Antonio P. Casiño
Mobile : 095*-****-*** Email : adprce@r.postjobfree.com
Profile Summary:
Exposed in the Quality, Safety, Process, Productivity and cost improvement initiatives in a sizeable production
Demonstrated ability to coordinating with other departments in the prompt resolution of key issues pushing for immediate root cause analysis, process simulations, and supporting containment/corrective actions.
Flexible to PPC or Customer altering shipment plans and schedules
Increase production efficiencies through automation approach
Cost Conscious
Team Player
Work Experiences:
Amkor Technology Phils. March 13, 2018 to Dec. 28, 2019
Production Manager (Quality Advocate)
Key responsibilities
Assess operator’s work flow including monitoring checklists and review Quality inspection reports which serves as basis in coordinating with other departments such as Process Engineering (PE), Quality Assurance (QA) and Information Technology (IT) for improvements and automation projects.
Ensures that Working and Safety procedures are followed by everyone within the production floor.
Supports Company Programs for Lean manufacturing through 5S compliance, visual feedback system (Andon), bottleneck analysis, policy deployment.
Ensures that the line is audit ready anytime for QA internal audit; Customer audit, Automotive audit (TS16949); ISO 9000 and Environmental audit (ISO14000) and Gemba walk by P4 management.
Attends daily task force meetings for updates on Quality; new project implementation and fan out of Good manufacturing practices (GMP)
Achievements
Simplified operator’s work procedures thus reducing loss time, increasing Productivity and improving cycle time.
Initiated the significant decreased in operator’s non-conforming occurrences.
Passed various Customer actual Line/Process audits which were conducted usually twice or 3 times a month.
GBPLEN Corporation May 16, 2011 to Dec. 2016 Production manager
Key responsibilities
Responsible in the start-up of its operation for the Optical Camera Lens manufacturing which includes installation and set-up of machines and testing equipment; developing work procedures; hiring, training and constant monitoring of production personnel.
Conducts daily meeting with staff including QA, Production and Materials supervisors; Process and Equipment engineers for all issues that may affect Productivity, Shipment, Quality and Discipline of personnel. Ensures that KPI’s are met.
Since camera lens production was new to the team, I Initiated work process enhancement simulations which improved our cycle time and productivity.
Led the team in passing in its first ISO9000 audit of the company through documentation of all procedures and certifying operator’s in their respective assignments.
Ensures that all personnel understand and practice 5S concept and safety procedures in their working places.
As the highest Filipino officer in the plant, I make sure that a good harmonious working relationship dwells among employees while being focus on the goals of the company.
Brainstorm with Process and Equipment engineers for the best machine parameters for optimum quality and productivity.
Formulates cost reduction initiatives
Achievements
Recognized by the company's top management for obtaining a milestone in its 9th month of operation by surpassing the performance of China branch during their 5 years operation.
Qualified additional and more sensitive products which were never entrusted to Kolen’s Manufacturing branch in China.
The only Filipino who was part of the team in conceptualizing the design and construction of its new manufacturing plant in the Philippines.
Made another milestone by transferring its production operation to its newly constructed building 2years ahead of its original plan.
Extended scope of work by setting-up Cell type production lines, Full auto-assembly lines and the newly transferred technology, “Aespherical Integrated Lens Injection Molding Project”.
Austria Microsystems Phils.
July 15, 2010 – May 5, 2011
TEST Production Supervisor
Key responsibilities
Handled Test process, Tape and Reel as well as packaging of finished products.
Work closely with support teams such as Production Planning; Quality Assurance; Equipment, Process and Test Engineering for all Production related concerns.
Requires all operators to practice 5S in the working areas.
Conducts daily meeting with operators concerning plans, machine set-ups and conversion, quality issues, attendance and discipline.
Defines machine allocations.
Achievement
Contributed to the improvement of TESTER (machine) utilization from an weekly average of 63% to 71%.
PSI Technologies Inc., Calamba, Laguna
Nov. 2003 - July 2005 Production Section Manager
Key responsibilities
Responsible for turning the performance of FOL through daily set-up detailing review, which includes die size and wire size bonding sequence configurations.
Recommends continuous improvement programs, strategies and cost effective measures in further improving EBITDA
Work closely with Production Planning for loading plans, capacity assessments and on-time delivery (OTD) schedules
Ensures that all personnel understands and practices 5S concept and safety procedures in their working places.
Brainstorm with Process and Equipment engineers for the best machine parameters for optimum quality and productivity
Conducts daily meeting with supervisors concerning production KPI’s.
Ensures that the line is audit ready anytime for QA internal audit; Customer audit, Automotive audit (TS16949); ISO 9000 and Environmental audit (ISO14000).
Achievements
Tripled productivity from Nov. 2003 to July 2005 in FOL (Calamba Branch) with the same number of machines thus increasing the company’s monthly revenues.
Improved QA gate PPM from 6000+ to a two (2) digit mark.
Contributed in the reduction of cycle time from 9+ days to 5 days.
Increased man – machine ratio from 1:2 to 1:4+ on both Die Attached and Wire bond processes
Other work experiences:
a.Gateway Electronics Corporation, General Trias Cavite
June 1997 – February 2000
Production Supervisor (Test Production Department)
b.GVC corporation – Chungli City, Taiwan, ROC
April 1995 – April 1997
Production Engineer
c.DAE RYUNG Industries/DKP, Philippines – CEPZ, Rosario, Cavite
May 1990 – Feb. 1995
Supervisor (PCB Assembly Department)
Education: SAINT LOUIS UNIVERSITY
Bachelor of Science in ELECTRONICS and COMMUNICATIONS ENGINEERING
Baguio City 1985 – 1990
Personal Data:
Birth Date : August 25,1968
Sex : Male
Birth Place : San Fernando City, La union
Religion : Roman Catholic
Status : Married
References : Available upon request