Subhash Singh
Senior Land Surveyor
Mob: 0091-916-***-****
Mob: 009**-********
Email: *************@*****.***
Profile
Father Name : Jairam Singh
Date of Birth : 10-11-1974
Nationality : Indian
Religion : Hindu
Passport No : P3115582
Job Objection : Senior Land surveyor
Languages known : English, Arabic, and Hindi
Current Location : Muscat (Oman)
GCC License : Oman Light
Academic Qualification
Diploma in Civil Engineering
Skills
Computer & Languages
Good experience in using Auto CAD 2012, Auto desk Land Desktop
Good experience in using Microsoft programs (Excel & Word)
Good experience in using surveying programs
Equipment Used
Handling Survey Machine level,
Theodolite, diatomite,
Total Station and Gemmated (TC305, TC1101 (Leica), Set 2130, Set 510, Leica Boulder 503, DX 101-AC)
Total Work Experience 21-years
Work Experience in Sultanate of Oman:
(9 Years)
Employer
Al Watanyiah United Engineering & Cont. L.L.C.
December –2013 to till Date.
From – April – 2021 to till date
Project: -Power Upgrading of RAFO THUMRAIT AIR BASE Client : Ministry of Defence Engineering Services
Consultant : Atlas International Engineering Consultants Location : THUMRIAT
From – June – 2019 to November 2020
Project: - 132/33kV Grid station at YANQUL & Regional Office Building at IBRI Project value : 5.77 Million OMR
Client : OETC
Consultant : Energo projeckt
Location : YANQUL & IBRI – OMAN
From – November -2018 to May – 2019
Project : DIAR RAS AL HADD DEVELOPMENT INFRASTRUCTURE Project value : 2.5 Million OMR
Client : QATARI DIAR RAS AL HADD DEVELOPMENT COMPANY Consultant : DAR
Location : Ras al Hadd – Oman
From – 2013 December to November – 2018
Project : Al Amerat Waste Water Project - A2
Project value : 27 million OMR
Client : HAYA
Consultant : NJS Consultant (Oman) L.L.C
Joint Venture : JV-The Arab Contractors & Alwatanyiah Location : Al Amerat-Oman
Scope of Work
1. Main trunk & lateral sewer pipe of HDPE and uPVC with diameters ranging Between 200 mm to 900 m
2. Pre-fabricated manholes of HDPE with shaft diameters of 1.2m, 1.5m & 1.8m 3. House connection (150 mm uPVC)
110 mm conduits for fiber optic cabling
4. Treated Effluent pipelines of HDPE with ranging between 125-300 mm Diameters
Responsibilities
Site Supervision with a Consultant.
Detail Alignment Survey Transfer of Bench Marks by Auto –Level, Total Station & Site Management.
Comprised of Erection of Control Points taking of Traversing Checking of Bench Marks by mean of Traversing and triangulation Setting out, Route survey and Alignment for sewerage pipeline. Pipeline Survey for Final as Built drawing.
Keep good daily written records of work performed written records to Office Projects Department. Reviews construction design to ensure proper quantities, dimensions, and overall completeness. Provides topographic surveys of construction site areas & by the survey data can provide horizontal & vertical profile of the roads including vertical & horizontal curves. Employer
UNITED GULF CONSTRUCTION COMPANY W.L.L.,
14th September-2011 to December 2013
Project : Al Khoudh gravity sewer networks -5A
Project value : 58 million OMR
Client : HAYA
Consultant : Parsons Consultants
Location : Al-Khoudh, Oman
Designation : Senior Land Surveyor
Scope of work
1. Main trunk sewers of uPVC and HDPE with diameters ranging Between 150 mm to 800 m
2. Pre-fabricated manholes of HDPE with internal diameters of 1.2 m, 1.5 m& 1.8 m internal
3. Laterals (150 mm uPVC Rider Sewers)
4. House connections to a connection chamber outside the property Boundary. 5. Connection chambers to laterals by means of a rider sewer 6. De-commissioning of existing septic tanks
7. 110 mm conduits for fiber optic cabling
8. Treated Effluent pipelines of HDPE with 225-700 mm diameters 9. Abandonment of the existing network.
Work Experience in UAE:
(3-Years)
Employer
Bin Hafeez General Contracting co. Dubai (U.A.E)
(Recently named as) Hedley International Emirates Contracting Period
05th May-1999 to 26th August 2011
KEY QUALIFICATIONS
Project Name: Contract No. DS-126 - Pumping the effluent water From Jebel Ali treatment Plant for irrigation purposes. Designation: Land Surveyor
Client : Dubai Municipality
Consultant : Al Turath Engineering
Scope of Works
Irrigation Force Main of 23.5 km pipeline divided into two portions of 4.3 km of 2000 mm GRP pipeline and 19.2 km of 1800 mm of the same type of pipes.
Valve chambers along the line (total 49 in number) of air valve, washout, and shutoff valve chambers
Access shutoff valve chambers for future connections (contained in the above total) of diameters 400, 800, 1000, 1200 and 1800 mm.
Thrust blocks for tees and bends along the pipeline.
Nun Disruptive Method for crossing roads and other utilities along the pipeline (total length of 750 m) using micro tunneling or pipe jacking methods. Responsibilities
Surveying and Setting out works for 24 km By G P S (Trimble).Installing Pipes (2000mm) setting out Chamber and Thrust Block. Extracting surveying data from shop drawings (levels, coordinate, and Dimension to be implemented in the site. Prepare survey sketch for different problems and suggest solution for the Approval of the consultant.
Work Experience in Qatar & Kuwait:
(9Years)
Skills Summary
Having good skills in Land Surveying Topographical Survey Infrastructure Survey Setting out Works Including Buildings Construction & finishing Works. Projects in Qatar and Kuwait
Working as Land Surveyor Since October 2006 to till date For the project of Doha and Rayyan Sewerage PS-32A main far warding In Qatar with Burhan International Contraction Company. Scope of work
Preliminary survey works like existing service and utilities identification Prior to excavation levels and line central during excavation. Axis setting out and provided levels according to approved shop drawings coordinates of Pumping station Buildings and Boundary wall.
Setting out GPS transfer Bench mark setting checking formation level for pipe line excavation according to approved shop drawing for Gravity Pipe Dia 1600 to 1800 GRP lines and 300 to 1000 VCP Pipes with average depth 10mtr and about 1500 meter long also do the construction. Setting out GPS transfer Bench mark setting checking formation level For pipe line excavation and monitoring excavation and levels while progress according to approved shop drawing for Rising Main lines Dia 1200 Twins with average depth 6mtr and 1400 meter long. Also doing the setting out of Chambers Manholes for the construction Provide setting out and levels for Micro Tunnels while in work progress for Gravity and Rising main lines.
June 2000 May 2002
Worked assistant land surveyor from June 2000 to May 2002 for the project of Kabad Road Project in Kuwait with BICC
Scope of work
Setting out of road works according to approved coordinates for leveling for grading and asphalt pavements and fixing curves curbstone works and concrete pavement works from Kabad to Sulaibiya about 42KM.
May 2002 January 2003
Worked assistant land surveyor from May 2003 to January 2003 for the project of S E -11 Pipe line Project with 11 Pumping station in Kuwait with BICC Scope of work
Setting out for the excavation with Total Station and monitoring Excavation Levels according to approved coordinates and levels for 1200mm Ductile pipe lines and 300mm VCP Pumping Station. Giving points according to coordinates and levels in order to lay pipes Work Experience in India:
(2-years)
Worked as an Assistant land surveyor From Jan1997 to May 1999 for the project of Hyderabad water supply and sewerage Board HWSSB Hyderabad in INDIA With Gammon India Limited. Pipeline route survey works with Senior Land surveyor Permanent Address
Rampur Kala Radhaganj
Mirganj Gopalganj Bihar
Mob: 0091-7700812271
Mob: 0091-916-***-****
Mob: 009**-********
Email: *************@*****.***