Objectives:

To be able to handle a position that would require my skills and knowledge in the field of

Instrumentation and Control Engineering

Qualifications:

3 years and 8 months experience in the field of Instrumentation and Control Engineering as a Design Engineer

6 months experience in the field of Calibration of measuring and test equipment

2 years’ experience in the field of QC Electrical Inspector, Design Electrical Engineer and Work Permit Receiver/Safety

Capable of using SPI, SP3D, SPR, Engr. and Design Index, Wiring and Hook Ups

Capable of using Earth Megger Tester, Insulation Megger Tester, Sag Meter, Holiday Tester

Committed, trustworthy and capable to work under pressure.

Perform and organized work efficiently

Possesses good interpersonal, communication and analytical skills.

Proficient in MS Windows/Office Applications and AutoCAD (2D, 3D).

Can read and analyze Process and Instrumentation Diagrams (P&ID) and Loop Diagram

Can understand and interpret Overhead Power line(OHPL) and Cathodic Protection(CP) Scope of Work, Structural List of OHPL, Overhead Power Line Sag and Tension Calculation, Material Take Off, Overhead Power Line Layout, Electrical One Line Diagram and Steel Pole Installation Drawings

Can understand and define Anode Data Bed Schedule, Cathodic Protection Layout and Cathodic Protection Installation Drawings

Educational Background

College Education Batangas State University (2006-2012) BS in Instrumentation and Control Engineering

High School Education Sta. Teresa College (2002-2006)

Elementary Education Sta. Teresa College (1996-2002)

Skills

Use instrumentation terminologies and identify instrument symbols & tag numbers

Bench test, calibrate instrument and Diagnose, troubleshoot and repair defective instruments

WORK EXPERIENCE

Company: JGC Philippines Inc.

Position: Engineer l

Date: August 20, 2019 – Feb 19, 2020

Company Profile:

JGC Philippines, Inc. was established in 1989 as the first global engineering office of JGC Corporation of Japan. From then on, JGC Philippines has become JGC’s largest overseas Engineering, Procurement and Construction (EPC) subsidiary providing EPC and Facility Maintenance services for a wide range of business fields including Petroleum Refining, Petrochemicals, Non-Ferrous Metals Refining and Biofuels in the Philippines. It was granted the first ”AAAA” PCAB License on August 9, 2016. JGC Philippines takes pride in having more than a thousand technically competent Filipino engineers and non-engineering professionals with experience both in international and domestic projects.

Job Description:

My work as an Engineer I:

1st Project Jazan Refinery and Terminal Project. Our activities are mostly focus on Smartplant Instrumentation(SPI) doing some as-built. I’m doing activities like adding notes to instrument especially for FGS instrument based on the information that the Yokohama Operation Center (YOC) will give to us. Updating cable and voltage Indication based on the Instrument Segment Diagram, updating also of the Drawing information (title block), Doing movement of junction boxes, wiring and some overlapping of tags, connection of instrument, generation also of DCS and ESD Instrument Loop Diagram and printing and compiling it. Overall our work revolves in updating, changing and adding additional information that YOC will give to us in SPI.

2nd Project is about KNPC Project. Our activities there is about wiring and cross wiring of FTA card from the system cabinet going to marshalling cabinet. Making terminal strip, assigning how many channel and strip for each connection, changing colors of wires and updating of PSV data sheet only the part of cold set pressure and revision because the last time they made revision is from 2016 and its 2020 now. Only those things are what we are focusing.

3rd Project is Jafurah Project where my main activity is about Instrument Index. Whether it is contractor or vendor side, I have to assign tag number, loop number, P&ID Number, Instrument Type, Service, location whether its Field, MCC or LP, IO Type-AI,AO,DI,DO or FF also the system DCS, ESD or LCP, Line size, Insulation, Line Class/Equip Name, if its with tracing or not, Who is covering the scope if its JGC/Vendor, Package No. and lastly the parallel equipment. Mostly the P&ID are tanks, drums, package, pumps and vendor package.

4th project is about PKI (Pilipinas Kao, Inc) TA3 where I do Instrument detailed loop drawings. My 1st activity is Instrument loop diagram AutoCAD drawings where I change the drawings depending on the Instrument connection wiring list. Some things we need to change are the following: In the client side are IO modules, FCS (fieldbus control system), Cables under them are channels, slot, node, component, terminal no., terminal block no., Panel no. and cores. And in our part are Field, Cable, FTB under them are Tag No., Terminal No., Core, Cable No./Cable Spec, TB no., Terminal No. and some additional mark ups like Instrument type, Model, range, signal protection, maker, service, tag no., notes, and lastly the revision no. where I put some rev cloud in the things that we change as per revision no. My next activity is the Instrument wiring connection list, based on the latest mark ups, same as I do in AutoCAD but this one is in excel sheet form.

Company: Arabian Contracting Development Company

Position: Electrical Inspector/Electrical Design/Work Permit Receiver/Safety

Date: May 05, 2017 – May 05, 2019

Company Profile:

Arabian Contracting Development Co., Ltd. (ACDCo) is a leading contracting and industrial firm. Since 1999, ACD Co. has established a proven track record of prominent turnkey construction projects in both the public and private sectors. ACDCo. Offers its clients a wide range of diversified high-quality services. Its present area of expertise includes the following: Shutdown Work, Structural Steel Works, Water and Sewage Pipeline, Civil, Electrical and Industrial Mechanical Works, Manpower and Equipment Supply, Cathodic Protection.

Job Description:

My work as an Electrical Inspector is about inspecting Material, Installation and Pre-commissioning.

In Material Receiving Contractor Supply I have to inspect materials like power cable, conduits, conduit fittings and accessories, overhead accessories and ground rods. I have to check first materials then prepare QMIS front page, checklist with Material Take Off, Purchase Order, Delivery Note, Invoice, Testing Certificate, Aramco Vendor Certificate and Drawing. Then raise Request for Inspection (RFI) and call my Aramco PID (Project Inspection Department) to check my Materials on the schedule in my Checklist. For Aramco Supply Materials like Disconnect Switch, ACSR, Surge Arrester, Steel Pole, Power Panel, Transformer, Rectifier, Anodes, Junction Boxes and Coke breeze, I have to coordinate with the main contractor to release the materials in Aramco warehouse then prepare QMIS front page, checklist, MTO and Drawing. Then raise RFI and call my Aramco PID that I have schedule for inspection and went to Aramco Warehouse to get the material and attach the Outbound of the material with the checklist and submit to Aramco PID.

For Installation of materials like Steel pole, transformer, rectifier, disconnect switch, post and suspension insulators and others, I’m going to prepare QMIS front page, checklist and the drawings. Then raise RFI and call my Aramco PID that I have schedule for inspection and went to the site so he can check if whether the materials are properly installed in the area.

For Testing like Meggering of the power cable we are using insulation megger, for transformer we are using Insulation Megger also to test the Primary, Secondary and Continuity. Meggering of ground rod using earth megger tester to see if the resistance is less than 25Ω for the steel pole and less than 5Ω for the ground grid as per Aramco Standard, Holiday Testing of positive cables and anodes wires to check if there is voids, holes or damage to the cables, Sagging of ACSR using Sag meter or Dynamometer as per Sag and tension table in the scope of work. Functional Testing of the power panel are done with third party. Same as before I will prepare QMIS front page, checklist and the drawings. Then raise RFI and call my Aramco PID that I have schedule for inspection and went to the site so he can check if the test results passed based on Aramco standards.

For Pre-commissioning of the Rectifier, we are just using swain meter to measure the current in the pipe in the wellhead area. After that we go to rectifier to adjust the coarse taps to test whether if the voltage or current of the rectifier will be at least 70% to avoid damaging the rectifier.

In Electrical Design:

It’s about making as-built drawings for each location that we finished. Our Drawings are from Jacob Zate, Worley Parsons (Al-Khobar, SA), SNC-Lavalin Fayez Engineering. The DGN files that are given to us are being edited in AutoCAD to apply the changes in the site as per our surveyor whether there are additional steel poles, changing the span or distance between steel poles, if there will be other obstruction like FOC (fiber optic cable), pipeline or marl road that are crossing the path of steel poles that we are going to installed in the site. After that we make 4 hard copy of OHPL and CP Scope of work then print, stamp one by one each page, signed each pages also then apply the changes in the drawing, structural list, add the JU number using red ballpen and green ballpen for correction as per Aramco Standard. After that I scan the files with the changes and put in the CD, 4 for OHPL and 4 for CP and submit to the main Contractor NESMA, KENTZ and Al-Barghash.

As a Permit Receiver:

I received the permit from Aramco if we are doing hot work or Cold Work in the site. My role there is to check if our workers are following the proper PPE, working with safety and following the standards based on Aramco. After the work in the site I will return the permit to Aramco.

As a Safety:

I’m the one making the HIP (Hazard Inspection Plan) Package before we start the project in the site. It consists of Scope of Work with applied changes in Structural List and Drawings, Walkthrough, Attendance Sheet, HIP Objectives, Emergency Procedure, JSA (Job Safety Analysis), Method of Statement, Evacuation Procedure, Hazard Identification Field Verification Form, Specific hazard being Identified, Confined Space Entry, Heat Stress Management, Organizational Chart and ERP (Emergency Response Plan).

Company: Fluor Daniel Incorporation Philippines

Position: Designer l

Date: May 18, 2015 – November 4, 2016

Company Profile:

Fluor Corporation is one of the world’s leading publicly traded engineering, procurement, construction, maintenance, and project management companies. Fluor Daniel Inc. Philippines has been in operation since 1987. The office’s first project was engineering for a Client in China. Fluor Philippines now offers full-service EPC services to Clients locally and around the world.

Job Description:

My work as Designer l: Engineering Index and Design Index, Using the SPI, I’m the one makes or create the Loop, Tag Numbers for every instrument in the Plant in the Sasol Project. Providing the service description for every instrument, changing the IO type if it is AI, AO, DI, DO. Based on the P&ID, I change also the IO system if it is DCS, SIS or FGS. Line numbers are updated too depending on the piping. Using SPR & SP3D, I search every instrument in the plant for its CWP (Construction Work Package) to be accurate. Checking also the Model, Manufacturer and PO for every instrument is for Engineering Index. For Design Index, I’m the one assigning the electrical detail, process detail, mounting, support, and IAS detail of each instrument based on the reference documents. I also used SPR and SP3D in this part for the mounting and support for instrument that are remote mount or using stanchion or outside of the platform and many more. I also do wiring and Material man using SPI.

Company: Mitsubishi Hitachi Power System (MHPS)

Position: Design Engineer l (I&C Design Boiler Section)

Date: August 1, 2013 – April 24, 2015

Company Profile:

MHPS (Philippines) Inc. formerly Babcock-Hitachi (Philippines) Inc. (BHPI) is the acknowledged leader in design and manufacturing of Power Boilers, Industrial Boilers, and Heat Recovery Steam Generators (HRSG) in the Philippines. MHPS-PHL is also the pioneer in offering boiler risk diagnosis services, such as Risk-Based Maintenance (RBM) in the Philippines which stems from Babcock-Hitachi’s vision of offering clients a comprehensive service from boiler design until boiler maintenance.

Job Description:

My work is focused on autocad 2D. Updating, detailing and editing DCS commands in the Boiler. Electrical power loads depending on the request of our Japanese client. We also do help piping in their ISO drawing depending on our loads.

Company: First Sumiden Circuits Inc. (FSCI)

Position: Calibration Technician (QA/QC Section)

Date: September 20, 2012 – March 3, 2013

Company Profile:

First Sumiden Circuits, Inc. (FSCI) is the pioneer manufacturer of high quality flexible printed circuits (FPC). FPCs are thin and light weight wiring components with electronic circuits printed on flexible film. FPCs are used to reduce the size and weight of electronic components, reduce wiring costs, and improve wiring reliability, among others. These are applied on hard disk drives, optical disk drives, mobile phones, pagers, cameras, car stereos and other items.

Job Description:

I calibrate instrument like pressure gauges, micrometer, calliper, weighing scale, ph meter, temperature controller, steel ruler, transmitter and timer. I also do calibration sheet for future reference on the result.

TRAININGS ATTENDED

Control System Designer’s Training

Fluor Daniel Inc. – Philippines

Asian Star Building Fil Invest Corporate City, Corporate Avenue, Muntinlupa

September 14, 2015 – October 19, 2015

Wireless Hart Solutions

Fluor Daniel Inc. – Philippines

Asian Star Building Fil Invest Corporate City, Corporate Avenue, Muntinlupa

June 17, 2015

Smartplant Instrumentation User

Fluor Daniel Inc. – Philippines

Asian Star Building Fil Invest Corporate City, Corporate Avenue, Muntinlupa

June 03, 2015 – June 9, 2015

Korean Language & Culture

TESDA RTC CALABARZON

P. Hererra St., Batangas City

June 17, 2013 – July 22, 2013

Effective Calibration Management

Neville Clark, Pasig City

Nov 16, 2012

Instrumentation and Control Servicing NC II

TESDA RTC CALABARZON

P. Hererra St., Batangas City

June 26, 2012 – August 6, 2012

CAD Leading to Technical Drafting NC II

Advanced Business Consultancy Centre, Phils. Inc.

ABCC Bldg. 127 M.H. Del Pilar St., Batangas City

April 18, 2012 – June 1, 2012; Certificate: June 9, 2012

ON-THE-JOB TRAINING

Babcock Hitachi Phils. Inc. San Roque, Bauan, Batangas

July 4, 2011 – October 14, 2011

SEMINARS ATTENDED

Process Control and Automation Fundamentals

I &E Instrumentation Training Center, Libjo, Batangas City

July 31 & August 03, 2009

Wireless Instrumentation in the Process Industry - Trigon Management

Batangas State University, Batangas City

August 5, 2011

CHARACTER REFERENCES

Arnel Del Rosario

Associate Design Engineer-Fluor Daniel Phil. Inc.

Polaris Corporate Center, Alabang, Muntinlupa, 1781 Metro Manila

(091********)

Mart Vallagomesa

Principal Designer- Fluor Daniel Phil. Inc.

Polaris Corporate Center, Alabang, Muntinlupa, 1781 Metro Manila

(091********)

Mark Kenneth Martinez

Electrical Engineer-Rockwell Powerplant Mall

Makati, Metro Manila (092********)

I hereby certify the above information is true and correct to best of my knowledge and belief.

Marc Joseph D. Panganiban

Applicant