MURLI MANOHAR GUPTA
Mobile: 081******** ( E-Mail: adpsho@r.postjobfree.com
[pic]
~ VISIONARY TECHNOLOGY PROFESSIONAL ~
Project Management / Erection & Commissioning /Operations & Maintenance
Training to clients,DCS SYSTEM HONNEWELL,YOCOGOVE,AND VARIOUS
CONTROL SYSTEM.
[pic]
Organisational Scan
[pic]
Linde Engineering India Pvt.Ltd vadodara.
DY .Manger INSTRUMENTS.
Projects;-January 2012 at south Africa to December 2013 at sasolburge.For
gas compressor
Commissioning and startup.
SRU Project (HPCL) at Mahul MUMBAI .SRU installation instrumentation
,inspection
Commissioning up to the production.
Top side Facilities for Indian Strategic Reserves Ltd. PADUR KARANITICA .
Control room Erection all panelsinspection commissioning field instruments
inspection
Loop testing, Transmitters,control valve,MOV,Analyser,special level
transmitters in caravan.
Liquid Propulsion Systems centre Mahendragiri (ISRO) Linde Project up to
31st
August.by LINDE erection special mass flow meter Ampovalvest, thrust
turbine
Testing the line pressure 1500 kg/cm2 with most Morden control room working
as in charge inst and Electrical.
At Opal DFCU& AU Dahaj Gujarat. as in charge with commissioning team for
start up
to the production
Jan 31,2017.
Since Jul'08: NaftoGaz India Private Limited, NOIDA (U.P.)
Sr. Manager - Electrical & Instrumentation.
Project: 1.) LSTK CDSP Project at HMEL Refinery, GGSR Project Bathinda,
Punjab.
2.) Successfully Completion & Commissioning of LSTK CDSP
Project at Bharat Oman Refinery
Limited, Bina (M.P.)
From (2006-2008): Hyundai in IRAN AND KOREA (SOUTH)
Manager - Instrumentation & Electrical.
Project: STAS PROJECT TOTAL SOUTH PARS Field Development Phase 2 & 3.
Designing, Selection of Instruments, Cathodic protection of Pipeline,
Equipments & Tank form area. Interface between DCS & Electrical MCC &
Switchgear.
From (2003-2006): ERCOM Enterprises, Kota
Resident Engineer - Maintenance (E & I).
Looking the maintenance of complete site at Kota Thermal Power Station of
capacity 1200 MW.
From (2001-2002): Hyundai in IRAN AND KOREA (SOUTH)
Resident Engineer
Project: STAS PROJECT TOTAL SOUTH PARS Field Development Phase 5 & 6.
Designing, Selection of Instruments, Cathodic protection of Pipeline,
Equipments & Tank form area. Interface between DCS & Electrical MCC &
Switchgear.
From (2000-2000 (DEC)): TOSHNIWAL SENSING DEVIES DEVICES PVT. LTD. (AJMER)
- As Technical Manager.
Lookingafter all Electrical & Instruments for the measuring instrument of
LT/HT Equipment & Instrument process control as per ISO 1400 certification
From (1995-2000): Arabian Oil Co. Alkhafgi Saudi Arabia (Oil &Gas)
As Engineer - Instrumentation.
Cascading of various Distillation Columns, Gas Compressors 6 stage, ESD &
SCADA, Tuning of various plants .commissioning,loop testing inspection
,Hout crude storage Tank form area flooting roof,fantoon testing
beather,valve testing with this crude loading unloading in ship system
.cathodick potation
From (1993-1995): IN DURALA OAGANICS LTD .A DCM SHRIAM GROUP DURALA MEERAT
(UP) - As Manager (E & I).
Erection, Commissioning & production of Peninselin Plant.
From (1991-1992): At Hindustan Zn Smilier Chitoora
As Engineer - Instrumentation
Looking to the running plant of Lead, Zinc Smelter, Cadmium recovery plant,
Sulphuric acid plant.
From (1984-1992): At Sitra Power Station Bahrain (Ministry of works
power & Water 400 MW, 500MW, 4 unit ) (300 MW steam turbine,High pressure
boiler & desalination
Plant .
As Engineer - (E & I).
Looking to the running power plant (1200 MW) & Desalination Plant. High
pressure boilers as well as gas reducing station.
Competencies:
Project Management:
< Supervising project related tasks including planning, control &
troubleshooting for achieving the planned periodic schedules and process
control; preparing operational budgets and ensuring adherence to the
same.
< Monitoring the activity at sites and review of project schedule, ensuring
cost control within budget, planning for
Cash flow requirements, etc.
< Preparing various project reports for identifying areas of obstruction /
defects, conducting troubleshooting, service and repair to rectify the
equipment.
< Accountable for third party inspection of material, tendering, billing,
payment collection as well as liaising work with government authorities
for statutory requirement approval & approval of drawings.
< Coordinating with the other departments for smooth functioning and
accomplishing production as per customers' requirement & organizational
guidelines.
Operations & Maintenance
< Planning and effecting predictive & preventive maintenance schedules for
various equipment to increase machine up time & equipment reliability.
< Implementing maintenance schedules and carrying out periodic checks to
ensure performance of various equipment and maintaining requisite
documents for the same.
< Identifying areas of bottlenecks / breakdowns and taking steps to rectify
the equipment through application of troubleshooting tools like root
cause analysis.
< Maintaining and ensuring stringent adherence to quality standards, norms
& practices, identifying gaps and taking corrective action.
2Installation & Commissioning
< Installation and commissioning of the heavy equipment as well as
conducting tests & inspections to ensure operational effectiveness of
plant & utilities.
< Reviewing engineering drawings, layouts, diagrams, technical
specifications, cost estimates for erection & commission of the plant.
< Involved in installation, vibration performance trials, system layouts
and checks of main and auxiliary machineries and preparing documents for
the same. Control and Instruments all type Instruments,FF system
,Transmitters, all field instruments and DCS System.
Process Enhancements
< Identifying scope for:
. Planning, implementing & monitoring of technological changes to
enhance productivity.
. Modifications in equipment, process flow, working practices, consumables,
power, etc. for controlling & reducing conversion cost per unit produced.
< Implementing various techniques for cycle time reduction, ent ling
identification of opportunities, energy audits, analysis of data,
conduction of tests and implementation & post audits.
< Executing cost saving techniques/ measures and modifications to achieve
substantial reduction in O&M expenditures and work within the budget.
Team Management
< Leading, mentoring & monitoring the performance of the team members to
ensure efficiency in process operations and meeting of individual & group
targets.
< Creating and sustaining a dynamic environment that fosters development
opportunities and motivates high performance amongst team members.
Knowledge Purview
[pic]
INSTRUMENS
For the various job in oil&Gas project field instruments,control Room
panels there installation Commissioning,DCS Panels,F&G,communication,
there power distrubtion,logic testing,loop testing
Guideline to operation persons to operate the plant up to the full
production.
REFINERY,OIL& Gas,and offshore projects.
. Coke Cutting Pumps 2 Nos. Make Flow Serve
< Bridge Crane 33MT Make Kone Cranes
< Lightning and Lighting Scheme
< Statutory Approval of Electrical System
< Manufacturing and Testing of (HT/LT) Insulator
< (HT/LT) Cable Laying
< Cable End Termination and Cable Jointing
< Panel Erection Testing & Commissioning
< Neutral Grounding Cubicle (2000Amp)
< Generator Testing & Commissioning
< Lighting Scheme (External & Internal)
< Temporary & Permanent Cathodic Protection System
< Load Monitoring Scheme
< Cable Tray Fabrication & Erection
< HT/LT Motor Erection Testing & Commissioning
< HT/LT Transformer Erection
< Elevator Erection & Commissioning
< Maintenance & Erection of Over Head Transmission Line
< 910 & 1250 KVA Generator Operation & Maintenance
Scholastics
[pic]
. B.Sc from Rajasthan University.
. Diploma in Instrumentation.
. AVTS Metrology & Engineering Inspection
Other Professional Courses:
. Engineering, Procurement, Construction, Pre-commissioning, Commissioning,
FAT of Oil & Gas Plant.
. Technical Job training at USA WELLINGTON for 60 days.
Personal Dossier
[pic]
Name : M.M GUPTA
Father Name : M.L Gupta.
Gender : Male
Date of Birth : 28 July, 1957
Marital Status : Married.
Language Known : Hindi & English.
Permanent Address : 110, Ambadakar Nagar Kunari, Kota (Raj) India.
2nd feb 2018
PLACE: - KOTA
M.M GUPTA
Strategic Planning
Project Management
Operations & Maintenance
Cost Reduction
Process Enhancements
Erection & Commissioning
Team Management
< Seasoned professional with over 25 years of experience in ELECTRICAL &
INSTRUMENTATION control system, Project Management, Installation &
Commissioning, Operation and Maintenance.
< A keen strategist with expertise in managing entire Electrical &
INSTRUMENT project operations with key focus on top line & bottom line
profitability by ensuring optimal utilization of resources; handling site
operations and accountable for quality service & timely completion of the
projects.
< Adept at carrying out various tests & inspection for maintenance of
ELECTRICAL & INSTRUMENTATION equipment.
< Talent for proactively identifying & resolving problems and ramping up
project activities on time.
< Adept in managing Erection, Commissioning & handing over of project
activities involving resource planning, in-process inspection, team
building and co-ordination with internal / external departments.
< An effective communicator with excellent relationship management skills
and strong analytical, leadership, decision-making, problem solving &
organisational abilities.