CURRICULLUM VITAE

Of

BRENDON KEVIN RANDALL

PERSONAL DETAILS

Name: Brendon Kevin Randall

Date of Birth: 05 February 1974

Id. num: 740**********

Nationality: South African

Gender: Male

Marital Status: Married

Dependants: 3

Address: 3B Matopi Eco Village

Onverwacht

Lephalale

0557

Contact Details: +278******** or +276********

Email: brendon.fab@gmail.

EDUCATION

Institution: Richtek College

Qualifications: Electrical Engineering N1

Subjects: Electrical Trade Theory N1

Engineering Drawing N1

Engineering Science N1

Mathematics N1

Examination Num: 105625

Centre Num: N0360

Institution: South African Institute Of Welding

Qualifications: SAIW Welding & Fabrication Level 1

Diploma Num: 10197

Institution: Quality Council for Trades & Occupations

Trade: Qualified Welder

Qcto Num: 12/138195

EMPLOYMENT HISTORY

Company: Domento – Northam Furnace 01 Upgrade

Position Held: QC/QA Inspector-Nightshift

Duration: 15 May 2021 – 20 October 2021

Work Responsibilities

•Inspection of fabricated items-before, during and after welding

•Checking for material identification according to manufacturing drawing

•Check fit-up and fabrication before welding

•Completion of welded components and all necessary documents for final release to client

•Requesting for NDT activities

•Review of all NDT reports

•Understanding and implementing of the codes, standards, and specifications

•Understanding of WPS’s, PQR’s & QCP’s (AWS D1.1 and ASME 9)

•Witnessing of bolt flogging

•Witnessing of bolt torquing

•Calibration of torque wrenches

•Pre-assembly inspection of components

•Post assembly inspections of components

•Punch out of lines, completion inspections

•Raising and closing NCR’s

Company: SNC Lavalin - Medupi PowerStation

Position Held: QC Inspector-Nightshift

Duration: 14 Feb 2020-08 May 2021

Work Responsibilities

•Inspection of fabricated items-before, during and after welding

•Checking for material identification according to manufacturing drawing

•Check fit-up and fabrication before welding

•Completion of welded components and all necessary documents for final release to client

•Requesting for NDT activities

•Review of all NDT reports

•Understanding and implementing of the codes, standards, and specifications

•Understanding of WPS’s, PQR’s & QCP’s (ASME9)

•Witnessing of bolt flogging

•Witnessing of bolt torquing

•Calibration of torque wrenches

•Pre-assembly inspection of components

•Post assembly inspections of components

•Punch out of lines, completion inspections

•Raising and closing NCR’s

Company: MEI Construction & Services- Kusile PowerStation Shutdown-Unit 2

Position Held: Welding Foreman-Nightshift

Duration: 11 November 2019-19 December 2019

Work Responsibilities

•Witness of Welder Qualification Test on SMAW

•Requesting of work permits

•Oversee and coordinate efforts of 7 welders on nightshift

•Ensure quality standards must be according to client standard & specification

•Ensure welding crew follow site health & safety regulations

Company: Stanley Inspections-Matimba PowerStation Shutdown Unit 5

Position Held: QC Inspector-Nightshift

Duration: 10 October 2019-6 November 2019

Work Responsibilities

•Visual inspections

•Wall thickness reports

Company: GPU MECHANICAL SERVICES-DISTELL WADEVILLE

Position Held: Double Coded Welder

Duration: 13 July 2019-26 September 2019

Work Responsibilities:

•Welding on stainless steel dairy tube piping-GTAW

•Welding on stainless structural steel-GTAW

•Welding on carbon piping for ammonia lines-GTAW & SMAW

Company: SNC Lavalin-GI-Outage Medupi PowerStation

Position Held: QA/QC Welding Inspector-Nightshift

Duration: 18 October 2017-05 July 2019

Work Responsibilities:

•Inspection of fabricated items-before, during and after welding

•Checking for material identification according to manufacturing drawing

•Check fit-up and fabrication before welding

•Completion of welded components and all necessary documents for final release to client

•Requesting for NDT activities

•Review of all NDT reports

•Understanding and implementing of the codes, standards, and specifications

•Understanding of WPS’s, PQR’s & QCP’s

•Witnessing of bolt flogging

•Witnessing of bolt torquing

•Calibration of torque wrenches

•Pre-assembly inspection of components

•Post assembly inspections of components

•Punch out of lines, completion inspections

•Raising and closing NCR’s

SHUTDOWN EXPERIENCE-GI-OUTAGE

•Modifications of GAH-Pinracks Unit 6

•Removal of burner fin plates on boiler tubes Unit 6-Unit 1

•Inspection before,during & after of installation of superheaters support tubes

•Witness etching on existing superheater tubes

•Installation of patchworks on PJFF

•Installation of patchwork on GAH

•Installation of complete GAH on UNIT 1-Project

•Installation of erosion protection cover plates on superheater tube inner bends-Unit 5

Company : Kentz (Medupi-Powerstation)

Agent : Isizwe Placements

Position Held: Qa/QC Welding Inspector

Duration: 1 Dec 2014 –28 Aug 2017

Work Responsibilities:

• Inspection of fabricated items-before, during and after welding

• Checking for material identification according to manufacturing drawings

•Check fit-up and fabrication before welding

•Completion of welded components and all necessary documents for final release to clients

• Requesting for NDT activities

• Review of all NDT reports

• Understanding and implementing of the codes, standards, and specifications

• Understanding of WPS’s, PQR’s & QCP’s

• Witnessing of bolt flogging

• Witnessing of bolt torquing

• Calibration of torque wrenches

• Pre-assembly inspection of components

• Post assembly inspections of components

• Punch out of lines, completion inspections

• Raising and closing of NCR’S

Company: Kentz (Medupi-PowerStation) GEA-Heat Exchangers

Agent: Isizwe Placements

Position held: Welding Supervisor

Duration: 13 March 2012 – 30 November 2014

Work Responsibilities:

•Ensure that the workforce comply to all safety standards and site procedures Ensure welders comply to the welding standard, procedures, wps’s and usage of correct consumables for specific materials and welding processes.

•Do fit-up inspections, root inspections, weld completion inspections, equipment inspections, certification inspections.

•To ensure welders and foreman’s daily productions meet management completion dates.

•Test welders, coach welders in weld techniques and RT failures (advice of poor weld techniques and RT failures) -problem solving.

•Working with 40 persons under my supervision including welding assistants, welders and foremen.

•Requesting of NDT’s and reviewing of NDT’s

Company: Kentz (Sasol1,Wax Plant Project)

Agent : Amt Placements

Position Held: Welding Foreman

Duration: 7 July 2011 – 8 March 2012

Work Responsibilities:

•Ensure that the workforce comply to all safety standards and site procedures.

•Ensure welders comply to the welding standard, procedures, wps’s and usage of correct consumables for specific materials and welding processes.

•Do fit-up inspections, root inspections, weld completion inspections, equipment inspections, certification inspections

•To ensure welders and foreman’s daily productions meet management completion dates.

•Test welders, coach welders in weld techniques and RT failures (advice of poor weld techniques and RT failures) -problem solving.

•15 welders and 5 assistants working under my supervision

Company: Kentz (Moatize Coal-Mozambique)

Agent : Cap Africa-Tel:011-*******

Position held: Welding Foreman

Duration: November 2010 – May 2011

Work Responsibilities:

•Ensure that the workforce comply to all safety standards and site procedures.

•Ensure welders comply to the welding standard, procedures, wps’s and usage of correct consumables for specific materials and welding processes.

•Do fit-up inspections, root inspections, weld completion inspections, equipment inspections, certification inspections.

•To ensure welders and foreman’s daily productions meet management completion dates.

•Qualify welders,train welders in weld techniques and RT failures (advice of poor weld techniques and RT failures) –defects problem solving.

•20 welders and 12 assistants working under my supervision

Company: Kentz (RBM-TTP Project)

Agent: Global Placements

Position held: Welding Supervisor

Duration: 20 April 2010 – 30 October 2010

Work Responsibilities:

•Ensure that the workforce comply to all safety standards and site procedures.

•Ensure welders comply to the welding standard, procedures, wps’s and usage of correct consumables for specific materials and welding processes.

•Do fit-up inspections, root inspections, weld completion inspections, equipment inspections, certification inspections.

•To ensure welders and foreman’s daily productions meet management completion dates.

•Test welders, coach welders in weld techniques and RT failures (advice of poor weld techniques and RT failures) –defects problem solving.

•28 welders and 16 assistants working under my supervision

Company: LTA-Oxygen Plant(Sasol 2&3 Secunda)

Agent: CPC-Secunda

Position held: Double Coded Welder-Piping

Duration: 2010 February-2010 April

Work Responsibilities

•Welding of fabricated piping spools for stainless vessel and carbon lines

Company: GPU-Global Processing Utilities

Position held: Double Coded Welder(Cerveje De Mozambique)

Duration: 2009 May-2009 December

Work Responsibilities

•Welding of carbon piping on John Thompson boilers carbon pipe,stainlessteel dairy tube piping & structural steel.

Company: Madala Projects(Iran Juices- Food&Beverages)

SAB-Uganda-Jinja Breweries

Position held: P/fitter & Double Coded Welder

Duration: 2008 June-2008 December

Work Responsibilities

•Welding of carbon pipe,stainless steel dairy tube

Company: Kentz (Natref-Sasolberg)Shutdown

Position held: Double Code Welder-Piping

Duration: 2008March-2008June

Work Responsibilities

•Welding of carbon piping sch40-sch80

Company: Kentz(Moma Sands Mozambique)

Position held: Double Coded Welder-Piping

Year: 2007April-2008March

Work Responsibilities

•Welding of carbon piping,ducting and vessels on roaster plant.

Company: Rabbit Engineering(SAB-Chamdor,Alrode)

SAB-(Angola-Lubango) Consol Glass- Wadeville

Tanzania-Mwanza Breweries

Position held: Pipe Fitting & Double Coded Welder

Year: 2004July-2006 December

Company: FABINOX-Workshop (Mondi expansion R/BAY)

Position held: Workshop-Stainless Piping Fabrications

Year: 2004March-2004June

Company: FABINOX-SHELL DEPOT (Ladysmith)

Position: Double Coded Welder-Piping

Year: 2004January-2004March

Company: MOSSGAS-(Project)

Agent: SA FIVE

Position: Double Coded Welder-Piping

Year: 2003June-2004January

Company: LTA-TYKOR SANDS MINERALS PROJECT

Position: Double Coded Welder-Piping

Year: 2002October-2003March

Company: FLUOR-SASOL 2 & 3(Workshop)

Position held: Double Coded Welder-Piping

Year: 2002August-2002October

Company: KENTZ-Sapref-(Shutdown)

Position held: Carbon,Chrome,Nickel alloys-welder(Pipe)

Year: 2002May-2002July

Company: KENTZ-FOSKOR Fertilizations-Expansions

Position held: Double Coded Welder-Piping

Year: 2002January-2002May

Company: Genrec Engineering-Workshop Richards Bay

Pipe Fabrications for FOSKOR Fertilizations

Position held: Double Coded Welder-Piping

Year: 2001August-2002January

Company: DORMAC Engineering

Tank Fabrications for FOSKOR Fertilizations Rbay

Position held: GTAW,SMAW Welder

Year: 2001March-2001August

Company: CAILLARD-Richards Bay Harbour

Building Of Ship Loaders & Ship Off-Loaders

Position: Structural Welder

Year: 1999August-2000August

Company: SYDCOR-RBM POND A-Expansion

Position held: Double Coded Welder-Piping,Structural,Flux Co

Year: 1999Febuary-1999August

Company: Rowley Morgan Engineering

Agent: World Manpower Specialists

Position held: Flux Co,Smaw-Ship Repairs & Workshop Fabrications Of Ship-Loaders & Off-Loaders

Year: 1998may-1998December

Company: Genrec Engineering-Mondi-shutdown

Position held: Double Coded Welder-Piping

Year: 1997August-1997October

Company: Boskalis-Harbour Dredging Company

Position held: Boilermaking & Pipe-Smaw Welding

Year: 1997April-1997July

Company: Indian Ocean Fertilizations

Agent: Omega Engineering

Position held: Carbon Pipe Welder (Gas Line)-Piping

Year: 1996October-1997March

Company: Sasol 2 & 3-Sulphur Plant-Shutdown

Agent: Hydra-Arc

Position held: Double Coded Welder-Piping

Year: 1996August-1996October

Company: Genrec Engineering-Syncat Fuels-Richards Bay-Workshop

Position held: Tacker-Carbon & Stainless Piping

Year: 1996April-1996July

Company: Vandewille Engineering

Position: Boilermaking & Welding(Smaw,Flux Co,CO2)

Year: 1995March-1996Febuary

Company: ND Engineering-Mondi-Papermill-Richardsbay

Position held: Structural Welder-Pipe supports

Year: 1994March-1994December

WELDING EXPERIENCE

-I have 27 years experience in welding with various materials and processes like SMAW,GTAW,GMAW,FCAW.

-I have worked in oil & gas, workshops, mines,mills,refineries,petrochemical

(sapref/mossgas/sasol 1,2,3/natref)breweries,powerstations and coded

on many exotic materials.

OTHER SKILLS

-Computer literate (Microsoft,Word,Excel)

-Excellent Typing Skills and Communication

-Knowledge of Internet

-Emailing

DEVELOP ABILITIES

-I have great discipline and routine skills, I have disciplined myself to be industrious and persevere under difficult circumstances.

-I have great time management skills.

-I am a group leader and exercise group dynamics and personal interaction.

-I don't have a problem to interact, respect and communicate with people of different cultures and creeds.

-I always value people and their diversity and respect their dignity.

CAREER OBJECTIVES

-To have job satisfaction and to ensure that I always produce only my very best.

-To use a certain degree of initiative in achieving working results.

-Work with people of varying abilities in order to learn and also share with them my expertise and experience.

-To be successful in all aspects of my life and work environment.

CAREER INTEREST

-To further my studies in relevant business in order to meet the needs of the company.

-To use my skills to assist and develop the under developed for the betterment of the individual and be a progressive person in my chosen career.

HOW I SEE MYSELF

- I am a very hardworking and extremely trustworthy person. I work very well under pressure.

- I am not the kind of person that needs to be watched I can be trusted to work on my own. I am a well organized person because routine, discipline and planning are part of who I am.

-I have good telephone manners and like meeting new people.

-I have ultimate respect for other people and therefore have no problem in following orders.

-I love learning new work and like to believe that I am a fast learner.

- I don’t like to waste time and therefore I keep myself busy with anything that needs to be done.

REFERENCES

Isizwe Placements (Agent)-Medupi powerstation

Tel: 014-*******

Vusi Masuku (QA/QC Manager)

Company: Kentz Medupi Powerstation

Tel: 083*******

Sunil Sundar (Lead QC)

Company: GE-Medupi Powerstation

Tel: 063*******

Shaheed Babar (Welding Superintendent )

Kentz Medupi Powerstation

Tel: 083*******

Riaan Van Schalkwyk (Piping Manager)

Company: Kentz-Medupi Powerstation

Tel: 083*******

AMT Placements (Agent)-Sasol 1-Waxplant

Tel: 086*******

Cap Africa-Kentz Mozambique

Tel: 011-*******

Global Placements (RBM-TTP Projects)

Tel: 035-*******

GPU Mechanical services

Ref: Marco Rainho

Tel: 011******* or 082*******

SNC Lavalin

Ref: Pieter Brits (Construction Manager)

Tel: 011*******/011******* or 083*******

SNC Lavalin

Ref: Len Steyn (Project Manager)



Contact this candidate