ANTHONY SEGUNDO MACAALAY
Email Address: ******************@*****.***
Mobile # 053-*******
Handling System:
Heating Ventilation & Air-
conditioning (HVAC
System)
Fire Fighting System
Fire Alarm System
Plumbing System (Sewage,
Drainage, Domestic Water)
LPG System
FM-200 System
Knowledge in:
Auto CAD 2D
Microsoft Office (Excel,
Words)
Mechanical Estimation
FM-200 Design
BACHELOR OF SCIENCE IN MECHANICAL ENGINEERING
FEATI UNIVERSITY
Manila, Philippines
WORK EXPERIENCE
Company: MM Al Quirashi Company
Position: Senior Mechanical Engineer
Project: Parcel 4.10 (King Abdullah Financial District) High Rise Building (Office and Residential)
Date: April 6,2019 – present
Duties & responsibilities;
Project Site Implementation and Execution.
Prepare all Mechanical Discipline Schedule as per Construction Schedule.
Arrange and prepare for Manpower mobilization, tools and equipment.
Review and estimate the Materials Quantity Take-off compare base B.O.Q and Tender Drawing Plan.
Prepare and arrange all Document Submittal like: (Pre- Qualification Company Profile, Materials Catalogs, Sample Materials and Devices) as stated in the Materials Specification and submit to the Consultant for approval.
Assisting AutoCAD Operator for preparing Shop Drawing for all Mechanical Discipline and submit to the Consultant for Approval.
Coordinate with our Sub-Contractor to prepare and submit the Company Profile for Pre-qualification including their Supplier for the Materials and Equipment.
Logged and monitoring of all Shop Drawing, Materials Inspection Report (MIR), Report for Inspection (RFI), Request for Clarification
(RFC). Materials Delivery Report.
Coordinate and assisting Q.A/Q.C for the Inspection of Materials Delivery on Site for the inspection of the Mechanical Consultant.
Ensure that the installation, inspection and testing commissioning of all the mechanical equipment, fittings and work implemented on Site and meets the specification and the consultant requirements
Responsible to review and check the Subcontractor work execution as per the Contract amount and Billings.
Submit to the Project Manager for review and check and send it to the Operation Manager for signing and issuing a payment.
Ensure the work is executed according to contract specifications, approved design drawings, agreed procedures and method of statement
Monitor materials on Site and prepare materials request order submits to the procurement.
Attend monthly and weekly Technical and Coordination meeting together with the sub-contractor to discuss some other pending works and progress accomplishment work on the Site.
Complete responsibility to decide on day-to-day work that needs to be carried out by subordinates including: scheduling of activities, assigning task to groups or individuals, accuracy of work conducted, supplying resources and dealing with operational issues and problems.
Coordinate with other project personnel to ensure that deadlines, procedures, and other project requirements is met.
Conduct weekly meeting to all my engineers/manpower and discuss about the work and safety measure in the Site also, give them some advice and ideas on how their work to make it prompt and effortless for the project.
Estimate quantity take-off, if any changes in the Tender Drawing prepare Change Order and submit to the Consultant for their Approval.
Prepare daily activity report on Site, submit to the Project Manager for their references, and file.
Prepare Monthly percentage accomplishment Billing of Sub- Contractor as per their actual system installation and submit to my Project Manager for review and approval.
Assisting AutoCAD Operator for preparation of Coordination Drawing for all Mechanical Disciplines
Coordinate to Auto cad operator regarding the as built- plan drawing as per actual all Mechanical Discipline system installation.
Check and verify the accuracy of shop drawings and their compliance to the specification, consultant’s design and existing local authority standard.
Coordinates with MODA Mechanical Consultant and Architect Consultant for any changes in the Tender Drawing and prepare Shop Drawing for their approval.
Prepare and arrange all the necessary submittal documents for Final turnover of the Project and submit to the Consultant for their final approval and acceptance.
Company: Saudi Technical Ltd
Position: Construction Manager (MEP)
Project: Metro Line-2 Station 2B1 & 2A3
Date: December .01, 2018 March 30, 2019
Company: Saudi Development and Construction Company Position: Senior Mechanical Engineer
Project: Jizan 100 Bed Military Hospital
Date: May. 28, 2015 to November 30, 2018
Company: Unisafe Fire Protection Specialists W.L.L Location: Doha, Qatar
Position: Project Mechanical Engineer
Project: Musheireb Downtown Doha
Date: April 12, 2014 – April, 12.2015
Company: Al-Rasheediad Safety & Security Est.
Location: United Arab Emirates, Abu Dhabi
Position: Project Mechanical Engineer
Project: Pepsi Cola Bottling Company
Date: February, 2013 – October, 2014
Company: Al-Rasheediad Safety & Security Est.
Location: United Arab Emirates, Abu Dhabi
Position: Project Mechanical Engineer
Project: Pepsi Cola Bottling Company
Date: February, 2013 – October, 2014
Company: Al-Rasheediad Safety & Security Est.
Location: United Arab Emirates, Abu Dhabi
Position: Project Mechanical Engineer
Project: National Marine Dredging Company
Date: February, 2013 – October, 2014
Company: Al-Rasheediad Safety & Security Est.
Location: United Arab Emirates, Abu Dhabi
Position: Project Mechanical Engineer
Project: Anabeeb Pipe Factory
Date: October 2012- January 2013
Company: Al-Rasheediad Safety & Security Est.
Location: United Arab Emirates, Abu Dhabi
Position: Project Mechanical Engineer
Project: RESIDENTIAL TOWER BUILDING (C-69 & C-77)
Date: March, 2010 – June 2012
Company: Al-Rasheediad Safety & Security Est.
Location: United Arab Emirates, Abu Dhabi
Position: General Mechanical Engineer Maintenance
Project: MINISTRY OF FOREIGN AFFAIRS BUILDING
Date: April, 10.2009 – February 2010
Company: Romago Incorporated
Location: Manila, Philippines
Position: Project Manager (MEP)
Project: GSIS BUILDING
Date: Nov. 2008 - March2009
Company: DVAC Co. (W.L.L)
Location: Doha, Qatar
Position: Mechanical Engineer
Date: June. 2007 – July 2008
Company: AL SHARQ OFFICE CO.
For Trading, Contracting & Maintenance
P.O Box 85760 Riyadh 11672
Location: Kingdom of Saudi Arabia
Position: Mechanical Supervisor
Project: Saudi Telecommunication (STC)
Date: April.2002 to January 2007
Company: ELECTRO-SYSTEM IND. CORP
Location: PASEO de ROXAS
Makati, Philippines
Position: Project Engineer
Project: EQUITABLE BANK BUILDING
Date: 1999 – 2002
System: AUTOMATIC FIRE SPRINKLER SYSTEM (AFSS)
FIRE DETECTION AND ALARM SYSTEM (FDAS)
BUILDING MANAGEMENT SYSTEM (BMS)
TRAFFIC MANAGEMENT SYSTEM (TMS)
CLOSED CURCUIT TELEVISION SYSTEM (CCTV)
PUBLIC ADDRESS SYSTEM (PAB)
(HIGH RISE BUILDING-30thFLOOR and 7th BASEMENT)
Company: PHILSAFETY SYSTEM & EQUIPMENT INC.
Location: ORTIGAS AVENUE
Pasig, Philippines
Position: Project Engineer
Project: ORIENT SQUARE TOWER
Date: 1997 – 1999
System: AUTOMATIC FIRE SPRINKLER SYSTEM (AFSS)
Company: TCGI Engineering.
Location: PASEO de ROXAS
Makati, Philippines
Position: Mechanical Engineer (Inspector)
Project: SALCEDO TOWER
Date: 1995 – 1997
System: AUTOMATIC FIRE SPRINKLER, HVAC SYSTEM,
PLUMBING SYSTEM
Company: GEOSTAR PHILS.
Location: Roxas Boulevard
Pasay City, Philippines
Position: Mechanical Engineer (Maintenance)
Project: Cultural Center of the Philippines
Date: 1993 – 1995
System: AUTOMATIC FIRE SPRINKLER, HVAC SYSTEM,
PLUMBING SYSTEM
EDUCATIONAL ATTAINMENT:
COLLEGE; BACHELOR OF SCIENCE IN MECHANICAL
ENGINEERING
HIGH SCHOOL: LAKAN DULA HIGH SCHOOL
ELEMENTARY: CALOOCAN ELEM. SCHOOL
PERSONNAL DATA:
Nick Name: Thony
Home Address: Lot-1, Blk-81Ph.4 Mabuhay City
Paliparan 3, Dasmarinas Cavite City
Date of Birth: January. 17, 1967
Place of Birth: Manila
Religion; Roman Catholic
Marital Status: Married
Children’s: Patricia Andrea R. Macaalay
Keith Warren R. Macaalay
Princess Sage R. Macaalay
Raffiel Andrei R. Macaalay
In case of Emergency, notify Patricia Andrea R. Macaalay Mobile# +63-965-***-****