MEDHAT MOWAFI RESUME

Projects Manager / Project Controls Manager

EDUCATION

B. Sc. in Civil Engineering – 1986

Cairo University, Egypt

Nationality :Egyptian

Current location : KSA –Maddinah

AFFILIATIONS

Member of the Egyptian Engineers Syndicate

COMPUTER SKILLS

EXCELLENT IN PRIMAVERA P6R18, MICROSOFT OFFICE & CAD 2D YEARS OF EXPERIENCE

33

Contacts E: adpovn@r.postjobfree.com M: +966*********

PREVIOUS E X PE RI EN CE

2018 - Present

MIDRAR DEVELOPMENT MANAGEMENT – SAUDI ARABIA

Position: Project Controls Manager

Projects: KEC (KNOWLEDGE ECONOMIC CITY –

MADDINAH MUNARAH –KSA):

Responsibilities:

Preparation of the Master and Detailed Schedules for each department (development, construction, Marketing, Business &Studies and updating of the same on a weekly basis.

Attend weekly meetings with the contractors for ongoing construction projects and review schedule updates, delays, all site hot issues. 2

2013 –2018

ABDULATIF Jameel Land – SAUDI ARABIA

Position: Project Controls Manager–western area Projects: Projects

1- KOMATSU – (MAIN OFFICES – SHOW ROOM - SPARE PARTS WAREHOUSE – WORKSHOP) (50M SR)

2- TOYOTA 3S (SHOW ROOM - SPARE PARTS WAREHOUSE – WORKSHOP) (25M SR) AT HAIL

3- Renovation of TOYOTA 3S (SHOW ROOM - SPARE PARTS WAREHOUSE – WORKSHOP) (15M SR) AT JEDDAH – MADDINAH Rd

4- Renovation of several show rooms for TOYOTA at JEDDAH – MAKKAH – TAIF – MADDINAH WITH TOTAL COST OVER 100M SR

Responsibilities:

Preparation of the Master and Detailed Schedules for each Project and updating of the same on a weekly basis.

The assembly and submission of weekly and monthly reports for the projects.

Review of weekly schedule updates prior to the progress meeting and identifying issues of concern regarding the progress of work including the engineering and procurement and advising the Engineers and the Sites Managers accordingly.

Attend weekly meetings with the contractors and review schedule.

Updates the progress of work and advising the Construction Manager accordingly.

- Take responsibility for the timely publishing of the indicated outcome report for the project with the primary assistance of the Cost Engineer.

- Attend weekly meetings with contractors and review schedule updates. 2007 - 2013

Position: Planning Manager

3

Project: Al Qasr Development, Riyadh

Responsibilities:

Responsible for the set up and functioning of the Project Control System for the residential area.

The assembly and submission of monthly report for the project. Preparation of the Milestone Schedule for the Project and updating of the same on a weekly basis. Review of contractors’ weekly schedule updates prior to the progress meeting and identifying issues of concern regarding the progress of work and advising the Construction Manager accordingly.

Take responsibility for the timely publishing of the indicated outcome report for the project with the primary assistance of the Cost Engineer. Attend weekly meetings with contractors and review schedule updates. 1995 - 2007

Saudi Binladin Group (ABC Division)

Position: Area Manager

Projects & Locations:

Royal Palace at Riyadh Intercontinental hotel at Makkah (Dar Al- Tawhid) Haram shopping center at Medina

Royal palace at Jeddah

Ras Tanura refinery up grade project package # 6 # (ARAMCO contract) Responsibilities:

Follow up shop drawings, submittals & approvals (maintain log)

Follow up material submittals & approvals (maintain log)

Follow up material procurement (maintain log)

Follow up all request for information (RFIs)

Control progress of work in order to achieve the construction time schedule.

Manage the process of request for inspection @ approvals (RFIAs).

Supervise the construction activities.

1993 to 1995

Al-Hanaki Company, Saudi Arabia

Position: Technical Manager & Planning Engineer

Projects: Main & Branch water Line for Central Area - Madinah, K.S.A Responsibilities:

Prepare the time schedule and update it in weekly basis for the construction of main & branch water Lines (diameter 1200,1000,600,400,200 mm)

4

Mange the process of shop & as built drawings

Submitting weekly & monthly reports to the Government using primavera. 1992 to 1993

AMBRIC (American British Consultancy Group)

Position: Site Engineer

Project: waste water treatment plant project, (with total cost $1 billion) - Egypt, Cairo Responsibilities:

Supervise the process of construction work for waste treatment plant 1991 to 1992

Abed Al-LAtif for contracting, Saudi Arabia

Position: Site Engineer

Project concrete stores belongs to Ministry of Defense – Kharj, Riyadh with total cost SR300M

Responsibilities:

Execute the construction stages for Military concrete stores 1989 to 1991

Space Consultant Office, Egypt

Position: Site Engineer

Responsibilities:

Ministry of Interior Housing Projects - Cairo, Egypt Responsibilities:

Supervise the following stage of construction works for Housing Projects

(Turnkey) (with total cost 140 million Egyptian Pound. 1986 to 1989

Lilly Miser (British Contractor)

Position: Site Engineer

Responsibilities:

Project, Main Sewerage Lines (Tunneling works) - Cairo, Egypt Responsibilities: Execute the following stage of construction works for a waste water main Tunnel (5 m diameter with total cost a 4$ billion) & these Construction activities include:

Shaft sinking (for 25m depth) & excavation under compressed air

Tunnel excavation (25 m underground &installing segmental concrete Elements by using slurry shield Machine

Blue bricks lining for internal surface of tunnel

Epoxy pointing for brick covered internal surface of tunnel.

Concrete works covering internal surface of tunnel