Curriculum Vitae
ASAD ABBAS RAJA
Email Id: adppxk@r.postjobfree.com
contact no: +92-300-*******
Whatsapp: +92-341*******
SENIOR LAND SURVEYOR
PERSONAL DATA
. Name Asad Abbas Raja
. Father Name Raja Ghulam Hussain
. Date of Birth 21-04-1977
. Nationality Pakistani
. Religion Islam
. Marital Status Married
LANGUAGES KNOWN
. English
. Urdu
. Arabic
. Punjabi
EDUCATION QALIFICATION
. F.A Al Beruni Degree College Pind Dadan Khan, Pakistan
. S.S.C Government High School Khewra, Dist. Jhelum.
PROFESSIONAL QALIFICATION
. One Year Diploma in Surveying Education & Training from PMDC Survey
Institute Khewra, Dist. Jhelum.
COMPUTER SKILLS
. AutoCAD-2015
. MS Office - 2015
. Email, Browsing Internet, etc
SUMMARY EXPERIENCE
More than 19 years & above experience in High rise building, Civil,
Architecture & MEP, Road works, cement plants, storm water, Sewerage,
drainage, underground utilities, LPG Lines, Telecom Lines, and Irrigation
Lines & in Oil Field (CDS-RDS, Wells, Main Oil Line, Oil Production Line,
and Gas Injection Line & Topographic Survey). Currently working in Qatar
with RnR JV Rizzani De Eccher, Metro Rail Project (HIA, Red Line South
Station) as Senior Land Surveyor in Civil, MEP & Architecture Works
construction.
WORK EXPERIENCE [QATAR]
RnR JV Rizzani De Eccher (Italian Co)
Duration : October-2017 - October-2018
Designation : Senior Land Surveyor
Project : RnR HIA, Red Line South Station
Client : Qatar Rail
Responsibilities
. Establishing Control Points Coordinates data with leveling traversing,
. Layout as per design for Civil, Architecture and MEP
. Survey setting out, Grid line, layout of Station, Shelter & Bridge of
HIA Red Line
. Substrate & Finish of Vault, Petal Ceiling and columns, Terrazo
flooring, Wall Cladding, & Ceiling etc of Platform Level & Concourse
Level.
. Takeoff as built coordinate from site and preparation of setting out
data to submit PMC for approval.
WORK EXPERIENCE [IRAQ]
RSK Environment Engineering Consultants (IRAQ)
Duration : Sept - 2014 to Dec -2016
Designation : Land Surveyor
Project : Majnoon Development Oil & Gas field Basra Iraq
Client : (SIPD) Shell Iraq Petroleum Development
Responsibilities
Supervise the contractors works such as
. Conducted Inspection for as a Consultant for all kinds of( Civil works
Road,
. Building,Infrastructure, Transmission line, Setting out oil and gas
well,
. pipe lines all kinds of surveying related works
. Transferring all stored data from the Total Stations to PC which is in
NEZ / ENZ format to plot in Auto Cad to generate raw base drawings.
. Coordination between the Project management and clients and attending
meetings, preparing weekly, monthly progress reports.
. Approved and awarded for safe driving from Shell Iraq Petroleum
Development.
. As built Survey for preparing new design and routes.
. Transferring DMD Levels and Control Points to the Site location.
. As built Survey before costing concrete & after costing concrete as
per approved project construction drawings.
. Conducting inspection for New Gas Plant Civil Construction works.
Road, Building, Oil & Gas pipe lines route and Topographic Survey &
Geo technical Survey. Installation new Bench Mark Survey Points &
Traversing with GPS and Total Station. Double run leveling with
digital level.
. Monitoring all Health, Safety and Environment activities are fully
implemented and properly followed and identify risks expected and
involved during execution and reporting the same to the Safety Manager
for immediate action. And providing tool box talks to the operatives,
related to safety issues while executing the work.
WORK EXPERIENCE [UAE]
CONSOLIDATED CONTRACTORS GROUP SAL OFFSHORE (CCC)
Duration : July - 2011 to Sept-2013
Designation : Civil Surveyor
Project : +100MBD DAS Island Facilities Upgrade Project
1078, UAE
1.8 MBD Qusahwira Field Development (QFD) Project,
UAE
MOL 14" Pipeline from Qushahwira
to Asab Length 80km, UAE
Client : ADCO ABU DHABI COMPANY ONSHORE, ABU DHABI
MARINE ADMA
Responsibilities
Setting out of Pipe line, MOL Line, Oil Production Line, Gas Injection
Line, Setting Out of Pipe Rack, Setting Out of RDS & CDS, Setting Out of
Wells & Topographic Survey, As Built for cutting & filling, Excavation and
Formation
SHIMIZU CORPORATION, JAPAN
Duration : July-2007 to March-2010
Designation : Building Surveyor
Project : Palm Jumeirah Island, Marina Apartment Project,
Dubai
Client : Al Nakheel
Responsibilities
Establishing Control Points Coordinates data with leveling traversing, As
built for cutting and filling, excavation and formation piles cutting as
per design level, Topographic survey setting out, Grid line, layout of PC
FACADE, walls and columns, shifting of survey penetration point with
Plummet instrument.
AL HAMAD CONSTRUCTION COMPANY, DUBAI
Duration : January-2002 to August-2006
Designation : Surveyor
Project : Shore Line Apartment Project, Palm Jumeirah
Island, Dubai
Client : Al Nakheel
Responsibilities
Establishing Control Points Coordinates data with leveling traversing, As
built for cutting and filling, excavation and formation piles cutting as
Per design level, Topographic survey setting out, Grid line, layout of PC
FACADE, walls and columns, shifting of survey penetration point with
Plummet instrument.
WORK EXPERIENCE [PAKISTAN]
SINACO ENGINEERING SERVICES LTD
Duration : January-2019 to December-2019
Designation : Land Surveyor
Project : 18MW Power Plant
Client : ICI Pakistan LTD
Responsibilities
Setting out piles, Grid Lines Setting out and marking, walls & column,
Setting out and marking, layout of footing and column making as built,
Record of concrete construction activities preparing the coordinates,
According to design. Inspections of slabs & setting out & layout
PARAGON CONSTRUCTION COMPANY
Duration : December-2000 to August-2001
Designation : Land Surveyor
Project : Lucky Cement Plant Project
Client : Lucky Cement
Responsibilities
Setting out piles, Grid Lines Setting out and marking, walls & column,
Setting out and marking, layout of footing and column making as built,
Record of concrete construction activities preparing the coordinates,
According to design. Inspections of slabs & setting out & layout.
OIL & GAS DEVELOPMENT CORPORATION LTD (OGDCL)
Duration : Feb-1998 to July-2000
Designation : Seismic Surveyor
Project : ADHI, Kunnar & NIM
Client : Pakistan Petroleum LTD, PPL (OGDCL)
Responsibilities
Traversing & Sun observation line layout observation, 3D survey field work
with LEICA, TC 1610, TC 1600
HUSNAIN CONSTRUCTION COMPANY
Duration : June-1996 to July-1997
Designation : Land Surveyor
Project : Lahore Islamabad Motorway, M2 Project
Client : NHA, National Highway Authority
Responsibilities
All kind of survey works specially layout of flyover bridges and box
Culverts, Road Works
INSTRUMENTS USED
GPS
(Leica Viva GS-10/ GS-12/ GS-14/ GS-15), Leica (CR-333)
GPS Trimble 4700, 5700) GPS Receiver & Trimble II Radio Modems
TOTAL STATION
Leica (TC-1600, TC-1610, TC-1700, TS-06, TS-09,TS-15)
Sokia (510, 610, 630R, 630R)
Topcon (GTS225, GTS-235N)
Geometer (400, 440, 600)
Pentax (R305)
Stonex (503,502)
THEODOLITE
Wild (T0, T1, T2) Compass, hand held GPS
DIGITAL LEVEL
Leica (NA-2002, NA-2003) All kinds of Auto Levels
Programmable Calculator CASIO (602, 603, 880P)[pic]