Post Job Free

Resume

Sign in

Land Surveyor International Limited

Location:
Al Dafna, Qatar
Posted:
December 13, 2021

Contact this candidate

Resume:

MUHAMMAD ATIF SHARIF SHARIF MUHAMMED

Pakistan.

Qatar Contact No. +974-********+97477078411

E-mail: adpm1w@r.postjobfree.com

OBJECTIVE

To hold a responsible position in a reputed firm, this will utilize my skills qualifications and help me attain mastery over the area of assigned work. I have good work and communication skills and I am motivated. I am adaptable to new environment and ready to take responsibilities

Profile

LAND SURVEYOR with 11 Years of Experience in the Civil Construction Field Able to work on own initiative and as part of team. Having analytical, design and problem solving skills. Dedicated to maintain high quality standards CAREER HISTORY – TOTAL 11 Years

TOOLS & INSTRUMENTS USED IN SURVEYING:

Handling computerized surveying instrument works and functions GPS

Leica GS 18 T

Leica Viva GS 14

Total Stations

Total Station (Leica TC 805)

Total Station (Leica TC 403)

Total Station (Leica TC 1102 & 1105)

Automatic Level

Level (Automatic levels sukkia, lieeca and wild instruments) EDUCATION QUALIFICATION

S.S.C Board of Intermediate and Secondary Education, Rawalpindi, Pakistan. TECHANICAL PROFESSION

Diploma Of Surveying From PMDC Survey Institution, Faizan institute of autocad & technical Education Rawalpindi

(Under Sokkia Technical Training Program equipments used: 610K, 630R, 630RK) COMPUTER LITERACY

Downloading, processing and plotting of data using total station software

Processing and plotting of data

AutoCAD & Microsoft office (Word and Excel)

NATURE OF WORKS CARRIEDOUT

Working as a LAND SURVEYOR in Civil Construction Field. I have Experience on Following Different Types of Works

Site surveying, site coordinating and site supervising.

Dealing with consultant surveyor and follow-up of RFI’s.

Checking the shop drawings with respect to construction drawing.

Establishing the given town planning control points to the proposed locations by using GPS/Total Station Equipment.

Setting out of roads, pipe networks such as sewer, water, irrigation and other major networks.

Conducting the preliminary survey in the proposed locations, picking up all existing site details such as ground levels, cross section survey, trees, pipe lines, cable routes and buildings

Making setting out works, establishing the alignment and levels for different layers as per the design drawings.

Marking the proposed locations of future ducts, duct marker, sewerage, storm water networks and gas line etc.

Marking the locations for street light pole foundations, decorative fence, kerb stone, water fountain, manholes, gullies etc.

Major Earth works and Dewatering Projects

Project – Maintence

From 2018 to 2020

Project : Road Maintence (Ashgal)

Empolyer : Boom Construction Company

Position : Land Surveyor

Work : Setting out, Sub Base & Asphal,Street Lighting Kerb Stone, Ducting Clients & Area Worked

Al Hitimi, Ummsalal Road no 102, Alghariya Road, FarmAnimal Shalter Road, Madeena Khaleefa, Al khor, Madeena Al Kamar

From 2017 to 2018

Project : Hamad International Aiport

Empolyer : Boom Construction Company & JV SIX Consturtion Position : Land Surveyor

Work : Setting out, Sub Base & Asphal,CTB

From 2017 to 2017

Project : industrial Area street 53 QTP –CO737 /2

Empolyer : Boom Construction Company & JV SIX Consturtion Position : Land Surveyor

Work : Setting out, Sub Base & Asphal, kerb Stone, Street Light From 2016 to 2017

Project : Hamad international Airport

Empolyer : Boom Construction Company & JV SIX Consturtion Position : Land Surveyor

Work : Setting out, Sub Base & Asphal, CTB

From 2012to 2016

Project : Lusail Experss Highway

Empolyer : Boom Construction Company & Hyundai

Consultone : CDN Smith

Position : Land Surveyor

Work : Setting out, Sub Base & Asphal, kerb Stone, Street Light, Sewage water Pipe line, Oreedo Line,irrigation, Duct, Signel Foundation

FROM JUN- 2011 TO 2012

Project : ERC 1400/D20/C2 Industrial Interchange Doha Employer : Boom Construction Company

Consultant : Technical

Position : Land Surveyor

QR. 40 Million industrial Interchange Doha Expressway project, the work comprises utilities

(Earth Work, Draining, Kerb Stone, street lighting work, water, sewage, pipe crossing and irrigation work etc.

FROM 2010 TO 2011

Project : Al Khor Beach Development Project

Employer : Boom Construction Company

Consultant : Ital

Position : Land Surveyor

Establishing the survey benchmarks from municipality benchmarks to the site setting and levels for the road tops survey, preparing for the road more than 4Mtr cutting and filling as built survey etc.

FROM 2010 TO 2010

Project : Salwa International Highway Phase 1, Doha Qatar. Employer : Boom Construction Company

Consultant : Parsons International Limited

Position : Assistant Surveyor

QR 400 Million Salwa International Highway Project, 17 km international Express way, 4 Lines dual carriageway, 6 location of weight stations and frontage roads, Utilities (Telephone ducts, drainage, intelligent traffic system, street light works, water, Sewage, pipe crossing, irrigation, etc

FROM JAN-08 TO AUG-09

Project : World Bank Pakistan Circular Road Project PD Khan. Employer : Malik Corporation

Client ` : World Bank Pakistan

Position : Asst Surveyor

Responsibilities : All survey work pertaining to site construction PERSONAL DATA

NAME : MUHAMMAD ATIF SHARIF SHARIF MUHAMMED

DOB : 26/10/1984

NATIONALITY : PAKISTANI

PROFESSION : LAND SURVEYOR

RELIGION : MUSLIM

MARITAL STATUS : MARRIED

LANGUAGE : ENGLISH, URDU

VISA STATUS

Residency Permit : Valid Till 06/04/2021

NOC : AVAILBLE

I hereby declare that the details and information furnished here are true and correct to the best of my knowledge and I request your kindness to contact me if you are required any more details

Thanking you for your kind attention

Regards,

Muhammad Atif Sharif Sharif Muhammed



Contact this candidate