT, CB.

Knowledge of GIS and Cable’s High Voltage& Partial Discharge(P.D) Test.

High Voltage test (Hi-Pot) for MV Cable and MV/LV Switchgear.

13.8/230 KV Generation Transformer Maintenance Testing like Winding Resistance, Dissipation Power Factor(Tan δ and C) Test

Stator- DC Leakage Hipot Test, Winding Resistance Test, Dissipation Power Factor

Rotor -Winding Resistance,Field AC Impedance Test

Installation, Testing and commissioning of all Electrical equipment from 480 volts to 33 KV System

Testing& Commissioning of HV and LV Motors Solo Run Test and Load run Test.

Testing& Commissioning of CT, PT, Circuit breaker(SF6,ACB), MV switchgear panels (13.8 KV ) and Dry Type Transformer.

Testing and commissioning of small Process Panel and motor control centre(MCC), Switchboard,Distribution Panel.

CT loop, VT loop, SYN ckt, ACDB,DCDB,LP etc Scheme check

Testing and Commissioning of Power Products like Current Transformer, Voltage/Potential Transformers, Circuit Breakers, Isolators, Earth Switch’s, Generators, Motors, Power/Distribution Transformers, and MV/LV Switchgear Panels.

Conduct Pre-commissioning activity of MV (13.8Kv/6.9Kv & LV switchgear and LV Motors

(Up to 250 HP) and MV motors (Up to 2000 HP).

Experience about Motor, Electric Heaters Winding résistance test, Insulation resistance test, Polarization index test for MV motor.

Testing of Power Transformer like Stability, SFRA, DFRA, Short Circuit Impedance

Testing of NGR, NGT, Dry Type Transformer, Generator Terminal Enclosure(GTE),Surge Arrester, Disconnecting /Earth Switch

Stability Testing of Bus Bar Differential and Transformer

MCCB, ACB,GCB Timing test by using Breaker Analyzer kit (EGIL), Breaker(MCCB,ACB,VCB) IR and Trip test, Contact resistance test, Torque Test for LV/MV Switch Gear and Panels

Preparation of Inspection test record (ITR) forms for LV/MV Switch gear, LV/MV motor, Panel Boards, Construction and commissioning Method Statements.

High Voltage test (Hi-Pot) for Cable and MV/LV Switchgear, Isolated Phase &Non segregated Bus Duct, Bus Bar.

Trouble shooting of all Electrical circuits, control and protection circuits.

Well awareness of Engineering Drawings and Reviewing of single line diagram, Schematic diagram, Interconnection diagram, general arrangement layout and specification sheets, Cable routing layout, termination Drawings, Cable drum schedule, etc.,

Coordinating with the Vendors in order to complete the Testing & Commissioning of the Electrical Equipment.

Responsible for overall coordination and management of any assigned electrical

(installation, testing and commissioning)projects interface with Planning team, Engineering, Procurement.

Study the contractual scope of site work, applicable specification and standards, application, electrical scheme drawings and interface engineering.

Prepare site test procedure, test formats and as built drawings taking into consideration the manufacturer recommendations and applicable standard.

Plan and schedule testing and commissioning activities.

Identify and arrange test equipment needed to carry out the task. Verify the availability of required documentation (specifications, scheme drawings, etc)

Reporting to Unit Supervisor to update site work progress on daily basis and manage the site team if required

Proceed with the testing and commissioning of the equipment and its interface with other equipment in line with the test procedure and agreement reached with the customer.

Checking of the complete loop by feeding the inputs from the field and also the outputs from the control room through loop checking

Responsible for implementations and monitoring of all Electrical related works at site as per approved drawings and methods and safety rules. AT Imp powers Ltd – INDIA Aug 2013-Oct 2016

PROJCET 1:Installation, Testing & Commissioning of 27 No’s 100 MVA, 230/110 KV Auto Transformers in Tamilnadu Electricity Board, India. PROJCET 2: Installation, Testing & commissioning of 45/31.5/20MVA, 110/66/33 KV Power Transformers in Rewa Ultra Mega solar Ltd, India. PROJCET 3:Installation,Testing & commissioning of 63 MVA, 132/66 KV Power Transformer in Hightension Switchgears Pvt Ltd, Nepal. PROJCET 4:Installation,Testing & commissioning of Power Transformer in Neyveli Lignite Corporation Limited,India

Role & Responsibilities

Placing of the transformer on the plinth and Fixing of Wheels and Carrying out Stop-Block Welding.

Erection of all Transformer Accessories Like HV/LV Bushing and RTCC Panel &Marshaling Box .

Filling of Transformer oil in the Transformer and OLTC under the hot oil circulation, Vacuum drying wherever necessary/applicable to the required level.

Supervise and conduct Transformer Testing like Ratio, Tan delta, Sweep Frequency Response(SFRA) and Dielectric Frequency response Analysis(DFRA)

Supervise and Monitor Installation of Cable, cable tray, Lighting, Distribution control panel, electrical equipment and Grounding system, etc.

AT Shree Abirami Engg. Works – INDIA Sep2009- July 2013 PROJCET 1: Reconditioning, Overhauling and Testing of 6 No's 33 KV and 4 No's 6.6 KV Grade Power Transformers in Mangalore Refinery and Petrochemicals Limited, India PROJCET 2:Reconditioning, Overhauling of 4 No's 33 KV Grade Power Transformers in Tata Steel Ltd, Jamshedpur, India

PROJCET 3:Testing & Commissioning of 6 240 MVA, 765/22 KV Generating Transformer in 2 600 MW LANCO ANPARA THERMAL POWER PROJECT, U.P, India PROJCET 4: Testing & Commissioning of 6 333.3 MVA, 3 63 MVAR, 3 110 MVAR 765/400 KV Interconnecting Transformer, Bus&Line Reactors in 2 600 MW LANCO ANPARA THERMAL POWER PROJECT, U.P, India.

PROJCET 5:Installation,Testing & Commissioning of 63 MVA, 235/11 KV Generating Transformer in Chennai petroleum corporation Limited,India PROJCET 6:Installation,Testing &Commissioning of MV/LV Substation (415V To 33KV System, Power transformer, HT/LT Motors, Switchgear, DC battery, HV/LV Cables, HT/LT Motors, MCC Panel, UPS and Battery charger in Reliance Petroleum Limited, India PROJCET 7: Installation, Testing &Commissioning of Control Panels, LV & MV switchgears, UPS system, batteries and battery chargers, Power transformer, HT/LT Motors, MCC Panel, HT/LT cables in Essar oil and gas exploration production limited, India PROJCET 9:Testing & Commissioning of 188 MVA, 220/66/11 KV Transformer in M/s Hindalco Industries Ltd, Singrauli,U.P,India.

Role & Responsibilities

Lifting of core winding assembly, inspections, and repair/replacement.

Internal surface of the tank and steel surface, which are in contact with insulating oil, if damaged, shall be touched up with heat resistant oil in-soluble varnish or paint.

Re-tanking of core and winding and fixing back top cover with replacement of sealing gaskets and re-sealing of Transformer with new cork sheet gaskets.

Checking and overhauling of tap changer mechanism(OLTC) and replacement of oil.

Mounting and connection of HV&LV bushings. Replacing bushing rubber oil seals with new ones.

De-hydration or Drying-out process of transformer core and winding for removal of moisture by Air circulating Oven with External heaters.

Heating will be continued till steady state temperature is achieved. Once the steady state temperature is achieved, say 70 to 75 degree centigrade, vacuum pulling will be started and the job will be left on vacuum for 24 hours. Vacuum will be breaked by inserting dry nitrogen will be left inside job for 24 hours.

After placing the transformer inside the transformer room, testing carried out.

Study of Single Line Diagrams (SLD), Power and Control Circuit drawings, identification of project requirements for realization of components.

Responsible for preparing Process Flow Charts, Inspection Plans & Activity Charts for the erection, testing and commissioning process.

Responsible for Material indent as per project requirement and handling.

Development & follow up of vendors and vendor supplied components.

Prepare cable schedule for various control circuit and power circuit of Automatic Voltage Regulating system, Cooler Control Circuit, Protection system, Metering System, Auxiliary supplies, Measuring and control instruments and Control valves.

Responsible for testing of Transformers, SFRA,DFRA, Tan Delta & Capacitance Test.

Responsible to supervise all works and man power arrangement.

Responsible for supervise the testing of Power Transformer, CT, PT and prepare test report. Study of transformer protection and closing and tripping logic of OFI, MOLG. Test Kit Familiar

Insulation Resistance Tester- Scope, Eltel,Metrel, Fluke, Megger Sweep Frequency Tester-Doble, Megger Frax101&150

Insulation paper moisture content Analyser- Omicron DIRANA Tan delta and capacitance Kit- Megger, Doble, Eltel &Power Electro technical, Biddle CT Analyser-Omicron, Megger

Transformer Turns Ratio Tester-Scope, Eltel, Megger, Vanguard Transformer winding Resistance Tester-Megger, Eltel,Scope,Raytech Primary Injection Kit-Isa Programma

Circuit Breaker Analyser-EGIL

Multi Function meter-Omicron CPC 100

Micro Ohm Meter-MOM690,DLRO100

FREJA 300 relay Test system

Hi-Pot Test Kit-VLF PTS&ALT SERIES, Phoenix model 475-20,6CP-100/50 Cable Sheath Tester-Megger MFM10

Academic Qualification

2009 Bachelor of Electrical & Electronics Engineering, SACS MAVMM Engg College, Madurai, India Aggregate of 74%. 2005 HSC, Baliah Marthandam.Hr.Sec.School, Thirunelveli,India, Aggregate of 90.25%. 2003 SSLC, Baliah Marthandam.Hr.Sec.School, Thirunelveli, India, Aggregate of 92.60%. Professional Skills

Self confidence

Hard Working Ability

Ability to encourage the surrounding

Capable of co operating with others

Interested to learn new things

Personal Profile

Father's Name : Mr.V.Subramani

Date of Birth & Age : 12-02-1988 & 33

Nationality : Indian

Passport Details : Valid Indian passport & No: T5193317 Place of issue : Jeddah

Date of issue :30/ 06/ 2019

Date of expiry :29/06/2029

Time required to joins : Immediate

Permanent Address : Velampatti,

Natham,

Dindigul-624401,Tamilnadu,india

Languages Known : Tamil, English, Hindi and Kannada Date:

Place: (Ramesh)



Contact this candidate