PERSONAL PARTICULARS
THE RESUME OF G.SANKARA NARAYANAN
PROJECT MANEGER
NAME : G. SANKARANARAYANAN
DATE OF BIRTH : 17 July 1971
MARITAL STATUS : Married
Nationality : Indian
EDUCATION AND
QUALIFICATION : *B Tech (CIVIL)
*Diploma in Civil Engineering.
*Post Diploma in Town and country planning.
LANGUAGE
(Written & Spoken) : English, Tamil.
DRIVING LICENSE : LMV and Two wheeler
ADDRESSES : No.7 Kalyani emaraled,
2nd cross street, PSV Avenue,
Mec Nagar,Kattupakkam,
Chennai -56.
Mobil:979******* & 994-***-****
email: adpl51@r.postjobfree.com.
Date Available : Immediate
TECHNICAL BACKGROUNDS
1989 - DIPLOMA IN CIVIL ENGINEERING
(FROM STATE BOARD OF TECHNICAL EDUCATION AND TRAINING.MADRAS.25, INDIA)
1993 - POST DIPLOMA IN TOWN AND COUNTRY PLANNING.
(FROM STATE BOARD OF TECHNICAL EDUCATION AND TRAINING.MADRAS.25, INDIA)
2015 - B Tech(Civil)
(FROM KARNATAKA STATE OPEN UNIVERSITY,
MYSURU. 570 006, INDIA)
BUILDING CONSTRUCTION AUTHORITY IN SINGAPORE
2007 - REGISTER AS RESIDENT TECHNICAL OFFICER
2011 - SPECIALIST DIPLOMA IN WORKPLACE SAFETY AND HEALTH
CERTIFICATE COURESES IN SINGAPORE
1999 - BUILDING CONSTRUCTION SAFETY SUPERVISOR
1999 - LIFTING SUPERVISOR SAFETY
2000 - FORMWORK SAFETY SUPERVISOR
2001 - PC OFFICE 2000 PACKAGE
2003 - SAFETY CO-ORDINATORS TRAINING
2006 - METAL SCAFFOLD ERECTION
2006 - EMPLOYABILITY SKILL INWORK PLACE SAFETY AND HEALTH – OPERATIONS LEVEL
2006 - SUPERVISION OF METAL SCAFFOLD ERECTION
2007 - SAFETY INSTRUCTION COURSE FOR MANHOLE SUPERVISION
2008 - WORKPLACE SAFETY & HEALTH –OPERATIONS LEVEL
2008 - INTERNAL QUALITY AUDIT QHS 18001
SUMMARY OF EDUCATION:
Major in Structural works
Architectural and fine- furnishing
Work place safety and Health
Heavy machinery operations
SUMMARY OF EXPERIENCE
Has been practicing supervision of projects professionally with 30 extensive year experience with projects standard of requirements.
Versatility of knowledge’s encompassed from Civil structural, Architectural fine finishing to outdoor landscaping.
Has been working and associated with established consultants and contractors.
Has proven and successfully completed several reputable projects.
Experience in high rise-rise building projects, Offices, VIP residence, Churches, School buildings Industrial Building Car show room.
Proficiency in English with skill enhances to liaise and communicate at all levels.
Observed Occupational health and safety policy implementation and safety programmed.
Purchasing of Construction Materials.
WORKING AS RESIDENT TECHNICAL OFFICER EXPERIANCES
1.Ministry of Education projects
a.SINGAPORE POLYTECHNIC 6TH STOREY SCHOOL OF CHEMICAL & LIFE SCIENCE TEACHING BLOCK WITH ANNEX BUILDING
BASIS - Part time employment.
b. PROPOSED ERRIECTION OF 2 STOREY CLASS ROOMS BUILDING AT TELOK BLANGHA PERIMAREY SCHOOL.
BASIS - Part time employment
2.Housing development projects
a.From1 June 2013 to 03 July 2013
ADDITION AND ALTERNATION WORKS TO MULTI STOREY CAR PARKS (BATCH 7) at BETOK NORTH ROAD (14 Locations)
BASIS - Full time employment
b.From21 April 2014 to 15 June 2014
PROVISION OF NEW MULTISTOREY CAR PARK (MSCP) & TEMPORARY SURFACE CAR PARK IN CAR PARK T7 AT TAMPINES STREET 11 AND PROVISION OF NEW TEMPORARY SURFACE CAR PARK AT TAMPINES AVENUE 5
BASIS - Full time employment
3.FROM Tham & Wong PLL(Consultant)
a. From03 July 2013 to 20 November 2013
PROPOSED ADDITIONS & ALTERATIONS INVOLVING DATA
PROCESSING USE ON 4TH STOREY (PHASE 2) OF EXISTING
6-STOREY WARE HOUSE DEVELOPMENT ON LOT 04153C ON MK 06 AT 15 PIONEER WALK (PIONEER PLANNING AREA)
BASIS - Full time employment
b. From 15 March 2015 to 15 June 2015
PROPOSED ADDITIONS & ALTERATIONS INVOLVING DATA
PROCESSING USE ON 5TH STOREY (PHASE 7) OF EXISTING
6-STOREY WARE HOUSE DEVELOPMENT ON LOT 04153C ON MK 06 AT 15 PIONEER WALK (PIONEER PLANNING AREA)
BASIS - Full time employment
c.From 16 June 2015 to 31st July 2015
PROPOSED FAÇADE RECLADDING WORKS FOR CENTENNIAL TOWER SINGAPORE OF
2 BASEMENT CARKPARK & 34-STOREY OFFICE TOWER ON URA LAND PARCEL 117 & 118 ON LOT 5441t OF TS 11 AT 3 TEMASEK AVE/RAFFLES BOULEVARD (DOWNTOWN CORE PLANNING, MARINA CENTREAREA)
BASIS - Full time employment
4.WRX Engineers PTE LTD (Consultant)
From 01 July 2014 to 15 February 2015
PROPOSED AMENDMENT TO APPROVED 110 BEDS 3 STOREY EXTENSION OF NURSING HOME AND PROPOSED ADDITION & ALTERATION TO EXISTING 137 BEDS 3 STOREY NURSING HOME ON LOT 99717C, MK 10 AT 72, ELIZABETH DRIVE
BASIS - Full time employment
5.Singapore Aviation Authority (Consultant)
(Changi International Airport Singapore)
From 01 October 2015 to 29 February 2016
Proposed resurfacing to existing Run ways 1 and 2 at Singapore International Airport
BASIS - Full time employment
6.Proposed warehoused warehouse with multi story heavy vehicle parking with ramp at Pioneer view
From 11 January 2017 to 29 February 2018
BASIS - Full time employment
DETAILS OF PROFESSIONAL EXPERIENCES:
Oct 1996 to Sep 2000 SITE SUPERVISOR CUM SAFETY SUPERVISOR FOR ERECTION OF NEW DEWLING UNITS
HIGHRISE RESIDENTIALBUILDING AT HDB PROJECTS
LIAN BENG (1988) CONSTRACTION PTE LTD
PROJECTS:
a.N5C9 Bukit Panjang, Jalpang road HDB high rise residential units.
i)5 Blocks and 1carpark, 17 story and 23 story. carpark is 5 story.
ii)For link ways use RC piles and Metal roofing sheets.
b.N1C11 Bukit Panjang, Lompang road 25 story high rise residential units
i)3 Blocks and 3 Story Car park with link ways
C. RC13 Depot road 25 story high rise residential
i) 6 Blocks 20 and 25 story high rise residential and car park is 7 Story
D) RC46 Telok blangh height 3 blocks and car park
i) 3 Blocks are 30 story high rise residential and 5 story car park
Duties & Responsibilities:
Supervise the structural works and architectural works.
Conducting Weekly Site Audit with main contractor and following for their rectification works
Arrangement of Monthly & Weekly Program, Reporting of Monthly Progress, Highlight to discrepancy between Structural and Architectural works
Monitoring the project schedule and highlight any critical activity needs particular attention
Supervising and Checking of micro piling, pile caps, beams, reconstruction beam and lift shaft casting.
Monitoring the ULT, SLT and PDA tests.
Attend the meeting and discuss with consultant for discrepancy on site and drawings.
Checking the rebar, steel work and concrete work.
Supervision and checking the reconstruction beam, up-stand beam, parapet wall and concealed drain.
Supervision the install mechanical bolts, tie back, steel beam, hold down bolts and base plate.
Checking for apron drain, entrance porch and reinstatement work.
Execute modifications as per working drawing & job order.
Handing over of completed works to HDB & the respective Town Councils.
BASIS - Full time employment
APR 2001 to Jun 2002 SITE CO-ORDINATOR CUM SAFETY SUPERVISOR
LEADS ENGIEERING PTE LTD
PROJECTS:
a.CIVIL ENGINEERING WORKS AT SEMB.CORPORATION COGEN PLANT IN PULAUSAKARA
b.EXXON MOBIL TANK PROJECT AT PULAU PESEK
C. HDB DEMOLITION PROJECTS AT REDHILL CLOSE
BASIS - Full time employment
Oct 2002 – Nov 2011 SITE SUPERVISOR CUM SAFETY CO-ORDINATOR.
INCORPORATED BUILDERS PTE LTD
PROJECTS:
a.PROPOSED ERRIECTION OF NEW BUILDING TO BAPTIS CHURCH WITH ATTIC AT THOMSON ROAD.
b.PROPOSED ERRIECTION OF NEW BUILDING TO SHOLOM CHURCH AT LOYANG BEASAR CLOSE.
c.ADDIONL AND ALTERATION OF LEACTUR THETRES (LT) 9, 16 & 17 AT NATIONAL UNIVERSITY OF SINGAPORE.
d.PROPOSED ERRIECTION OF 2 STOREY FACTORY BUILDING AT CHIN BEE AVENUE.
e.PROPOSED ERRECTION NEW BUILDING AND CAR SHOW ROOM OF HONDA KAH MOTORS AT LENG KEE ROAD.
f.PROPOSED ERRECTION NEW 7 HOUSES AT WILKINSON ROAD.
g.PROPOSED ERRECTION SINGLE OWNER OF 5 STOREY FACTORY BUILDING AT SERANGOON NORTH AVENUE 5.
h.DISMENTALING OF ONE STOREY BUILDING AND PROPOSED ERECTION OF 5 STOREY FACTORY BUILDING TO GE AVIATION @ LOYANGWAY.
i.SINGAPORE POLYTECHNIC 6TH STOOREY SCHOOL OF CHEMICAL & LIFE SCIENCE TEACHING BLOCK WITH ANNEX BUILDING.
j.A&A TO EXISTNG H0TEL FORT CANNING PARK @ FORTCANNING WALK.
k.PROPOSED ERRIECTION OF 2 STOREY CLASS ROOMS BUILDING AT RADINMAS PERIMAREY SCHOOL.
Duties & Responsibilities:
Supervise the structural works and architectural work.
Conducting Weekly Site Audit with main contractor and following for their rectification works
Preparation of Inspection for RE, RTO, with Paper Works
Monitoring & carried out regular sites safety/housekeeping audits & inspections.
Arrangement of Monthly & Weekly Program, Reporting of Monthly Progress, Highlight to disturb between Structural and Architectural works
Monitoring the project schedule and highlight any critical activity needs particular attention
Monitoring the Point load test, MPI and PDA tests.
Attend the meeting and discuss with consultant for discrepancy on site and drawings.
Checking the rebar, steel work and concrete work.
Supervision and checking the construction of Culverts, house drain and concealed drain.
Supervising and Checking the install cladding and bondek slab.
Supervision the install mechanical bolts, tie back, steel beam, hold down bolts and base plate.
Monitoring the lift installation, and lift turn on.
Monitoring of material testing and results according to specifications.
Checking for apron drain, entrance porch and reinstatement work.
Acts as a specialists’ consultants to the project management team
Assisting Project Manager in all feedbacks & the preparation/ submitting progress & others related reports.
Submitting of material samples and purchase materials
Knowledge of different types of floorings
Involving of ISO submissions and Audits
Involving of Conques implementation works
Handing over of completed works projects in time
BASIS - Full time employment
From June 1989 to September 1996
In India worked as Technical Assistant at Town Panchayat Union, Regulated Marketing Commute in various projects
BASIS - Full time employment