MUHAMMAD ATIF SHARIF SHARIF MUHAMMED
Pakistan.
Qatar Contact No. +974-********+97477078411
E-mail: adpm1w@r.postjobfree.com
OBJECTIVE
To hold a responsible position in a reputed firm, this will utilize my skills qualifications and help me attain mastery over the area of assigned work. I have good work and communication skills and I am motivated. I am adaptable to new environment and ready to take responsibilities
Profile
LAND SURVEYOR with 11 Years of Experience in the Civil Construction Field Able to work on own initiative and as part of team. Having analytical, design and problem solving skills. Dedicated to maintain high quality standards CAREER HISTORY – TOTAL 11 Years
TOOLS & INSTRUMENTS USED IN SURVEYING:
Handling computerized surveying instrument works and functions GPS
Leica GS 18 T
Leica Viva GS 14
Total Stations
Total Station (Leica TC 805)
Total Station (Leica TC 403)
Total Station (Leica TC 1102 & 1105)
Automatic Level
Level (Automatic levels sukkia, lieeca and wild instruments) EDUCATION QUALIFICATION
S.S.C Board of Intermediate and Secondary Education, Rawalpindi, Pakistan. TECHANICAL PROFESSION
Diploma Of Surveying From PMDC Survey Institution, Faizan institute of autocad & technical Education Rawalpindi
(Under Sokkia Technical Training Program equipments used: 610K, 630R, 630RK) COMPUTER LITERACY
Downloading, processing and plotting of data using total station software
Processing and plotting of data
AutoCAD & Microsoft office (Word and Excel)
NATURE OF WORKS CARRIEDOUT
Working as a LAND SURVEYOR in Civil Construction Field. I have Experience on Following Different Types of Works
Site surveying, site coordinating and site supervising.
Dealing with consultant surveyor and follow-up of RFI’s.
Checking the shop drawings with respect to construction drawing.
Establishing the given town planning control points to the proposed locations by using GPS/Total Station Equipment.
Setting out of roads, pipe networks such as sewer, water, irrigation and other major networks.
Conducting the preliminary survey in the proposed locations, picking up all existing site details such as ground levels, cross section survey, trees, pipe lines, cable routes and buildings
Making setting out works, establishing the alignment and levels for different layers as per the design drawings.
Marking the proposed locations of future ducts, duct marker, sewerage, storm water networks and gas line etc.
Marking the locations for street light pole foundations, decorative fence, kerb stone, water fountain, manholes, gullies etc.
Major Earth works and Dewatering Projects
Project – Maintence
From 2018 to 2020
Project : Road Maintence (Ashgal)
Empolyer : Boom Construction Company
Position : Land Surveyor
Work : Setting out, Sub Base & Asphal,Street Lighting Kerb Stone, Ducting Clients & Area Worked
Al Hitimi, Ummsalal Road no 102, Alghariya Road, FarmAnimal Shalter Road, Madeena Khaleefa, Al khor, Madeena Al Kamar
From 2017 to 2018
Project : Hamad International Aiport
Empolyer : Boom Construction Company & JV SIX Consturtion Position : Land Surveyor
Work : Setting out, Sub Base & Asphal,CTB
From 2017 to 2017
Project : industrial Area street 53 QTP –CO737 /2
Empolyer : Boom Construction Company & JV SIX Consturtion Position : Land Surveyor
Work : Setting out, Sub Base & Asphal, kerb Stone, Street Light From 2016 to 2017
Project : Hamad international Airport
Empolyer : Boom Construction Company & JV SIX Consturtion Position : Land Surveyor
Work : Setting out, Sub Base & Asphal, CTB
From 2012to 2016
Project : Lusail Experss Highway
Empolyer : Boom Construction Company & Hyundai
Consultone : CDN Smith
Position : Land Surveyor
Work : Setting out, Sub Base & Asphal, kerb Stone, Street Light, Sewage water Pipe line, Oreedo Line,irrigation, Duct, Signel Foundation
FROM JUN- 2011 TO 2012
Project : ERC 1400/D20/C2 Industrial Interchange Doha Employer : Boom Construction Company
Consultant : Technical
Position : Land Surveyor
QR. 40 Million industrial Interchange Doha Expressway project, the work comprises utilities
(Earth Work, Draining, Kerb Stone, street lighting work, water, sewage, pipe crossing and irrigation work etc.
FROM 2010 TO 2011
Project : Al Khor Beach Development Project
Employer : Boom Construction Company
Consultant : Ital
Position : Land Surveyor
Establishing the survey benchmarks from municipality benchmarks to the site setting and levels for the road tops survey, preparing for the road more than 4Mtr cutting and filling as built survey etc.
FROM 2010 TO 2010
Project : Salwa International Highway Phase 1, Doha Qatar. Employer : Boom Construction Company
Consultant : Parsons International Limited
Position : Assistant Surveyor
QR 400 Million Salwa International Highway Project, 17 km international Express way, 4 Lines dual carriageway, 6 location of weight stations and frontage roads, Utilities (Telephone ducts, drainage, intelligent traffic system, street light works, water, Sewage, pipe crossing, irrigation, etc
FROM JAN-08 TO AUG-09
Project : World Bank Pakistan Circular Road Project PD Khan. Employer : Malik Corporation
Client ` : World Bank Pakistan
Position : Asst Surveyor
Responsibilities : All survey work pertaining to site construction PERSONAL DATA
NAME : MUHAMMAD ATIF SHARIF SHARIF MUHAMMED
DOB : 26/10/1984
NATIONALITY : PAKISTANI
PROFESSION : LAND SURVEYOR
RELIGION : MUSLIM
MARITAL STATUS : MARRIED
LANGUAGE : ENGLISH, URDU
VISA STATUS
Residency Permit : Valid Till 06/04/2021
NOC : AVAILBLE
I hereby declare that the details and information furnished here are true and correct to the best of my knowledge and I request your kindness to contact me if you are required any more details
Thanking you for your kind attention
Regards,
Muhammad Atif Sharif Sharif Muhammed