LAKSHMANAPERUMAL.R
Manager
Mobile: 807-***-****
Email: adprib@r.postjobfree.com
Career Objective
Seeking a career in the suitable field where I can implement and leverage my knowledge and skills. It is my utmost desire to join an organization of repute that can provide me with challenging career opportunities.
Summary
Possess more than 19 years of experience in the manufacturing field in automotive industry
Setup new line and prepare machine layout, Plan manpower requirement for new line.
Strong experience in the areas of CNC machine programming in Fanuc, Siemens controls.
Trouble shooting of CNC machines with Siemens, Fanuc controls.
Setup and new model trail in cnc machines.
Exposure in TS 16949,maintaing all the document for auditing.
Exposure in EMS.
Experience in SIX SIGMA concept completed project and Green belt.
Experience in concepts like 5S, TPM.
Creating Preventative checklist and schedules and maintaining TS16949 records
Working knowledge in SAP PP module.
Reduce the EEI by introducing low cost automation project.
Team player and independent worker.
Able to develop rapport and earn trust to gain cooperation.
Dedicated to professional development and ongoing training.
Flexible and creative thinker
Can do attitude
Patient and dedicated
Employment History
Aug 2007 – till date
M/S Ashok Leyland, Chennai
Manufacturing department, Engine Machine Shop
Responsibilities
Maintain production process
oMaintain cam shaft and Cylinder block, Cylinder head line to achieve the production target by maintaining the operating parameter.
oMaintaining the machine like cam shaft grinding (Landis), cam milling, Honing, Makino machine creating new program for new models.
oModification and creation of new program for new components
oMaintaining quality records and reduce the internal and external PPM reduction projects
oUpdating production entry, breakdown requestion, tools requestion, IUMTN document, in SAP.
Quality management
oMaintaining component Quality by systematic approach.
oPreparing and maintain the document of TS 16949
oAdopting six sigma methodology to reduce the Quality Gap and process capability improvement
o
Maintenance management
oMachine up time improved by adherence of autonomous maintenance.
oMachine breakdown problem solved by continuous improvement project.
oPrioritize breakdown reduced by MTBF, MTTR analyze.
Abroad visits for Machine trials
oM/S Cinetic Landis, England for a cam profile grinding machine in Dec 2009
May2005 – Aug 2007
M/S Rane TRW, Chennai
Executive Methods engineering
Responsibilities
Project co-ordination Engineering department New model trail prove out
Document preparing for Deming audit.
Control plan and FMEA preparation done for new product.
Doing CNC program in Fanuc control
Improvement project done by small group activities
Production Gap analysis done by PDCA
Implementation of TPM activity to reduce the break down
Preparing PPAP document for new product
Apr 2001 – Apr 2005
M/S Caterpillar India pvt ltd, Hosur
Diploma Technician, Manufacturing
Responsibilities
New model setup and program in MCB and BFW machines.
Develop new tooling and fixtures for new models
Improve the work place safety by identify the unsafe condition and un safe act by HIRA system.
Controlling of tool crib activities.
Tool setting done in pre setter.
May 2000– Apr 2001
M/S Micro tech CNC pvt ltd, Hosur
CNC operator
Responsibilities
Setting and programming in CNC machine.
Reduce the cycle time by program modification.
Adopting TPM technique and improve the machine up time
Reduce the tool consumption by optimum cutting speed
Maintain the work place 5s activities.
Spare parts management
Design and development of in-house LCA
Exposure
Exposure to CNC systems like Siemens 810GA3, 802D,840D, Fanuc OT,OM,
Education
Bachelor of Industrial engineering, Indian institute of industrial engg, Mumbai, India – 2012,
Diploma in Mechanical Engineering, Directorate of Technical Education, Chennai, India -2000
M tech industrial engg in Dr MGR university
Additional Qualification
Certificate course in Six sigma green belt in Ashokleyland.
Training completed in TS 16949, EMS.
Major Achievements
By regrinding the used insert reduce the tool cost
Reduce the ppm from 14500 to 2500 in machining rejection.
Reduce the setup time by line balancing.
Reduce the tool inventory from 1.94 cr to 1.14 cr in tool ware house by reduce the lead time and monitor the regular consumption in daily management.
References
Available on request